US Codex
C.F.R.
Browse by date
Notes

§160.115-23. Procedure for approval of design or material change.

46 C.F.R. § 160.115-23

(a)
Each change in design, material, or construction from the plans approved under 46 CFR 159.005-13 and § 160.115-13(h) of this subpart must be approved by the Commandant before being used in any production winch. The manufacturer must submit any such change following the procedures in § 160.115-9 of this subpart, but documentation on items that are unchanged from the plans approved under 46 CFR 159.005-13 and § 160.115-13(h) of this subpart need not be resubmitted.
(b)
Unless determined by the Commandant to be unnecessary, a prototype winch with each change described in paragraph (a) of this section must be made and tested according to the procedures for new approvals in §§ 160.115-9 through 160.115-13 of this subpart.
(c)
Determinations of equivalence of design, construction, and materials will be made by the Commandant only.
Notes, amendments, and revision history

Source

Source: USCG-2010-0048, 76 FR 62976, Oct. 11, 2011, unless otherwise noted.

Authority

Authority: 46 U.S.C. 2103, 3306, 3703, 4302; E.O. 12234; 45 FR 58801; 3 CFR, 1980 Comp., p. 277; and DHS Delegation 00170.1, Revision No. 01.4.