Subpart KKKK — Standards of Performance for Stationary Combustion Turbines
Search Subpart KKKK full text →
- §60.4300 What is the purpose of this subpart?
- §60.4305 Does this subpart apply to my stationary combustion turbine?
- §60.4310 What types of operations are exempt from these standards of performance?
- §60.4315 What pollutants are regulated by this subpart?
- §60.4320 What emission limits must I meet for nitrogen oxides (NO X )?
- §60.4325 What emission limits must I meet for NO X if my turbine burns both natural gas and distillate oil (or some other combination of fuels)?
- §60.4330 What emission limits must I meet for sulfur dioxide (SO 2 )?
- §60.4331 What are the requirements for operating a stationary temporary combustion turbine?
- §60.4333 What are my general requirements for complying with this subpart?
- §60.4335 How do I demonstrate compliance for NO X if I use water or steam injection?
- §60.4340 How do I demonstrate continuous compliance for NO X if I do not use water or steam injection?
- §60.4345 What are the requirements for the continuous emission monitoring system equipment, if I choose to use this option?
- §60.4350 How do I use data from the continuous emission monitoring equipment to identify excess emissions?
- §60.4355 How do I establish and document a proper parameter monitoring plan?
- §60.4360 How do I determine the total sulfur content of the turbine's combustion fuel?
- §60.4365 How can I be exempted from monitoring the total sulfur content of the fuel?
- §60.4370 How often must I determine the sulfur content of the fuel?
- §60.4375 What reports must I submit?
- §60.4380 How are excess emissions and monitor downtime defined for NO X ?
- §60.4385 How are excess emissions and monitoring downtime defined for SO 2 ?
- §60.4390 What are my reporting requirements if I operate an emergency combustion turbine or a research and development turbine?
- §60.4395 When must I submit my reports?
- §60.4400 How do I conduct the initial and subsequent performance tests, regarding NO X ?
- §60.4405 How do I perform the initial performance test if I have chosen to install a NO X -diluent CEMS?
- §60.4410 How do I establish a valid parameter range if I have chosen to continuously monitor parameters?
- §60.4415 How do I conduct the initial and subsequent performance tests for sulfur?
- §60.4420 What definitions apply to this subpart?