US Codex
C.F.R.
Browse by date
Notes

§22.971. Obligation to abate unacceptable interference. — Inbound Citations

47 C.F.R. § 22.971

Cited by 2 regulations in release Current.

Citations to 47 U.S.C. § 22.971 as a whole

  • (b) If two or more licensees, whether in the commercial aviation air-ground radiotelephone service or in the Cellular Radiotelephone Service (see § 22.971), knowingly or unknowingly, directly or indirectly, cause or contribute to causing unacceptable interference to a non-cellular part 90 licensee in the 800 MHz band, as defined in § 22.877, such licensees shall be jointly and severally responsible for abating interference, with full cooperation and utmost diligence, in the shortest practicable time.
    (1) This joint and several responsibility rule requires interfering licensees to consider all feasible interference abatement measures, including, but not limited to, the remedies specified in the interference resolution procedures set forth in § 22.879(c). This joint and several responsibility rule applies to all forms of interference, including out-of-band emissions and intermodulation.
    (2) Any licensee that can show that its signal does not directly or indirectly cause or contribute to causing unacceptable interference to a non-cellular part 90 licensee in the 800 MHz band, as defined in § 22.877, shall not be held responsible for resolving unacceptable interference. Notwithstanding, any licensee that receives an interference complaint from a public safety/CII licensee shall respond to such complaint consistent with the interference resolution procedures set forth in § 22.879.
  • (c) At least 30 days but not more than 90 days prior to activating a base station at the higher ERP limits permitted under paragraphs (a)(3) and (4) of this section, the Cellular licensee must provide written advance notice to any public safety licensee authorized in the frequency range 806-816 MHz/851-861 MHz with a base station located within a radius of 113 km of the Cellular base station to be deployed. The written notice shall be required only one time for each such cell site and is for informational purposes only; the public safety licensees are not afforded the right to accept or reject the activation or to unilaterally require changes in the operating parameters. The written notification must include the base station's location, ERP level, height of the transmitting antenna's center of radiation above ground level, and the timeframe for activation, as well as the Cellular licensee's contact information. Additional information shall be provided by the Cellular licensee upon request of a public safety licensee required to be notified under this paragraph (c). See also §§ 22.970 through 22.973.