US Codex
C.F.R.
Browse by date
Notes

§64.77. Inspection and test. — Inbound Citations

46 C.F.R. § 64.77

Cited by 3 regulations in release Current.

Citations to §64.77(a)

Citations to §64.77(b)

  • (a) The 30-month inspection of an MPT required in § 64.77(b) must include—
    (i) Corrosion;
    (ii) Cracking of base material; and
    (iii) Weld defects; and
    (2) A visual inspection for defective parts and a manual operation of the gauging device, remote operating mechanism, and each valve, except the pressure relief device.

Citations to §64.77(c)

  • (a) The hydrostatic test required in § 64.77(c) includes—
    (1) Closing each manhole and other openings by normal means of closure;
    (2) Using wrenches or other tools that are used during normal operations to close the manhole and other openings;
    (3) Using the same type of gaskets as used in service;
    (4) If required for the inspection, removing tank insulation;
    (5) Filling the tank with water and pressurizing to the test pressure indicated on the metal identification plate without leaking; and
    (6) If fitted with an internal heating coil, the heating coil passing a hydrostatic test at a pressure of 200 psig or more or 50 percent or more above the rated pressure of the coil, whichever is greater.