§17.4. Antenna structure registration. — Inbound Citations

47 C.F.R. § 17.4

Cited by 17 regulations in release Current.

Citations to 47 C.F.R. § 17.4 as a whole

  • (b) Any antenna structure that requires notification to the Federal Aviation Administration (FAA) must be registered with the Commission prior to construction under § 17.4 of this chapter.
  • (2) Any antenna structure that requires notification to the Federal Aviation Administration (FAA) must be registered with the Commission prior to construction under § 17.4 of this chapter.
  • (2) The proposed antenna structure has been previously studied by the Federal Aviation Administration and determined to pose no hazard to aviation safety as required by § 17.4 of the Commission's Rules; or the proposed antenna or tower structure does not exceed 6.1 meters (20 feet) above ground level or above an existing man-made structure (other than an antenna structure), if the antenna or tower has not been previously studied by the Federal Aviation Administration and cleared by the FCC.
  • (2) Any antenna structure that requires notification to the Federal Aviation Administration (FAA) must be registered with the Commission prior to construction under § 17.4 of this chapter.

Citations to §17.4(a)

Citations to §17.4(c)

  • (2) In accordance with § 1.1307 and § 17.4(c) of this chapter, the Bureau will address any environmental concerns prior to processing the registration.
  • (1) Environmental processing shall be completed pursuant to the process set forth in § 17.4(c) of this chapter for any facilities that use one or more new or existing antenna structures for which a new or amended registration is required by part 17 of this chapter. Environmental review by the Commission must be completed prior to construction.
  • (4) Application or amendment requesting authorization for a facility that may have a significant environmental effect as defined in § 1.1307, unless the facility has been determined not to have a significant environmental effect through the process set forth in § 17.4(c) of this chapter.
  • (g) The Commission may dismiss license applications (FCC Form 601) associated with proposed antenna structure(s) subject to § 17.4(c) of this chapter, if pending more than 60 days and awaiting submission of an Environmental Assessment or other environmental information from the applicant, unless the applicant has provided an affirmative statement reflecting active pursuit during the previous 60 days of environmental review for the proposed antenna structure(s). To avoid potential dismissal of its license application, the license applicant must provide updates every 60 days unless or until the applicant has submitted the material requested by the Bureau.
  • (A) An applicant for a new radio station or modification of an existing station authorized under paragraph (c)(2)(i) of this section in the 3700-4200; or 5925-6425 MHz bands may operate the proposed station during the pendency of its application after the release of the public notice accepting the notification for filing that complies with paragraph (c)(2)(ii) of this section. The applicant, however, must first certify that the following conditions are satisfied:
    (1) The frequency coordination procedures of § 25.203 have been successfully completed;
    (2) The antenna structure has been previously studied by the Federal Aviation Administration and determined to pose no hazard to aviation safety as required by subpart B of part 17 of this chapter; or the antenna or tower structure does not exceed 6.1 meters above ground level or above an existing man-made structure (other than an antenna structure), if the antenna or tower has not been previously studied by the Federal Aviation Administration and cleared by the FCC;
    (3) The grant of the application(s) does not require a waiver of the Commission's rules (with the exception of a request for waiver pertaining to fees);
    (4) The applicant has determined that the facility(ies) will not significantly affect the environment as defined in § 1.1307 of this chapter after complying with any applicable environmental notification procedures specified in § 17.4(c) of this chapter.
    (5) The station site does not lie within 56.3 kilometers of any international border or within a radio “Quiet Zone” identified in § 1.924 of this chapter; and
    (6) The filed application is consistent with the proposal that was coordinated pursuant to § 25.251.
  • (g) The environmental assessment required by §§ 1.1307 and 1.1311 of this chapter, if applicable. If an application filed under this part proposes the use of one or more new or existing antenna structures that require registration under part 17 of this chapter, any required environmental assessment should be submitted pursuant to the process set forth in § 17.4(c) of this chapter rather than with the application filed under this part.
  • (b) includes rules of practice and procedure for the filing of applications for stations to operate in the Wireless Telecommunications Services, adjudicatory proceedings including hearing proceedings, and rule making proceedings; procedures for reconsideration and review of the Commission's actions; provisions concerning violation notices and forfeiture proceedings; and the environmental processing requirements that, together with the procedures specified in § 17.4(c) of this chapter, if applicable, must be complied with prior to initiating construction.

Citations to §17.4(c)(3)

Citations to §17.4(c)(4)

Citations to §17.4(f)

  • (c) If the owner of the antenna structure cannot file FCC Form 854 because it is subject to a denial of Federal benefits under the Anti-Drug Abuse Act of 1988, 21 U.S.C. 862, the first tenant licensee authorized to locate on the structure (excluding tenants that no longer occupy the structure) must electronically register the structure using FCC Form 854, and provide a copy of the Antenna Structure Registration (FCC Form 854R) to the owner. The owner remains responsible for providing to all tenant licensees and permittees notification that the structure has been registered, consistent with § 17.4(f), and for posting the registration number as required by § 17.4(g).

Citations to §17.4(g)

  • (4) If the owner of the antenna structure cannot file FCC Form 854 because it is subject to a denial of Federal benefits under the Anti-Drug Abuse Act of 1988, 21 U.S.C. 862, the first licensee authorized to locate on the structure must register the structure using FCC Form 854, and provide a copy of the Antenna Structure Registration (FCC Form 854R) to the owner. The owner remains responsible for providing a copy of FCC Form 854R to all tenant licensees on the structure and for posting the registration number as required by § 17.4(g) of this chapter.
  • (c) If the owner of the antenna structure cannot file FCC Form 854 because it is subject to a denial of Federal benefits under the Anti-Drug Abuse Act of 1988, 21 U.S.C. 862, the first tenant licensee authorized to locate on the structure (excluding tenants that no longer occupy the structure) must electronically register the structure using FCC Form 854, and provide a copy of the Antenna Structure Registration (FCC Form 854R) to the owner. The owner remains responsible for providing to all tenant licensees and permittees notification that the structure has been registered, consistent with § 17.4(f), and for posting the registration number as required by § 17.4(g).