  • (3) For each stack system in the fab, measure the emissions of each fluorinated GHG from the stack system by conducting an emission test. In addition, measure the fab-specific consumption of each fluorinated GHG by the tools that are vented to the stack systems tested. Measure emissions and consumption of each fluorinated GHG as specified in § 98.94(j). Develop fab-specific emission factors and calculate fab-level fluorinated GHG emissions using the procedures specified in paragraphs (i)(3)(i) through (viii) of this section. All emissions test data and procedures used in developing emission factors must be documented and recorded according to § 98.97.
    (i) You must measure the fab-specific fluorinated GHG consumption of the tools that are vented to the stack systems during the emission test as specified in § 98.94(j)(3). Calculate the consumption for each fluorinated GHG for the test period.
    (ii) You must calculate the emissions of each fluorinated GHG consumed as an input gas using equation I-17 to this section and each fluorinated GHG formed as a by-product gas using equation I-18 to this section and the procedures specified in paragraphs (i)(3)(ii)(A) through (E) of this section. If a stack system is comprised of multiple stacks, you must sum the emissions from each stack in the stack system when using equation I-17 or equation I-18 to this section.
    (A) If a fluorinated GHG is consumed during the sampling period, but emissions are not detected, use one-half of the field detection limit you determined for that fluorinated GHG according to § 98.94(j)(2) for the value of “Xism” in equation I-17 to this section.
    (B) If a fluorinated GHG is consumed during the sampling period and detected intermittently during the sampling period, use the detected concentration for the value of “Xism” in equation I-17 to this section when available and use one-half of the field detection limit you determined for that fluorinated GHG according to § 98.94(j)(2) for the value of “Xism” when the fluorinated GHG is not detected.
    (C) If an expected or possible by-product, as listed in table I-17 to this subpart, is detected intermittently during the sampling period, use the measured concentration for “Xksm” in equation I-18 to this section when available and use one-half of the field detection limit you determined for that fluorinated GHG according to § 98.94(j)(2) for the value of “Xksm” when the fluorinated GHG is not detected.
    (D) If a fluorinated GHG is not consumed during the sampling period and is an expected by-product gas as listed in table I-17 to this subpart and is not detected during the sampling period, use one-half of the field detection limit you determined for that fluorinated GHG according to § 98.94(j)(2) for the value of “Xksm” in equation I-18 to this section.
    (E) If a fluorinated GHG is not consumed during the sampling period and is a possible by-product gas as listed in table I-17 to this subpart, and is not detected during the sampling period, then assume zero emissions for that fluorinated GHG for the tested stack system.
    (iii) You must calculate a fab-specific emission factor for each fluorinated GHG input gas consumed (in kg of fluorinated GHG emitted per kg of input gas i consumed) in the tools that vent to stack systems, as applicable, using equations I-19A and I-19B to this section or equations I-19A and I-19C to this section. Use equation I-19A to this section to calculate the controlled emissions for each carbon-containing fluorinated GHG that would result during the sampling period if the utilization rate for the input gas were equal to 0.2 (Eimax,f). If SsEi,s (the total measured emissions of the fluorinated GHG across all stack systems, calculated based on the results of equation I-17 to this section) is less than or equal to Eimax,f calculated in equation I-19A to this section, use equation I-19B to this section to calculate the emission factor for that fluorinated GHG. If SsEi,s is larger than the Eimax,f calculated in equation I-19A to this section, use equation I-19C to this section to calculate the emission factor and treat the difference between the total measured emissions SsEi,s and the maximum expected controlled emissions Eimax,f as a by-product of the other input gases, using equation I-20 to this section. For all fluorinated GHGs that do not contain carbon, use equation I-19B to this section to calculate the emission factor for that fluorinated GHG.
    (iv) You must calculate a fab-specific emission factor for each fluorinated GHG formed as a by-product (in kg of fluorinated GHG per kg of total fluorinated GHG consumed) in the tools vented to stack systems, as applicable, using equation I-20 to this section. When calculating the by-product emission factor for an input gas for which SsEi,s equals or exceeds Eimax,f, exclude the consumption of that input gas from the term “S(Activityif).”
    (v) You must calculate annual fab-level emissions of each fluorinated GHG consumed using equation I-21 to this section.
    (vi) You must calculate annual fab-level emissions of each fluorinated GHG by-product formed using equation I-22 to this section.
    (vii) When using the stack testing method described in this paragraph (i), you must calculate abatement system uptime on a fab basis using equation I-23 to this section. When calculating abatement system uptime for use in equation I-19 and I-20 to this section, you must evaluate the variables “Tdpf” and “UTpf” for the sampling period instead of the reporting year.
    (viii) When using the stack testing option described in this paragraph (i) and when using more than one DRE for the same input gas i or by-product gas k, you must calculate the weighted-average fraction of each fluorinated input gas i and each fluorinated by-product gas k that has more than one DRE and that is destroyed or removed in abatement systems for each fab f, as applicable, by using equation I-24A to this section (for input gases) and equation I-24B to this section (for by-product gases) and table I-18 to this subpart. If default values are not available in table I-18 for a particular input gas, you must use a value of 10.
    (ix) When using the stack testing method described in this paragraph (i), you must calculate the fraction each fluorinated input gas i exhausted in fab f from tools with abatement systems and the fraction of each by-product gas k exhausted from tools with abatement systems, as applicable, by following either the procedure set forth in paragraph (i)(3)(ix)(A) of this section or the procedure set forth in paragraph (i)(3)(ix)(B) of this section.
    (A) Use equation I-24C to this section (for input gases) and equation I-24D to this section (for by-product gases) and table I-18 to this subpart. If default values are not available in table I-18 for a particular input gas, you must use a value of 10.
    (B) Use paragraph (e) of this section to apportion consumption of gas i either to tools with abatement systems and tools without abatement systems or to each process type or sub-type, as applicable. If you apportion consumption of gas i to each process type or sub-type, calculate the fractions of input gas i and by-product gas k formed from gas i that are exhausted from tools with abatement systems based on the numbers of tools with and without abatement systems within each process type or sub-type.

Citations to §98.97(a)

  • (4) As part of normal operations for each fab, the inventory of gas stored in containers at the beginning of the reporting year must be the same as the inventory of gas stored in containers at the end of the previous reporting year. You must maintain records documenting the year end and year beginning inventories under § 98.97(a).

