§25.211. Analog video transmissions in the FSS. — Inbound Citations
47 C.F.R. § 25.211
Statutory Authority
Cited by 7 regulations in release Current.
Citations to 47 U.S.C. § 25.211 as a whole
-
(iii) The application meets all relevant criteria in § 25.211 or § 25.212 or includes information filed pursuant to paragraph (g)(1) of this section indicating that off-axis EIRP density from the proposed earth stations will not exceed relevant levels specified in § 25.218; and
-
(h) Applications for authority for fixed earth station operation in the conventional C-band, the extended C-band, the conventional Ku-band, the extended Ku-band, the conventional Ka-band, or the extended Ka-band that do not qualify for routine processing under relevant criteria in this section, § 25.211, or § 25.218 are subject to the requirements in § 25.220.
-
(a) The requirements in this section apply to applications for, and operation of, earth stations transmitting in the conventional or extended C-bands, the conventional or extended Ku-bands, or the conventional or extended Ka -bands that do not qualify for routine licensing under relevant criteria in § 25.211, § 25.212, or § 25.218.
Citations to §25.211(a)
-
(b) Emissions with an occupied bandwidth of less than 2 MHz are not protected from interference from wider bandwidth transmissions if the r.f. carrier frequency of the narrowband signal is within ±1 MHz of one of the frequencies specified in § 25.211(a).
Citations to §25.211(d)
-
(2) Contiguous United States (CONUS). For purposes of subparts B and C of this part, the contiguous United States consists of the contiguous 48 states and the District of Columbia as defined by Partial Economic Areas Nos. 1-41, 43-211, 213-263, 265-297, 299-359, and 361-411, which includes areas within 12 nautical miles of the U.S. Gulf coastline. In this context, the rest of the United States includes the Honolulu, Anchorage, Kodiak, Fairbanks, Juneau, Puerto Rico, Guam-Northern Mariana Islands, U.S. Virgin Islands, American Samoa, and the Gulf of Mexico PEAs (Nos. 42, 212, 264, 298, 360, 412-416). See § 27.6(m) of this chapter.Conventional C-band. The 3700-4200 MHz (space-to-Earth) and 5925-6425 MHz (Earth-to-space) FSS frequency bands.Conventional Ka-band. The 18.3-18.8 GHz (space-to-Earth), 19.7-20.2 GHz (space-to-Earth), 28.35-28.6 GHz (Earth-to-space), and 29.25-30.0 GHz (Earth-to-space) frequency bands, which the Commission has designated as primary for GSO FSS operation.Conventional Ku-band. The 11.7-12.2 GHz (space-to-Earth) and 14.0-14.5 GHz (Earth-to-space) FSS frequency bands.Coordination distance. When determining the need for coordination, the distance on a given azimuth from an earth station sharing the same frequency band with terrestrial stations, or from a transmitting earth station sharing the same bidirectionally allocated frequency band with receiving earth stations, beyond which the level of permissible interference will not be exceeded and coordination is therefore not required. (RR)Direct Broadcast Satellite (DBS) Service. A radiocommunication service in which signals transmitted or retransmitted by Broadcasting-Satellite Service space stations in the 12.2-12.7 GHz band are intended for direct reception by subscribers or the general public. For the purposes of this definition, the term direct reception includes individual reception and community reception.Earth station. A station located either on the Earth's surface or within the major portion of the Earth's atmosphere intended for communication:
-
(2) Applications to license networks of earth stations operating in the 3700-4200 MHz and 5925-6425 MHz bands must be filed electronically on FCC Form 312, Main Form and Schedule B. Applications will be routinely processed provided that frequency coordination has been satisfactorily completed and that the proposed earth stations comply with the applicable provisions in § 25.211(d) or § 25.212(d). Alternatively, applicants that have satisfactorily completed frequency coordination may be routinely processed if the proposed earth stations comply with the applicable off-axis EIRP density limits in § 25.218(c) or (d).(i) For earth station antennas operating with power levels not consistent with the applicable provisions in § 25.211(d) or § 25.212(d), or with EIRP density levels not consistent with those specified in § 25.218(c) or (d), the applicant must file an initial lead application providing a detailed overview of the complete network. Such lead applications must fully identify the scope and nature of the service to be provided, as well as the complete technical details of each representative type of antenna that will operate within the network. Such lead applications for a single system must identify:(A) No more than three geostationary satellites to be accessed;(B) The amount of frequency bandwidth sought, up to a maximum of 20 MHz of spectrum in each direction at each of the satellites (The same 20 MHz of uplink and 20 MHz of downlink spectrum at each satellite would be accessible by all earth stations in the system. The 20 MHz of uplink and 20 MHz of downlink spectrum need not be the same at each satellite location);(C) The maximum number of earth station sites;(ii) Following the issuance of a license for the lead application, the licensee shall notify the Commission of the complete technical parameters of each individual earth station site before that site is bought into operation under the lead authorization. Full frequency coordination of each individual site (e.g., for each satellite and the spectrum associated therewith) shall be completed prior to filing Commission notification. The coordination must be conducted in accordance with § 25.203. Such notification shall be done by electronic filing and shall be consistent with the technical parameters of Schedule B of FCC Form 312.