US Codex
C.F.R.
Browse by date
Notes

§11.61. Tests of EAS procedures. — Inbound Citations

47 C.F.R. § 11.61

Cited by 5 regulations in release Current.

Citations to 47 U.S.C. § 11.61 as a whole

  • (a) No person may transmit or cause to transmit the EAS codes or Attention Signal, or a recording or simulation thereof, in any circumstance other than in an actual National, State or Local Area emergency or authorized test of the EAS; or as specified in §§ 10.520(d), 11.46, and 11.61 of this chapter.

Citations to §11.61(a)(1)

  • (a) EAS Participants are responsible for ensuring that EAS Encoders, EAS Decoders, Attention Signal generating and receiving equipment, and Intermediate Devices used as part of the EAS to decode and/or encode messages formatted in the EAS Protocol and/or the Common Alerting Protocol are installed so that the monitoring and transmitting functions are available during the times the stations and systems are in operation. Additionally, EAS Participants must determine the cause of any failure to receive the required tests or activations specified in § 11.61(a)(1) and (2). Appropriate entries indicating reasons why any tests were not received must be made in the broadcast station log as specified in §§ 73.1820 and 73.1840 of this chapter for all broadcast streams and cable system records as specified in §§ 76.1700, 76.1708, and 76.1711 of this chapter. All other EAS Participants must also keep records indicating reasons why any tests were not received and these records must be retained for two years, maintained at the EAS Participant's headquarters, and made available for public inspection upon reasonable request.

Citations to §11.61(a)(1)(v)

Citations to §11.61(a)(2)

  • (a) EAS Participants are responsible for ensuring that EAS Encoders, EAS Decoders, Attention Signal generating and receiving equipment, and Intermediate Devices used as part of the EAS to decode and/or encode messages formatted in the EAS Protocol and/or the Common Alerting Protocol are installed so that the monitoring and transmitting functions are available during the times the stations and systems are in operation. Additionally, EAS Participants must determine the cause of any failure to receive the required tests or activations specified in § 11.61(a)(1) and (2). Appropriate entries indicating reasons why any tests were not received must be made in the broadcast station log as specified in §§ 73.1820 and 73.1840 of this chapter for all broadcast streams and cable system records as specified in §§ 76.1700, 76.1708, and 76.1711 of this chapter. All other EAS Participants must also keep records indicating reasons why any tests were not received and these records must be retained for two years, maintained at the EAS Participant's headquarters, and made available for public inspection upon reasonable request.

Citations to §11.61(a)(3)(iv)

  • (a) EAS plans contain guidelines which must be followed by EAS Participants' personnel, emergency officials, and National Weather Service (NWS) personnel to activate the EAS. The plans include the EAS header codes and messages that will be transmitted by key EAS sources (NP, LP, SP and SR). State and local plans contain unique methods of EAS message distribution such as the use of the Radio Broadcast Data System (RBDS). The plans also include information on actions taken by EAS Participants, in coordination with state and local governments, to ensure timely access to EAS alert content by non-English speaking populations. The plans must be reviewed and approved by the Chief, Public Safety and Homeland Security Bureau (Bureau), prior to implementation to ensure that they are consistent with national plans, FCC regulations, and EAS operation. The plans are administered by State Emergency Communications Committees (SECC). The Commission encourages the chief executive of each State to establish an SECC if their State does not have an SECC, and if the State has an SECC, to review the composition and governance of the SECC. The Bureau will review and approve plans, including annual updated plans, within 60 days of receipt, provided that no defects are found requiring the plan to be returned to the SECC for correction and resubmission. If a plan submitted for approval is found defective, the SECC will be notified of the required corrections, and the corrected plan may be resubmitted for approval, thus starting the 60-day review and approval period anew. The approval dates of State EAS Plans will be listed on the Commission's website.