Citations to §98.97(d)(1)

  • (d) For all abatement systems through which fluorinated GHGs or N2O flow at your facility, and for which you are reporting controlled emissions, the following in paragraphs (d)(1) to (9) of this section:
    (i) Documentation to certify that each abatement system or group of abatement systems is installed, maintained, and operated in accordance with the site maintenance plan for abatement systems that is specified in paragraph (d)(9) of this section.
    (ii) Documentation from the abatement system supplier describing the abatement system's designed purpose and emission control capabilities for fluorinated GHG and N2O for which the systems or group of systems is certified to abate, where available.
    (iii) If you use either default destruction or removal efficiency values or certified destruction or removal efficiency values that are lower than the default values in your emissions calculations under § 98.93(a), (b), and/or (i), certification that the abatement systems for which emissions are being reported were specifically designed for fluorinated GHG and N2O abatement, as required under § 98.94(f)(3), certification that the site maintenance plan includes the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance, and the certified destruction and removal efficiency values for all applicable abatement systems. For abatement systems purchased and installed on or after January 1, 2025, also include records of the method used to measure the destruction and removal efficiency values.
    (iv) Certification that you have included and accounted for all abatement systems and any respective downtime in your emissions calculations under § 98.93(i)(3), as required under § 98.94(f)(3).
    (3) Where either the default destruction or removal efficiency value or a certified destruction or removal efficiency value that is lower than the default is used, documentation from the abatement system supplier describing the equipment's designed purpose and emission control capabilities for fluorinated GHG and N2O.
    (4) Where properly measured site-specific destruction or removal efficiencies are used to report emissions, the information in paragraphs (d)(4)(i) though (vi) of this section:
    (i) Dated certification by the technician who made the measurement that the destruction or removal efficiency is calculated in accordance with methods in EPA 430-R-10-003 (incorporated by reference, see § 98.7) and, if applicable Appendix A of this subpart, or an alternative method approved by the Administrator as specified in § 98.94(k), complete documentation of the results of any initial and subsequent tests, the final report as specified in EPA 430-R-10-003 (incorporated by reference, see § 98.7) and, if applicable, the records and documentation specified in Appendix A of this subpart including the information required in paragraph (b)(7) of Appendix A of this subpart, or a final report as specified in an alternative method approved by the Administrator as specified in § 98.94(k).
    (ii) The average destruction or removal efficiency of the abatement systems operating during the reporting year for each process type and gas combination.
    (iii) A description of the calculation used to determine the average destruction or removal efficiency for each process type and gas combination, including all inputs to the calculation.
    (iv) The records of destruction or removal efficiency measurements for abatement systems for all tests that have been used to determine the site-specific destruction or removal efficiencies currently being used.
    (vi) The total number of systems for which destruction or removal efficiency was properly measured for each process type and gas combination for the reporting year.
    (5) In addition to the inventory specified in § 98.96(p), the information in paragraphs (d)(5)(i) through (iii) of this section:
    (i) The number of abatement systems of each manufacturer, and model numbers, and the manufacturer's certified fluorinated GHG and N2O destruction or removal efficiency, if any.
    (ii) Records of destruction or removal efficiency measurements over the in-use life of each abatement system.
    (iii) A description of the tool, with the process type or sub-type, for which the abatement system treats exhaust.
    (6) Records of all inputs and results of calculations made accounting for the uptime of abatement systems used during the reporting year, in accordance with equations I-15 or I-23 to § 98.93, as applicable. The inputs should include an indication of whether each value for destruction or removal efficiency is a default value, lower manufacturer-verified value, or a measured site-specific value.
    (7) Records of all inputs and results of calculations made to determine the average weighted fraction of each gas destroyed or removed in the abatement systems for each stack system using equations I-24A and I-24B to § 98.93, if applicable. The inputs should include an indication of whether each value for destruction or removal efficiency is a default value, lower manufacturer-verified value, or a measured site-specific value.
    (8) Records of all inputs and the results of the calculation of the facility-wide emission destruction or removal efficiency factor calculated according to Equations I-26, I-27, and I-28 of this subpart.
    (9) A site maintenance plan for abatement systems, which must be maintained on-site at the facility as part of the facility's GHG Monitoring Plan as described in § 98.3(g)(5), and be developed and implemented according to paragraphs (d)(9)(i) through (iii) of this section.
    (i) The site maintenance plan for abatement systems must be based on the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance if you use default or lower manufacturer-verified destruction and removal efficiency values in your emissions calculations under § 98.93(a), (b), and/or (i). If the manufacturer's recommendations and specifications for installation, operation, and maintenance are not available, you cannot use default destruction and removal efficiency values or lower manufacturer-verified value in your emissions calculations under § 98.93(a), (b), and/or (i). If you use an average of properly measured destruction or removal efficiencies determined in accordance with the procedures in § 98.94(f)(4)(i) through (vi), the site maintenance plan for abatement systems must be based on the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance, where available. If you deviate from the manufacturer's recommendations and specifications, you must include documentation that demonstrates how the deviations do not negatively affect the performance or destruction or removal efficiency of the abatement systems.
    (ii) The site maintenance plan for abatement systems must include a defined preventative maintenance process and checklist.
    (iii) The site maintenance plan for abatement systems must include a corrective action process that you must follow whenever an abatement system is found to be not operating properly.

Citations to §98.97(d)(2)