(iii) Following successful coordination of such an earth station, if the earth station operator does not file a lead application or a Schedule B within six months after it successfully completes coordination, it will be assumed that such frequency use is no longer desired, unless a second notification has been received within ten days prior to the end of the six month period. Such renewal notifications must be sent to all parties concerned. If the lead application or Schedule B, or renewal notification, is not timely received, the coordination will lapse and the licensee must re-coordinate the relevant earth stations if it still wishes to bring them into operation.(iv) Operation of each individual site may commence immediately after the public notice is released that identifies the notification sent to the Commission and if the requirements of paragraph (c)(2)(vi) of this section are met. Continuance of operation of each station for the duration of the lead license term shall be dependent upon successful completion of the normal public notice process. If any objections are received to the new station prior to the end of the 30 day comment period of the Public Notice, the licensee shall immediately cease operation of those particular stations until the coordination dispute is resolved and the licensee informs the Commission of the resolution. If the requirements of paragraph (c)(2)(vi) of this section are not met, operation may not commence until the Commission issues the public notice acting on the terminal authorization.(v) Each licensee shall annually provide the Commission an updated list of all operational earth stations in its system. The annual list shall also include a list of all earth stations deactivated during the year and identification of the satellites providing service to the network as of the date of the report.(A) An applicant for a new radio station or modification of an existing station authorized under paragraph (c)(2)(i) of this section in the 3700-4200; or 5925-6425 MHz bands may operate the proposed station during the pendency of its application after the release of the public notice accepting the notification for filing that complies with paragraph (c)(2)(ii) of this section. The applicant, however, must first certify that the following conditions are satisfied:(1) The frequency coordination procedures of § 25.203 have been successfully completed;(2) The antenna structure has been previously studied by the Federal Aviation Administration and determined to pose no hazard to aviation safety as required by subpart B of part 17 of this chapter; or the antenna or tower structure does not exceed 6.1 meters above ground level or above an existing man-made structure (other than an antenna structure), if the antenna or tower has not been previously studied by the Federal Aviation Administration and cleared by the FCC;(3) The grant of the application(s) does not require a waiver of the Commission's rules (with the exception of a request for waiver pertaining to fees);(4) The applicant has determined that the facility(ies) will not significantly affect the environment as defined in § 1.1307 of this chapter after complying with any applicable environmental notification procedures specified in § 17.4(c) of this chapter.(5) The station site does not lie within 56.3 kilometers of any international border or within a radio “Quiet Zone” identified in § 1.924 of this chapter; and(6) The filed application is consistent with the proposal that was coordinated pursuant to § 25.251.(B) Conditional authority ceases immediately if the Schedule B is returned by the Commission because it is not accepted for filing.(C) A conditional authorization pursuant to paragraphs (c)(2)(vi)(A) and (c)(2)(vi)(B) of this section is evidenced by retaining a copy of the Schedule B notification with the station records. Conditional authorization does not prejudice any action the Commission may take on the subject application(s) or the Schedule B notifications.(D) Conditional authority is accepted with the express understanding that such authority may be modified or cancelled by the Commission at any time without hearing if, in the Commission's discretion, the need for such action arises. An applicant operating pursuant to this conditional authority assumes all risks associated with such operation, the termination or modification of the conditional authority, or the subsequent dismissal or denial of its application(s).(E) The copy of the Schedule B notification form must be posted at each station operating pursuant to this section.(vii) Construction of each earth station must be completed and the station must be brought into regular operation within twelve months from the date that action is taken to authorize that station to operate under the lead authorization, except as may be otherwise determined by the Commission for any particular application.