§206.303-2. Content.
48 C.F.R. § 206.303-2
In lieu of the threshold at FAR 6.303-2(b), each justification shall include the information at FAR 6.303-2(b), except for sole-source 8(a) contracts over $100 million (see paragraph (d) of this section).
Include the information required by PGI 206.303-2(b)(i) in justifications citing the authority at FAR 6.302-1.
In lieu of the threshold at FAR 6.303-2(d), each justification for a sole-source 8(a) contract over $100 million shall include the information at FAR 6.303-2(d).
Notes, amendments, and revision history
Amendments
[80 FR 21657, Apr. 20, 2015, as amended at 85 FR 34529, June 5, 2020]
Authority
Authority: 41 U.S.C. 1303 and 48 CFR chapter 1.
Source
Source: 56 FR 36303, July 31, 1991, unless otherwise noted.
Amendments
[80 FR 21657, Apr. 20, 2015, as amended at 85 FR 34529, June 5, 2020]