  • (d) For all abatement systems through which fluorinated GHGs or N2O flow at your facility, and for which you are reporting controlled emissions, the following in paragraphs (d)(1) to (9) of this section:
    (i) Documentation to certify that each abatement system or group of abatement systems is installed, maintained, and operated in accordance with the site maintenance plan for abatement systems that is specified in paragraph (d)(9) of this section.
    (ii) Documentation from the abatement system supplier describing the abatement system's designed purpose and emission control capabilities for fluorinated GHG and N2O for which the systems or group of systems is certified to abate, where available.
    (iii) If you use either default destruction or removal efficiency values or certified destruction or removal efficiency values that are lower than the default values in your emissions calculations under § 98.93(a), (b), and/or (i), certification that the abatement systems for which emissions are being reported were specifically designed for fluorinated GHG and N2O abatement, as required under § 98.94(f)(3), certification that the site maintenance plan includes the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance, and the certified destruction and removal efficiency values for all applicable abatement systems. For abatement systems purchased and installed on or after January 1, 2025, also include records of the method used to measure the destruction and removal efficiency values.
    (iv) Certification that you have included and accounted for all abatement systems and any respective downtime in your emissions calculations under § 98.93(i)(3), as required under § 98.94(f)(3).
    (3) Where either the default destruction or removal efficiency value or a certified destruction or removal efficiency value that is lower than the default is used, documentation from the abatement system supplier describing the equipment's designed purpose and emission control capabilities for fluorinated GHG and N2O.
    (4) Where properly measured site-specific destruction or removal efficiencies are used to report emissions, the information in paragraphs (d)(4)(i) though (vi) of this section:
    (i) Dated certification by the technician who made the measurement that the destruction or removal efficiency is calculated in accordance with methods in EPA 430-R-10-003 (incorporated by reference, see § 98.7) and, if applicable Appendix A of this subpart, or an alternative method approved by the Administrator as specified in § 98.94(k), complete documentation of the results of any initial and subsequent tests, the final report as specified in EPA 430-R-10-003 (incorporated by reference, see § 98.7) and, if applicable, the records and documentation specified in Appendix A of this subpart including the information required in paragraph (b)(7) of Appendix A of this subpart, or a final report as specified in an alternative method approved by the Administrator as specified in § 98.94(k).
    (ii) The average destruction or removal efficiency of the abatement systems operating during the reporting year for each process type and gas combination.
    (iii) A description of the calculation used to determine the average destruction or removal efficiency for each process type and gas combination, including all inputs to the calculation.
    (iv) The records of destruction or removal efficiency measurements for abatement systems for all tests that have been used to determine the site-specific destruction or removal efficiencies currently being used.
    (vi) The total number of systems for which destruction or removal efficiency was properly measured for each process type and gas combination for the reporting year.
    (5) In addition to the inventory specified in § 98.96(p), the information in paragraphs (d)(5)(i) through (iii) of this section:
    (i) The number of abatement systems of each manufacturer, and model numbers, and the manufacturer's certified fluorinated GHG and N2O destruction or removal efficiency, if any.
    (ii) Records of destruction or removal efficiency measurements over the in-use life of each abatement system.
    (iii) A description of the tool, with the process type or sub-type, for which the abatement system treats exhaust.
    (6) Records of all inputs and results of calculations made accounting for the uptime of abatement systems used during the reporting year, in accordance with equations I-15 or I-23 to § 98.93, as applicable. The inputs should include an indication of whether each value for destruction or removal efficiency is a default value, lower manufacturer-verified value, or a measured site-specific value.
    (7) Records of all inputs and results of calculations made to determine the average weighted fraction of each gas destroyed or removed in the abatement systems for each stack system using equations I-24A and I-24B to § 98.93, if applicable. The inputs should include an indication of whether each value for destruction or removal efficiency is a default value, lower manufacturer-verified value, or a measured site-specific value.
    (8) Records of all inputs and the results of the calculation of the facility-wide emission destruction or removal efficiency factor calculated according to Equations I-26, I-27, and I-28 of this subpart.
    (9) A site maintenance plan for abatement systems, which must be maintained on-site at the facility as part of the facility's GHG Monitoring Plan as described in § 98.3(g)(5), and be developed and implemented according to paragraphs (d)(9)(i) through (iii) of this section.
    (i) The site maintenance plan for abatement systems must be based on the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance if you use default or lower manufacturer-verified destruction and removal efficiency values in your emissions calculations under § 98.93(a), (b), and/or (i). If the manufacturer's recommendations and specifications for installation, operation, and maintenance are not available, you cannot use default destruction and removal efficiency values or lower manufacturer-verified value in your emissions calculations under § 98.93(a), (b), and/or (i). If you use an average of properly measured destruction or removal efficiencies determined in accordance with the procedures in § 98.94(f)(4)(i) through (vi), the site maintenance plan for abatement systems must be based on the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance, where available. If you deviate from the manufacturer's recommendations and specifications, you must include documentation that demonstrates how the deviations do not negatively affect the performance or destruction or removal efficiency of the abatement systems.
    (ii) The site maintenance plan for abatement systems must include a defined preventative maintenance process and checklist.
    (iii) The site maintenance plan for abatement systems must include a corrective action process that you must follow whenever an abatement system is found to be not operating properly.

Citations to §98.97(d)(3)

  • (d) For all abatement systems through which fluorinated GHGs or N2O flow at your facility, and for which you are reporting controlled emissions, the following in paragraphs (d)(1) to (9) of this section:
    (i) Documentation to certify that each abatement system or group of abatement systems is installed, maintained, and operated in accordance with the site maintenance plan for abatement systems that is specified in paragraph (d)(9) of this section.
    (ii) Documentation from the abatement system supplier describing the abatement system's designed purpose and emission control capabilities for fluorinated GHG and N2O for which the systems or group of systems is certified to abate, where available.
    (iii) If you use either default destruction or removal efficiency values or certified destruction or removal efficiency values that are lower than the default values in your emissions calculations under § 98.93(a), (b), and/or (i), certification that the abatement systems for which emissions are being reported were specifically designed for fluorinated GHG and N2O abatement, as required under § 98.94(f)(3), certification that the site maintenance plan includes the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance, and the certified destruction and removal efficiency values for all applicable abatement systems. For abatement systems purchased and installed on or after January 1, 2025, also include records of the method used to measure the destruction and removal efficiency values.
    (iv) Certification that you have included and accounted for all abatement systems and any respective downtime in your emissions calculations under § 98.93(i)(3), as required under § 98.94(f)(3).
    (3) Where either the default destruction or removal efficiency value or a certified destruction or removal efficiency value that is lower than the default is used, documentation from the abatement system supplier describing the equipment's designed purpose and emission control capabilities for fluorinated GHG and N2O.
    (4) Where properly measured site-specific destruction or removal efficiencies are used to report emissions, the information in paragraphs (d)(4)(i) though (vi) of this section:
    (i) Dated certification by the technician who made the measurement that the destruction or removal efficiency is calculated in accordance with methods in EPA 430-R-10-003 (incorporated by reference, see § 98.7) and, if applicable Appendix A of this subpart, or an alternative method approved by the Administrator as specified in § 98.94(k), complete documentation of the results of any initial and subsequent tests, the final report as specified in EPA 430-R-10-003 (incorporated by reference, see § 98.7) and, if applicable, the records and documentation specified in Appendix A of this subpart including the information required in paragraph (b)(7) of Appendix A of this subpart, or a final report as specified in an alternative method approved by the Administrator as specified in § 98.94(k).
    (ii) The average destruction or removal efficiency of the abatement systems operating during the reporting year for each process type and gas combination.
    (iii) A description of the calculation used to determine the average destruction or removal efficiency for each process type and gas combination, including all inputs to the calculation.
    (iv) The records of destruction or removal efficiency measurements for abatement systems for all tests that have been used to determine the site-specific destruction or removal efficiencies currently being used.
    (vi) The total number of systems for which destruction or removal efficiency was properly measured for each process type and gas combination for the reporting year.
    (5) In addition to the inventory specified in § 98.96(p), the information in paragraphs (d)(5)(i) through (iii) of this section:
    (i) The number of abatement systems of each manufacturer, and model numbers, and the manufacturer's certified fluorinated GHG and N2O destruction or removal efficiency, if any.
    (ii) Records of destruction or removal efficiency measurements over the in-use life of each abatement system.
    (iii) A description of the tool, with the process type or sub-type, for which the abatement system treats exhaust.
    (6) Records of all inputs and results of calculations made accounting for the uptime of abatement systems used during the reporting year, in accordance with equations I-15 or I-23 to § 98.93, as applicable. The inputs should include an indication of whether each value for destruction or removal efficiency is a default value, lower manufacturer-verified value, or a measured site-specific value.
    (7) Records of all inputs and results of calculations made to determine the average weighted fraction of each gas destroyed or removed in the abatement systems for each stack system using equations I-24A and I-24B to § 98.93, if applicable. The inputs should include an indication of whether each value for destruction or removal efficiency is a default value, lower manufacturer-verified value, or a measured site-specific value.
    (8) Records of all inputs and the results of the calculation of the facility-wide emission destruction or removal efficiency factor calculated according to Equations I-26, I-27, and I-28 of this subpart.
    (9) A site maintenance plan for abatement systems, which must be maintained on-site at the facility as part of the facility's GHG Monitoring Plan as described in § 98.3(g)(5), and be developed and implemented according to paragraphs (d)(9)(i) through (iii) of this section.
    (i) The site maintenance plan for abatement systems must be based on the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance if you use default or lower manufacturer-verified destruction and removal efficiency values in your emissions calculations under § 98.93(a), (b), and/or (i). If the manufacturer's recommendations and specifications for installation, operation, and maintenance are not available, you cannot use default destruction and removal efficiency values or lower manufacturer-verified value in your emissions calculations under § 98.93(a), (b), and/or (i). If you use an average of properly measured destruction or removal efficiencies determined in accordance with the procedures in § 98.94(f)(4)(i) through (vi), the site maintenance plan for abatement systems must be based on the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance, where available. If you deviate from the manufacturer's recommendations and specifications, you must include documentation that demonstrates how the deviations do not negatively affect the performance or destruction or removal efficiency of the abatement systems.
    (ii) The site maintenance plan for abatement systems must include a defined preventative maintenance process and checklist.
    (iii) The site maintenance plan for abatement systems must include a corrective action process that you must follow whenever an abatement system is found to be not operating properly.

