US Codex
C.F.R.
Browse by date
Notes

§10010.45. Time periods.

43 C.F.R. § 10010.45

(a)
The minimum review period for a draft EIS will be sixty (60) days from the date of transmittal to the Environmental Protection Agency.
(b)
The Commission will be responsible for consulting with the Environmental Protection Agency and/or CEQ about any proposed reductions in time periods or any extensions of time periods proposed by those agencies.
Notes, amendments, and revision history

Authority

Authority: 43 U.S.C. 620k (note).

Source

Source: 61 FR 16721, Apr. 17, 1996, unless otherwise noted.