US Codex
C.F.R.
Browse by date
Notes

§22.949. Unserved Area licensing; minimum coverage requirements. — Inbound Citations

47 C.F.R. § 22.949

Cited by 5 regulations in release Current.

Citations to 47 U.S.C. § 22.949 as a whole

  • Two or more pending applications are mutually exclusive if the grant of one application would effectively preclude the grant of one or more of the others under Commission rules governing the Public Mobile Services involved. The Commission uses the general procedures in this section for processing mutually exclusive applications in the Public Mobile Services. Additional specific procedures are prescribed in the subparts of this part governing the individual Public Mobile Services (see §§ 22.509, 22.717, and 22.949) and in part 1 of this chapter.
  • The Cellular Geographic Service Area (CGSA) of a Cellular system is the geographic area considered by the FCC to be served by the Cellular system and is the area within which cellular systems are entitled to protection and adverse effects for the purpose of determining whether a petitioner has standing are recognized. The CGSA is the composite of the service areas of all of the cells in the system, excluding any Unserved Area (even if it is served on a secondary basis) or area within the CGSA of another Cellular system. The service area of a cell is the area within its service area boundary (SAB). Licensees that use power spectral density (PSD) at cell sites within their licensed geographic area are subject to paragraph (c) of this section; all other licensees are subject to paragraph (a) (or, as applicable, paragraph (b)) of this section. If the calculation under paragraph (a), (b), or (c) of this section (as applicable) yields an SAB extension comprising at least 130 contiguous square kilometers (50 contiguous square miles), the licensee must submit an application for major modification of the CGSA using FCC Form 601. See also §§ 22.912, 22.949, and 22.953.
  • (ii) Extend coverage into Unserved Area on a secondary basis (see § 22.949), the ERP of base transmitters and repeaters must not exceed—
    (A) 1000 watts per emission; or
    (B) 800 watts/MHz (PSD) per sector.
  • The construction period applicable to new or modified Cellular facilities for which an authorization is granted pursuant to the Unserved Area process is one year, beginning on the date the authorization is granted. To satisfy this requirement, a Cellular system must be providing service to mobile stations operated by subscribers and roamers. The licensee must notify the FCC (FCC Form 601) after the requirements of this section are met. See § 1.946 of this chapter. See also § 22.949.
  • (d) The GMCZ is subject to the Unserved Area licensing procedures set forth in § 22.949.