Citations to §98.97(d)(4)

  • (d) For all abatement systems through which fluorinated GHGs or N2O flow at your facility, and for which you are reporting controlled emissions, the following in paragraphs (d)(1) to (9) of this section:
    (i) Documentation to certify that each abatement system or group of abatement systems is installed, maintained, and operated in accordance with the site maintenance plan for abatement systems that is specified in paragraph (d)(9) of this section.
    (ii) Documentation from the abatement system supplier describing the abatement system's designed purpose and emission control capabilities for fluorinated GHG and N2O for which the systems or group of systems is certified to abate, where available.
    (iii) If you use either default destruction or removal efficiency values or certified destruction or removal efficiency values that are lower than the default values in your emissions calculations under § 98.93(a), (b), and/or (i), certification that the abatement systems for which emissions are being reported were specifically designed for fluorinated GHG and N2O abatement, as required under § 98.94(f)(3), certification that the site maintenance plan includes the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance, and the certified destruction and removal efficiency values for all applicable abatement systems. For abatement systems purchased and installed on or after January 1, 2025, also include records of the method used to measure the destruction and removal efficiency values.
    (iv) Certification that you have included and accounted for all abatement systems and any respective downtime in your emissions calculations under § 98.93(i)(3), as required under § 98.94(f)(3).
    (3) Where either the default destruction or removal efficiency value or a certified destruction or removal efficiency value that is lower than the default is used, documentation from the abatement system supplier describing the equipment's designed purpose and emission control capabilities for fluorinated GHG and N2O.
    (4) Where properly measured site-specific destruction or removal efficiencies are used to report emissions, the information in paragraphs (d)(4)(i) though (vi) of this section:
    (i) Dated certification by the technician who made the measurement that the destruction or removal efficiency is calculated in accordance with methods in EPA 430-R-10-003 (incorporated by reference, see § 98.7) and, if applicable Appendix A of this subpart, or an alternative method approved by the Administrator as specified in § 98.94(k), complete documentation of the results of any initial and subsequent tests, the final report as specified in EPA 430-R-10-003 (incorporated by reference, see § 98.7) and, if applicable, the records and documentation specified in Appendix A of this subpart including the information required in paragraph (b)(7) of Appendix A of this subpart, or a final report as specified in an alternative method approved by the Administrator as specified in § 98.94(k).
    (ii) The average destruction or removal efficiency of the abatement systems operating during the reporting year for each process type and gas combination.
    (iii) A description of the calculation used to determine the average destruction or removal efficiency for each process type and gas combination, including all inputs to the calculation.
    (iv) The records of destruction or removal efficiency measurements for abatement systems for all tests that have been used to determine the site-specific destruction or removal efficiencies currently being used.
    (vi) The total number of systems for which destruction or removal efficiency was properly measured for each process type and gas combination for the reporting year.
    (5) In addition to the inventory specified in § 98.96(p), the information in paragraphs (d)(5)(i) through (iii) of this section:
    (i) The number of abatement systems of each manufacturer, and model numbers, and the manufacturer's certified fluorinated GHG and N2O destruction or removal efficiency, if any.
    (ii) Records of destruction or removal efficiency measurements over the in-use life of each abatement system.
    (iii) A description of the tool, with the process type or sub-type, for which the abatement system treats exhaust.
    (6) Records of all inputs and results of calculations made accounting for the uptime of abatement systems used during the reporting year, in accordance with equations I-15 or I-23 to § 98.93, as applicable. The inputs should include an indication of whether each value for destruction or removal efficiency is a default value, lower manufacturer-verified value, or a measured site-specific value.
    (7) Records of all inputs and results of calculations made to determine the average weighted fraction of each gas destroyed or removed in the abatement systems for each stack system using equations I-24A and I-24B to § 98.93, if applicable. The inputs should include an indication of whether each value for destruction or removal efficiency is a default value, lower manufacturer-verified value, or a measured site-specific value.
    (8) Records of all inputs and the results of the calculation of the facility-wide emission destruction or removal efficiency factor calculated according to Equations I-26, I-27, and I-28 of this subpart.
    (9) A site maintenance plan for abatement systems, which must be maintained on-site at the facility as part of the facility's GHG Monitoring Plan as described in § 98.3(g)(5), and be developed and implemented according to paragraphs (d)(9)(i) through (iii) of this section.
    (i) The site maintenance plan for abatement systems must be based on the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance if you use default or lower manufacturer-verified destruction and removal efficiency values in your emissions calculations under § 98.93(a), (b), and/or (i). If the manufacturer's recommendations and specifications for installation, operation, and maintenance are not available, you cannot use default destruction and removal efficiency values or lower manufacturer-verified value in your emissions calculations under § 98.93(a), (b), and/or (i). If you use an average of properly measured destruction or removal efficiencies determined in accordance with the procedures in § 98.94(f)(4)(i) through (vi), the site maintenance plan for abatement systems must be based on the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance, where available. If you deviate from the manufacturer's recommendations and specifications, you must include documentation that demonstrates how the deviations do not negatively affect the performance or destruction or removal efficiency of the abatement systems.
    (ii) The site maintenance plan for abatement systems must include a defined preventative maintenance process and checklist.
    (iii) The site maintenance plan for abatement systems must include a corrective action process that you must follow whenever an abatement system is found to be not operating properly.

