US Codex
C.F.R.
Browse by date
Notes

§2802.11. How does the BLM designate right-of-way corridors and designated leasing areas? — Inbound Citations

43 C.F.R. § 2802.11

Cited by 3 regulations in release Current.

Citations to 43 U.S.C. § 2802.11 as a whole

Citations to §2802.11(b)

  • (b) When determining which lands may be suitable for communications sites, the BLM will consider all factors described in § 2802.11(b). Additional factors the BLM will consider include, but are not limited to, access to the site, existing infrastructure, signal coverage, available space, and industry demand.