§247.270-2. Technical provisions.
48 C.F.R. § 247.270-2
Because conditions vary at different ports, and sometimes within the same port, it is not practical to develop standard technical provisions covering all phases of stevedoring operations.
When including rail car, truck, or intermodal equipment loading and unloading, or other dock and terminal work under a stevedoring contract, include these requirements as separate items of work.
Notes, amendments, and revision history
Amendments
[65 FR 50144, Aug. 17, 2000. Redesignated at 75 FR 51417, Aug. 20, 2010]
Authority
Authority: 41 U.S.C. 1303 and 48 CFR chapter 1.
Source
Source: 56 FR 36466, July 31, 1991, unless otherwise noted.
Amendments
[65 FR 50144, Aug. 17, 2000. Redesignated at 75 FR 51417, Aug. 20, 2010]