§112.15-10. Loads on systems without a temporary emergency power source.
46 C.F.R. § 112.15-10
If there is no temporary emergency power source, the loads under § 112.15-1 must be arranged so that they can be energized from the final emergency power source.
Notes, amendments, and revision history
Authority
Authority: 46 U.S.C. 3306, 3703; DHS Delegation No. 00170.1, Revision No. 01.2.
Source
Source: CGD 74-125A, 47 FR 15267, Apr. 8, 1982, unless otherwise noted.