§3262.10. What operational requirements must I meet when drilling a well?
43 C.F.R. § 3262.10
When drilling a well, you must—
Keep the well under control at all times by—
Conducting training during your operation to maintain the capability of your personnel to perform emergency procedures quickly and effectively;
Using properly maintained equipment; and
Using operational practices that allow for quick and effective emergency response.
You must use sound engineering principles and take into account all pertinent data when:
Selecting and using drilling fluid types and weights;
Designing and implementing a system to control fluid temperatures;
Designing and using blowout prevention equipment; and
Designing and implementing a casing and cementing program.
Your operation must always comply with the requirements of § 3200.4.
Notes, amendments, and revision history
Authority
Authority: 30 U.S.C. 1001-1028; 43 U.S.C. 1701 et seq.; and Pub. L. 109-58.
Source
Source: 72 FR 24400, May 2, 2007, unless otherwise noted.