Citations to §98.97(d)(5)

  • (d) For all abatement systems through which fluorinated GHGs or N2O flow at your facility, and for which you are reporting controlled emissions, the following in paragraphs (d)(1) to (9) of this section:
    (i) Documentation to certify that each abatement system or group of abatement systems is installed, maintained, and operated in accordance with the site maintenance plan for abatement systems that is specified in paragraph (d)(9) of this section.
    (ii) Documentation from the abatement system supplier describing the abatement system's designed purpose and emission control capabilities for fluorinated GHG and N2O for which the systems or group of systems is certified to abate, where available.
    (iii) If you use either default destruction or removal efficiency values or certified destruction or removal efficiency values that are lower than the default values in your emissions calculations under § 98.93(a), (b), and/or (i), certification that the abatement systems for which emissions are being reported were specifically designed for fluorinated GHG and N2O abatement, as required under § 98.94(f)(3), certification that the site maintenance plan includes the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance, and the certified destruction and removal efficiency values for all applicable abatement systems. For abatement systems purchased and installed on or after January 1, 2025, also include records of the method used to measure the destruction and removal efficiency values.
    (iv) Certification that you have included and accounted for all abatement systems and any respective downtime in your emissions calculations under § 98.93(i)(3), as required under § 98.94(f)(3).
    (3) Where either the default destruction or removal efficiency value or a certified destruction or removal efficiency value that is lower than the default is used, documentation from the abatement system supplier describing the equipment's designed purpose and emission control capabilities for fluorinated GHG and N2O.
    (4) Where properly measured site-specific destruction or removal efficiencies are used to report emissions, the information in paragraphs (d)(4)(i) though (vi) of this section:
    (i) Dated certification by the technician who made the measurement that the destruction or removal efficiency is calculated in accordance with methods in EPA 430-R-10-003 (incorporated by reference, see § 98.7) and, if applicable Appendix A of this subpart, or an alternative method approved by the Administrator as specified in § 98.94(k), complete documentation of the results of any initial and subsequent tests, the final report as specified in EPA 430-R-10-003 (incorporated by reference, see § 98.7) and, if applicable, the records and documentation specified in Appendix A of this subpart including the information required in paragraph (b)(7) of Appendix A of this subpart, or a final report as specified in an alternative method approved by the Administrator as specified in § 98.94(k).
    (ii) The average destruction or removal efficiency of the abatement systems operating during the reporting year for each process type and gas combination.
    (iii) A description of the calculation used to determine the average destruction or removal efficiency for each process type and gas combination, including all inputs to the calculation.
    (iv) The records of destruction or removal efficiency measurements for abatement systems for all tests that have been used to determine the site-specific destruction or removal efficiencies currently being used.
    (vi) The total number of systems for which destruction or removal efficiency was properly measured for each process type and gas combination for the reporting year.
    (5) In addition to the inventory specified in § 98.96(p), the information in paragraphs (d)(5)(i) through (iii) of this section:
    (i) The number of abatement systems of each manufacturer, and model numbers, and the manufacturer's certified fluorinated GHG and N2O destruction or removal efficiency, if any.
    (ii) Records of destruction or removal efficiency measurements over the in-use life of each abatement system.
    (iii) A description of the tool, with the process type or sub-type, for which the abatement system treats exhaust.
    (6) Records of all inputs and results of calculations made accounting for the uptime of abatement systems used during the reporting year, in accordance with equations I-15 or I-23 to § 98.93, as applicable. The inputs should include an indication of whether each value for destruction or removal efficiency is a default value, lower manufacturer-verified value, or a measured site-specific value.
    (7) Records of all inputs and results of calculations made to determine the average weighted fraction of each gas destroyed or removed in the abatement systems for each stack system using equations I-24A and I-24B to § 98.93, if applicable. The inputs should include an indication of whether each value for destruction or removal efficiency is a default value, lower manufacturer-verified value, or a measured site-specific value.
    (8) Records of all inputs and the results of the calculation of the facility-wide emission destruction or removal efficiency factor calculated according to Equations I-26, I-27, and I-28 of this subpart.
    (9) A site maintenance plan for abatement systems, which must be maintained on-site at the facility as part of the facility's GHG Monitoring Plan as described in § 98.3(g)(5), and be developed and implemented according to paragraphs (d)(9)(i) through (iii) of this section.
    (i) The site maintenance plan for abatement systems must be based on the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance if you use default or lower manufacturer-verified destruction and removal efficiency values in your emissions calculations under § 98.93(a), (b), and/or (i). If the manufacturer's recommendations and specifications for installation, operation, and maintenance are not available, you cannot use default destruction and removal efficiency values or lower manufacturer-verified value in your emissions calculations under § 98.93(a), (b), and/or (i). If you use an average of properly measured destruction or removal efficiencies determined in accordance with the procedures in § 98.94(f)(4)(i) through (vi), the site maintenance plan for abatement systems must be based on the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance, where available. If you deviate from the manufacturer's recommendations and specifications, you must include documentation that demonstrates how the deviations do not negatively affect the performance or destruction or removal efficiency of the abatement systems.
    (ii) The site maintenance plan for abatement systems must include a defined preventative maintenance process and checklist.
    (iii) The site maintenance plan for abatement systems must include a corrective action process that you must follow whenever an abatement system is found to be not operating properly.

Citations to §98.97(d)(5)(i)

  • (5) In addition to the inventory specified in § 98.96(p), the information in paragraphs (d)(5)(i) through (iii) of this section:
    (i) The number of abatement systems of each manufacturer, and model numbers, and the manufacturer's certified fluorinated GHG and N2O destruction or removal efficiency, if any.
    (ii) Records of destruction or removal efficiency measurements over the in-use life of each abatement system.
    (iii) A description of the tool, with the process type or sub-type, for which the abatement system treats exhaust.

