§25.604. Preaward determination concerning the inapplicability of section 1605 of the Recovery Act or the Buy American statute. — Inbound Citations
48 C.F.R. § 25.604
Statutory Authority
Cited by 1 regulation in release Current.
Citations to 48 U.S.C. § 25.604 as a whole
-
(a) If the contracting officer has determined that an exception applies because the cost of certain domestic construction material is unreasonable, in accordance with section 25.604, then the contracting officer shall apply evaluation factors to the offer incorporating the use of such foreign construction material as follows:(1) Use an evaluation factor of 25 percent, applied to the total offered price of the contract, if foreign manufactured construction material is incorporated in the offer based on an exception for unreasonable cost of comparable domestic construction material requested by the offeror.(2) In addition, use an evaluation factor of 20 percent applied to the cost of foreign unmanufactured construction material incorporated in the offer based on an exception for unreasonable cost of comparable domestic unmanufactured construction material requested by the offeror.(3) Total evaluated price = offered price + (.25 × offered price, if (a)(1) applies) + (.20 × cost of foreign unmanufactured construction material, if (a)(2) applies).