§58.30-40. Plans.
46 C.F.R. § 58.30-40
Diagrammatic plans and lists of materials must be submitted for each of the fluid power and control systems listed in § 58.30-1(a) that is installed on the vessel. Plan submission must be in accordance with subpart 50.20 of this subchapter and must include the following:
The purpose of the system.
Its location on the vessel.
The maximum allowable working pressure.
The fluid used in the system.
Details of the system components in accordance with § 56.01-10(d) of this subchapter.
[Reserved]