US Codex
C.F.R.
Browse by date
Notes

§3173.13. Requirements for approved facility measurement points. — Inbound Citations

43 C.F.R. § 3173.13

Cited by 3 regulations in release Current.

Citations to 43 C.F.R. § 3173.13 as a whole

  • (d) For a permanent measurement facility that comes into service after January 17, 2017, the operator must apply for approval of the FMP before any production leaves the permanent measurement facility. This requirement does not apply to temporary measurement equipment used during well testing operations. After timely submission and prior to approval of an FMP request, an operator must use the lease, unit PA, or CA number for reporting production to ONRR, until the BLM assigns an FMP number, at which point the operator must use the FMP number for all reporting to ONRR as set forth in § 3173.13.
  • (d) An operator must obtain a BLM-approved FMP number under §§ 3173.12 and 3173.13 of this part for each oil measurement facility where the measurement affects the calculation of the volume or quality of production on which royalty is owed (i.e., oil tank used for tank gauging, LACT system, CMS, or other approved metering device), except as provided in paragraph (h) of this section.

Citations to §3173.13(b)