Citations to §98.97(d)(5)(ii)

  • (5) In addition to the inventory specified in § 98.96(p), the information in paragraphs (d)(5)(i) through (iii) of this section:
    (i) The number of abatement systems of each manufacturer, and model numbers, and the manufacturer's certified fluorinated GHG and N2O destruction or removal efficiency, if any.
    (ii) Records of destruction or removal efficiency measurements over the in-use life of each abatement system.
    (iii) A description of the tool, with the process type or sub-type, for which the abatement system treats exhaust.

Citations to §98.97(d)(5)(iii)

  • (5) In addition to the inventory specified in § 98.96(p), the information in paragraphs (d)(5)(i) through (iii) of this section:
    (i) The number of abatement systems of each manufacturer, and model numbers, and the manufacturer's certified fluorinated GHG and N2O destruction or removal efficiency, if any.
    (ii) Records of destruction or removal efficiency measurements over the in-use life of each abatement system.
    (iii) A description of the tool, with the process type or sub-type, for which the abatement system treats exhaust.

Citations to §98.97(d)(6)

  • (d) For all abatement systems through which fluorinated GHGs or N2O flow at your facility, and for which you are reporting controlled emissions, the following in paragraphs (d)(1) to (9) of this section:
    (i) Documentation to certify that each abatement system or group of abatement systems is installed, maintained, and operated in accordance with the site maintenance plan for abatement systems that is specified in paragraph (d)(9) of this section.
    (ii) Documentation from the abatement system supplier describing the abatement system's designed purpose and emission control capabilities for fluorinated GHG and N2O for which the systems or group of systems is certified to abate, where available.
    (iii) If you use either default destruction or removal efficiency values or certified destruction or removal efficiency values that are lower than the default values in your emissions calculations under § 98.93(a), (b), and/or (i), certification that the abatement systems for which emissions are being reported were specifically designed for fluorinated GHG and N2O abatement, as required under § 98.94(f)(3), certification that the site maintenance plan includes the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance, and the certified destruction and removal efficiency values for all applicable abatement systems. For abatement systems purchased and installed on or after January 1, 2025, also include records of the method used to measure the destruction and removal efficiency values.
    (iv) Certification that you have included and accounted for all abatement systems and any respective downtime in your emissions calculations under § 98.93(i)(3), as required under § 98.94(f)(3).
    (3) Where either the default destruction or removal efficiency value or a certified destruction or removal efficiency value that is lower than the default is used, documentation from the abatement system supplier describing the equipment's designed purpose and emission control capabilities for fluorinated GHG and N2O.
    (4) Where properly measured site-specific destruction or removal efficiencies are used to report emissions, the information in paragraphs (d)(4)(i) though (vi) of this section:
    (i) Dated certification by the technician who made the measurement that the destruction or removal efficiency is calculated in accordance with methods in EPA 430-R-10-003 (incorporated by reference, see § 98.7) and, if applicable Appendix A of this subpart, or an alternative method approved by the Administrator as specified in § 98.94(k), complete documentation of the results of any initial and subsequent tests, the final report as specified in EPA 430-R-10-003 (incorporated by reference, see § 98.7) and, if applicable, the records and documentation specified in Appendix A of this subpart including the information required in paragraph (b)(7) of Appendix A of this subpart, or a final report as specified in an alternative method approved by the Administrator as specified in § 98.94(k).
    (ii) The average destruction or removal efficiency of the abatement systems operating during the reporting year for each process type and gas combination.
    (iii) A description of the calculation used to determine the average destruction or removal efficiency for each process type and gas combination, including all inputs to the calculation.
    (iv) The records of destruction or removal efficiency measurements for abatement systems for all tests that have been used to determine the site-specific destruction or removal efficiencies currently being used.
    (vi) The total number of systems for which destruction or removal efficiency was properly measured for each process type and gas combination for the reporting year.
    (5) In addition to the inventory specified in § 98.96(p), the information in paragraphs (d)(5)(i) through (iii) of this section:
    (i) The number of abatement systems of each manufacturer, and model numbers, and the manufacturer's certified fluorinated GHG and N2O destruction or removal efficiency, if any.
    (ii) Records of destruction or removal efficiency measurements over the in-use life of each abatement system.
    (iii) A description of the tool, with the process type or sub-type, for which the abatement system treats exhaust.
    (6) Records of all inputs and results of calculations made accounting for the uptime of abatement systems used during the reporting year, in accordance with equations I-15 or I-23 to § 98.93, as applicable. The inputs should include an indication of whether each value for destruction or removal efficiency is a default value, lower manufacturer-verified value, or a measured site-specific value.
    (7) Records of all inputs and results of calculations made to determine the average weighted fraction of each gas destroyed or removed in the abatement systems for each stack system using equations I-24A and I-24B to § 98.93, if applicable. The inputs should include an indication of whether each value for destruction or removal efficiency is a default value, lower manufacturer-verified value, or a measured site-specific value.
    (8) Records of all inputs and the results of the calculation of the facility-wide emission destruction or removal efficiency factor calculated according to Equations I-26, I-27, and I-28 of this subpart.
    (9) A site maintenance plan for abatement systems, which must be maintained on-site at the facility as part of the facility's GHG Monitoring Plan as described in § 98.3(g)(5), and be developed and implemented according to paragraphs (d)(9)(i) through (iii) of this section.
    (i) The site maintenance plan for abatement systems must be based on the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance if you use default or lower manufacturer-verified destruction and removal efficiency values in your emissions calculations under § 98.93(a), (b), and/or (i). If the manufacturer's recommendations and specifications for installation, operation, and maintenance are not available, you cannot use default destruction and removal efficiency values or lower manufacturer-verified value in your emissions calculations under § 98.93(a), (b), and/or (i). If you use an average of properly measured destruction or removal efficiencies determined in accordance with the procedures in § 98.94(f)(4)(i) through (vi), the site maintenance plan for abatement systems must be based on the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance, where available. If you deviate from the manufacturer's recommendations and specifications, you must include documentation that demonstrates how the deviations do not negatively affect the performance or destruction or removal efficiency of the abatement systems.
    (ii) The site maintenance plan for abatement systems must include a defined preventative maintenance process and checklist.
    (iii) The site maintenance plan for abatement systems must include a corrective action process that you must follow whenever an abatement system is found to be not operating properly.

