§62.20-1. Plans for approval.
46 C.F.R. § 62.20-1
The following plans must be submitted to the Coast Guard for approval in accordance with §§ 50.20-5 and 50.20-10 of this chapter:
A general arrangement plan of control and monitoring equipment, control locations, and the systems served.
Control and monitoring console, panel, and enclosure layouts.
Schematic or logic diagrams including functional relationships, a written description of operation, and sequences of events for all modes of operation.
A description of control or monitoring system connections to non-vital systems.
A description of programmable features.
A description of built-in test features and diagnostics.
Design Verification and Periodic Safety test procedures described in subpart 61.40 of this subchapter.
Control system normal and emergency operating instructions.
[Reserved]
Notes, amendments, and revision history
Amendments
[CGD 81-030, 53 FR 17838, May 18, 1988, as amended by USCG-2014-0688, 79 FR 58280, Sept. 29, 2014]
Source
Source: CGD 81-030, 53 FR 17838, May 18, 1988, as amended by USCG-2020-0634, 89 FR 50190, June 12, 2024, unless otherwise noted.
Authority
Authority: 46 U.S.C. 3306, 3703, 8105; sec. 617, Pub. L. 111-281, 124 Stat. 2905; E.O. 12234, 45 FR 58801, 3 CFR, 1980 Comp., p. 277; DHS Delegation No. 00170.1, Revision No. 01.4.
Source
Source: CGD 81-030, 53 FR 17838, May 18, 1988, unless otherwise noted.
Amendments
[CGD 81-030, 53 FR 17838, May 18, 1988, as amended by USCG-2014-0688, 79 FR 58280, Sept. 29, 2014]