US Codex
C.F.R.
Browse by date
Notes

§1425.202. Exceptions.

48 C.F.R. § 1425.202

(a)
(1)
The CO may determine the reasonableness of cost as determined by the formula in 1425.203-70.
(2)
The Director, PAM has the authority to make the determination that use of U.S. construction material would be impracticable. Failure of the Director, PAM to issue a determination within 30 days after receipt of a request will be deemed approval for use of the cited foreign material.
(3)
For items not on the list at FAR 25.108(d), the CCO may make the non-availability determination if the items cost less than the SAT. The HCA may make the non-availability determination when the cost of the items exceeds the SAT.
(b)
[Reserved]
Notes, amendments, and revision history

Authority

Authority: Sec. 205(c), 63 Stat. 390, 40 U.S.C. 486(c); and 5 U.S.C. 301.

Source

Source: 75 FR 19829, Apr. 15, 2010, unless otherwise noted.