Citations to §98.97(d)(7)

  • (d) For all abatement systems through which fluorinated GHGs or N2O flow at your facility, and for which you are reporting controlled emissions, the following in paragraphs (d)(1) to (9) of this section:
    (i) Documentation to certify that each abatement system or group of abatement systems is installed, maintained, and operated in accordance with the site maintenance plan for abatement systems that is specified in paragraph (d)(9) of this section.
    (ii) Documentation from the abatement system supplier describing the abatement system's designed purpose and emission control capabilities for fluorinated GHG and N2O for which the systems or group of systems is certified to abate, where available.
    (iii) If you use either default destruction or removal efficiency values or certified destruction or removal efficiency values that are lower than the default values in your emissions calculations under § 98.93(a), (b), and/or (i), certification that the abatement systems for which emissions are being reported were specifically designed for fluorinated GHG and N2O abatement, as required under § 98.94(f)(3), certification that the site maintenance plan includes the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance, and the certified destruction and removal efficiency values for all applicable abatement systems. For abatement systems purchased and installed on or after January 1, 2025, also include records of the method used to measure the destruction and removal efficiency values.
    (iv) Certification that you have included and accounted for all abatement systems and any respective downtime in your emissions calculations under § 98.93(i)(3), as required under § 98.94(f)(3).
    (3) Where either the default destruction or removal efficiency value or a certified destruction or removal efficiency value that is lower than the default is used, documentation from the abatement system supplier describing the equipment's designed purpose and emission control capabilities for fluorinated GHG and N2O.
    (4) Where properly measured site-specific destruction or removal efficiencies are used to report emissions, the information in paragraphs (d)(4)(i) though (vi) of this section:
    (i) Dated certification by the technician who made the measurement that the destruction or removal efficiency is calculated in accordance with methods in EPA 430-R-10-003 (incorporated by reference, see § 98.7) and, if applicable Appendix A of this subpart, or an alternative method approved by the Administrator as specified in § 98.94(k), complete documentation of the results of any initial and subsequent tests, the final report as specified in EPA 430-R-10-003 (incorporated by reference, see § 98.7) and, if applicable, the records and documentation specified in Appendix A of this subpart including the information required in paragraph (b)(7) of Appendix A of this subpart, or a final report as specified in an alternative method approved by the Administrator as specified in § 98.94(k).
    (ii) The average destruction or removal efficiency of the abatement systems operating during the reporting year for each process type and gas combination.
    (iii) A description of the calculation used to determine the average destruction or removal efficiency for each process type and gas combination, including all inputs to the calculation.
    (iv) The records of destruction or removal efficiency measurements for abatement systems for all tests that have been used to determine the site-specific destruction or removal efficiencies currently being used.
    (vi) The total number of systems for which destruction or removal efficiency was properly measured for each process type and gas combination for the reporting year.
    (5) In addition to the inventory specified in § 98.96(p), the information in paragraphs (d)(5)(i) through (iii) of this section:
    (i) The number of abatement systems of each manufacturer, and model numbers, and the manufacturer's certified fluorinated GHG and N2O destruction or removal efficiency, if any.
    (ii) Records of destruction or removal efficiency measurements over the in-use life of each abatement system.
    (iii) A description of the tool, with the process type or sub-type, for which the abatement system treats exhaust.
    (6) Records of all inputs and results of calculations made accounting for the uptime of abatement systems used during the reporting year, in accordance with equations I-15 or I-23 to § 98.93, as applicable. The inputs should include an indication of whether each value for destruction or removal efficiency is a default value, lower manufacturer-verified value, or a measured site-specific value.
    (7) Records of all inputs and results of calculations made to determine the average weighted fraction of each gas destroyed or removed in the abatement systems for each stack system using equations I-24A and I-24B to § 98.93, if applicable. The inputs should include an indication of whether each value for destruction or removal efficiency is a default value, lower manufacturer-verified value, or a measured site-specific value.
    (8) Records of all inputs and the results of the calculation of the facility-wide emission destruction or removal efficiency factor calculated according to Equations I-26, I-27, and I-28 of this subpart.
    (9) A site maintenance plan for abatement systems, which must be maintained on-site at the facility as part of the facility's GHG Monitoring Plan as described in § 98.3(g)(5), and be developed and implemented according to paragraphs (d)(9)(i) through (iii) of this section.
    (i) The site maintenance plan for abatement systems must be based on the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance if you use default or lower manufacturer-verified destruction and removal efficiency values in your emissions calculations under § 98.93(a), (b), and/or (i). If the manufacturer's recommendations and specifications for installation, operation, and maintenance are not available, you cannot use default destruction and removal efficiency values or lower manufacturer-verified value in your emissions calculations under § 98.93(a), (b), and/or (i). If you use an average of properly measured destruction or removal efficiencies determined in accordance with the procedures in § 98.94(f)(4)(i) through (vi), the site maintenance plan for abatement systems must be based on the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance, where available. If you deviate from the manufacturer's recommendations and specifications, you must include documentation that demonstrates how the deviations do not negatively affect the performance or destruction or removal efficiency of the abatement systems.
    (ii) The site maintenance plan for abatement systems must include a defined preventative maintenance process and checklist.
    (iii) The site maintenance plan for abatement systems must include a corrective action process that you must follow whenever an abatement system is found to be not operating properly.

Citations to §98.97(d)(8)

