§2.932. Modification of equipment. — Inbound Citations
47 C.F.R. § 2.932
Statutory Authority
Cited by 6 regulations in release Current.
Citations to 47 U.S.C. § 2.932 as a whole
-
(b) Sections 2.906 through 2.1077 describe the procedure for a Supplier's Declaration of Conformity and the procedures to be followed in obtaining certification and the conditions attendant to such a grant.
-
(d) Notwithstanding other provisions of § 2.939, to the extent a false statement or representation is made in the equipment certification application (see §§ 2.911(d)(5)-(7), 2.932, 2.1033, and 2.1043), or in materials or responses submitted in connection therewith, that the equipment in the subject application is not prohibited from receiving an equipment authorization pursuant to § 2.903, and the equipment certification or modification was granted, if the Commission subsequently determines that the equipment is covered communications equipment, the Commission will revoke such authorization.(1) If the Office of Engineering and Technology and the Public Safety and Homeland Security Bureau determine that particular authorized equipment is covered communications equipment, and that the certification application for that equipment contained a false statement or representation that the equipment was not covered communications equipment, they will provide written notice to the grantee that a revocation proceeding is being initiated and the grounds under consideration for such revocation.(2) The grantee will have 10 days in which to respond in writing to the reasons cited for initiating the revocation proceeding. The Office of Engineering and Technology and the Public Safety and Homeland Security Bureau will then review the submissions, request additional information as may be appropriate, and make their determination as to whether to revoke the authorization, providing the reasons for such decision.
-
(c) Only the grantee of the equipment certification may modify the design of a certified Personal Radio Service transmitter type, and then only pursuant to and in full compliance with the requirements and procedures for permissible changes and modifications in part 2 of this chapter. See §§ 2.932 and 2.1043 of this chapter.
Citations to §2.932(b)
-
(a) A new application for an equipment authorization shall be filed whenever there is a change in the design, circuitry or construction of an equipment or device for which an equipment authorization has been issued, except as provided in paragraphs (b) through (d) of this section.
Citations to §2.932(c)
-
(a) A new application for an equipment authorization shall be filed whenever there is a change in the design, circuitry or construction of an equipment or device for which an equipment authorization has been issued, except as provided in paragraphs (b) through (d) of this section.
Citations to §2.932(d)
-
(a) A new application for an equipment authorization shall be filed whenever there is a change in the design, circuitry or construction of an equipment or device for which an equipment authorization has been issued, except as provided in paragraphs (b) through (d) of this section.