US Codex
C.F.R.
Browse by date
Notes

§1519.503. Class set-aside for construction.

48 C.F.R. § 1519.503

(a)
Each proposed acquisition for construction estimated to cost between $10,000 and $1,000,000 shall be set-aside for exclusive small business participation. Such set-asides shall be considered to be unilateral small business set-asides, and shall be withdrawn in accordance with the procedure of FAR 19.506 only if found not to serve the best interest of the Government.
(b)
Small business set-aside preferences for construction acquisitions in excess of $1,000,000 shall be considered on a case-by-case basis.
Notes, amendments, and revision history

Authority

Authority: Sec. 205(c), 63 Stat. 390, as amended, 40 U.S.C. 486(c).

Source

Source: 82 FR 33019, July 19, 2017, unless otherwise noted.