§25.210. Technical requirements for space stations. — Inbound Citations
47 C.F.R. § 25.210
Statutory Authority
Cited by 9 regulations in release Current.
Citations to 47 U.S.C. § 25.210 as a whole
-
(d) Space stations authorized after May 10, 1993 which do not satisfy the requirements of § 25.210 may be required to accept greater constraints in resolving interference problems than complying ones. The extent of these constraints shall be determined on a case-by-case basis.
Citations to §25.210(d)
-
(1) For all NGSO-like satellite licenses, except as specified in paragraph (b)(4) of this section, for which the application was filed pursuant to the procedures set forth in § 25.157 after August 27, 2003, authorizing operations in a frequency band for which the Commission has not adopted frequency band-specific service rules at the time the license is granted, the licensee will be required to comply with the technical requirements in paragraphs (b)(2) through (4) of this section, notwithstanding the frequency bands specified in these sections: §§ 25.143(b)(2)(ii) (except NGSO FSS systems) and (iii) (except NGSO FSS systems), 25.204(e), and 25.210(f) and (i).
Citations to §25.210(f)
-
(1) For all NGSO-like satellite licenses, except as specified in paragraph (b)(4) of this section, for which the application was filed pursuant to the procedures set forth in § 25.157 after August 27, 2003, authorizing operations in a frequency band for which the Commission has not adopted frequency band-specific service rules at the time the license is granted, the licensee will be required to comply with the technical requirements in paragraphs (b)(2) through (4) of this section, notwithstanding the frequency bands specified in these sections: §§ 25.143(b)(2)(ii) (except NGSO FSS systems) and (iii) (except NGSO FSS systems), 25.204(e), and 25.210(f) and (i).
Citations to §25.210(i)
-
(13) And the polarization information necessary to determine compliance with § 25.210(i).
-
(1) For all NGSO-like satellite licenses, except as specified in paragraph (b)(4) of this section, for which the application was filed pursuant to the procedures set forth in § 25.157 after August 27, 2003, authorizing operations in a frequency band for which the Commission has not adopted frequency band-specific service rules at the time the license is granted, the licensee will be required to comply with the technical requirements in paragraphs (b)(2) through (4) of this section, notwithstanding the frequency bands specified in these sections: §§ 25.143(b)(2)(ii) (except NGSO FSS systems) and (iii) (except NGSO FSS systems), 25.204(e), and 25.210(f) and (i).
-
(c) If no good faith agreement can be reached, the operator of the FSS space station transmitting in the 17.3-17.8 GHz band that does not comply with § 25.140(a)(3)(iii) or the operator of the 17/24 GHz BSS space station that does not comply with § 25.140(b)(3), shall reduce its power flux-density levels to be compliant with those specified in § 25.140(a)(3)(iii) and/or (b)(3) as appropriate.
Citations to §25.210(j)
-
(1) For all GSO-like satellite licenses for which the application was filed pursuant to the procedures set forth in § 25.158 after August 27, 2003, authorizing operations in a frequency band for which the Commission has not adopted frequency band-specific service rules at the time the license is granted, the licensee will be required to comply with the following technical requirements, notwithstanding the frequency bands specified in these rule provisions: §§ 25.143(b)(2)(iv), 25.204(e), and 25.210(f), (i), and (j).
-
(c) If no good faith agreement can be reached, the operator of the FSS space station transmitting in the 17.3-17.8 GHz band that does not comply with § 25.140(a)(3)(iii) or the operator of the 17/24 GHz BSS space station that does not comply with § 25.140(b)(3), shall reduce its power flux-density levels to be compliant with those specified in § 25.140(a)(3)(iii) and/or (b)(3) as appropriate.