US Codex
C.F.R.
Browse by date
Notes

§11.91. How does the authorized official seek recovery of the assessed damages from the potentially responsible party? — Inbound Citations

43 C.F.R. § 11.91

Cited by 2 regulations in release Current.

Citations to 43 U.S.C. § 11.91 as a whole

  • (3) The authorized official is not required to disclose the preliminary estimate before the conclusion of the assessment. At the conclusion of the assessment, the preliminary estimate of damages, along with its assumptions and methodology, shall be included in the Report of the Assessment as provided for in § 11.91 of this part.

Citations to §11.91(c)

  • (2) The Assessment Plan shall be of sufficient detail to serve as a means of evaluating whether the approach used for assessing the damage is likely to be cost-effective and meets the definition of reasonable cost, as those terms are used in this part. The Assessment Plan shall include descriptions of the natural resources and the geographical areas involved. The Assessment Plan shall also include a statement of the authority for asserting trusteeship, or co-trusteeship, for those natural resources considered within the Assessment Plan. The authorized official's statement of the authority for asserting trusteeship shall not have the force and effect of a rebuttable presumption under § 11.91(c) of this part. In addition, for type B assessments, the Assessment Plan shall include the sampling locations within those geographical areas, sample and survey design, numbers and types of samples to be collected, analyses to be performed, preliminary determination of the recovery period, and other such information required to perform the selected methodologies.