  • (d) For all abatement systems through which fluorinated GHGs or N2O flow at your facility, and for which you are reporting controlled emissions, the following in paragraphs (d)(1) to (9) of this section:
    (i) Documentation to certify that each abatement system or group of abatement systems is installed, maintained, and operated in accordance with the site maintenance plan for abatement systems that is specified in paragraph (d)(9) of this section.
    (ii) Documentation from the abatement system supplier describing the abatement system's designed purpose and emission control capabilities for fluorinated GHG and N2O for which the systems or group of systems is certified to abate, where available.
    (iii) If you use either default destruction or removal efficiency values or certified destruction or removal efficiency values that are lower than the default values in your emissions calculations under § 98.93(a), (b), and/or (i), certification that the abatement systems for which emissions are being reported were specifically designed for fluorinated GHG and N2O abatement, as required under § 98.94(f)(3), certification that the site maintenance plan includes the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance, and the certified destruction and removal efficiency values for all applicable abatement systems. For abatement systems purchased and installed on or after January 1, 2025, also include records of the method used to measure the destruction and removal efficiency values.
    (iv) Certification that you have included and accounted for all abatement systems and any respective downtime in your emissions calculations under § 98.93(i)(3), as required under § 98.94(f)(3).
    (3) Where either the default destruction or removal efficiency value or a certified destruction or removal efficiency value that is lower than the default is used, documentation from the abatement system supplier describing the equipment's designed purpose and emission control capabilities for fluorinated GHG and N2O.
    (4) Where properly measured site-specific destruction or removal efficiencies are used to report emissions, the information in paragraphs (d)(4)(i) though (vi) of this section:
    (i) Dated certification by the technician who made the measurement that the destruction or removal efficiency is calculated in accordance with methods in EPA 430-R-10-003 (incorporated by reference, see § 98.7) and, if applicable Appendix A of this subpart, or an alternative method approved by the Administrator as specified in § 98.94(k), complete documentation of the results of any initial and subsequent tests, the final report as specified in EPA 430-R-10-003 (incorporated by reference, see § 98.7) and, if applicable, the records and documentation specified in Appendix A of this subpart including the information required in paragraph (b)(7) of Appendix A of this subpart, or a final report as specified in an alternative method approved by the Administrator as specified in § 98.94(k).
    (ii) The average destruction or removal efficiency of the abatement systems operating during the reporting year for each process type and gas combination.
    (iii) A description of the calculation used to determine the average destruction or removal efficiency for each process type and gas combination, including all inputs to the calculation.
    (iv) The records of destruction or removal efficiency measurements for abatement systems for all tests that have been used to determine the site-specific destruction or removal efficiencies currently being used.
    (vi) The total number of systems for which destruction or removal efficiency was properly measured for each process type and gas combination for the reporting year.
    (5) In addition to the inventory specified in § 98.96(p), the information in paragraphs (d)(5)(i) through (iii) of this section:
    (i) The number of abatement systems of each manufacturer, and model numbers, and the manufacturer's certified fluorinated GHG and N2O destruction or removal efficiency, if any.
    (ii) Records of destruction or removal efficiency measurements over the in-use life of each abatement system.
    (iii) A description of the tool, with the process type or sub-type, for which the abatement system treats exhaust.
    (6) Records of all inputs and results of calculations made accounting for the uptime of abatement systems used during the reporting year, in accordance with equations I-15 or I-23 to § 98.93, as applicable. The inputs should include an indication of whether each value for destruction or removal efficiency is a default value, lower manufacturer-verified value, or a measured site-specific value.
    (7) Records of all inputs and results of calculations made to determine the average weighted fraction of each gas destroyed or removed in the abatement systems for each stack system using equations I-24A and I-24B to § 98.93, if applicable. The inputs should include an indication of whether each value for destruction or removal efficiency is a default value, lower manufacturer-verified value, or a measured site-specific value.
    (8) Records of all inputs and the results of the calculation of the facility-wide emission destruction or removal efficiency factor calculated according to Equations I-26, I-27, and I-28 of this subpart.
    (9) A site maintenance plan for abatement systems, which must be maintained on-site at the facility as part of the facility's GHG Monitoring Plan as described in § 98.3(g)(5), and be developed and implemented according to paragraphs (d)(9)(i) through (iii) of this section.
    (i) The site maintenance plan for abatement systems must be based on the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance if you use default or lower manufacturer-verified destruction and removal efficiency values in your emissions calculations under § 98.93(a), (b), and/or (i). If the manufacturer's recommendations and specifications for installation, operation, and maintenance are not available, you cannot use default destruction and removal efficiency values or lower manufacturer-verified value in your emissions calculations under § 98.93(a), (b), and/or (i). If you use an average of properly measured destruction or removal efficiencies determined in accordance with the procedures in § 98.94(f)(4)(i) through (vi), the site maintenance plan for abatement systems must be based on the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance, where available. If you deviate from the manufacturer's recommendations and specifications, you must include documentation that demonstrates how the deviations do not negatively affect the performance or destruction or removal efficiency of the abatement systems.
    (ii) The site maintenance plan for abatement systems must include a defined preventative maintenance process and checklist.
    (iii) The site maintenance plan for abatement systems must include a corrective action process that you must follow whenever an abatement system is found to be not operating properly.

Citations to §98.97(d)(9)

  • (1) You must certify and document that the abatement systems are properly installed, operated, and maintained according to the site maintenance plan for abatement systems that is developed and maintained in your records as specified in § 98.97(d)(9).
  • (1) Certification that all abatement systems at the facility have been installed, maintained, and operated in accordance with the site maintenance plan for abatement systems that is developed and maintained in your records as specified in § 98.97(d)(9).
  • (d) For all abatement systems through which fluorinated GHGs or N2O flow at your facility, and for which you are reporting controlled emissions, the following in paragraphs (d)(1) to (9) of this section:
    (i) Documentation to certify that each abatement system or group of abatement systems is installed, maintained, and operated in accordance with the site maintenance plan for abatement systems that is specified in paragraph (d)(9) of this section.
    (ii) Documentation from the abatement system supplier describing the abatement system's designed purpose and emission control capabilities for fluorinated GHG and N2O for which the systems or group of systems is certified to abate, where available.
    (iii) If you use either default destruction or removal efficiency values or certified destruction or removal efficiency values that are lower than the default values in your emissions calculations under § 98.93(a), (b), and/or (i), certification that the abatement systems for which emissions are being reported were specifically designed for fluorinated GHG and N2O abatement, as required under § 98.94(f)(3), certification that the site maintenance plan includes the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance, and the certified destruction and removal efficiency values for all applicable abatement systems. For abatement systems purchased and installed on or after January 1, 2025, also include records of the method used to measure the destruction and removal efficiency values.
    (iv) Certification that you have included and accounted for all abatement systems and any respective downtime in your emissions calculations under § 98.93(i)(3), as required under § 98.94(f)(3).
    (3) Where either the default destruction or removal efficiency value or a certified destruction or removal efficiency value that is lower than the default is used, documentation from the abatement system supplier describing the equipment's designed purpose and emission control capabilities for fluorinated GHG and N2O.
    (4) Where properly measured site-specific destruction or removal efficiencies are used to report emissions, the information in paragraphs (d)(4)(i) though (vi) of this section:
    (i) Dated certification by the technician who made the measurement that the destruction or removal efficiency is calculated in accordance with methods in EPA 430-R-10-003 (incorporated by reference, see § 98.7) and, if applicable Appendix A of this subpart, or an alternative method approved by the Administrator as specified in § 98.94(k), complete documentation of the results of any initial and subsequent tests, the final report as specified in EPA 430-R-10-003 (incorporated by reference, see § 98.7) and, if applicable, the records and documentation specified in Appendix A of this subpart including the information required in paragraph (b)(7) of Appendix A of this subpart, or a final report as specified in an alternative method approved by the Administrator as specified in § 98.94(k).
    (ii) The average destruction or removal efficiency of the abatement systems operating during the reporting year for each process type and gas combination.
    (iii) A description of the calculation used to determine the average destruction or removal efficiency for each process type and gas combination, including all inputs to the calculation.
    (iv) The records of destruction or removal efficiency measurements for abatement systems for all tests that have been used to determine the site-specific destruction or removal efficiencies currently being used.
    (vi) The total number of systems for which destruction or removal efficiency was properly measured for each process type and gas combination for the reporting year.
    (5) In addition to the inventory specified in § 98.96(p), the information in paragraphs (d)(5)(i) through (iii) of this section:
    (i) The number of abatement systems of each manufacturer, and model numbers, and the manufacturer's certified fluorinated GHG and N2O destruction or removal efficiency, if any.
    (ii) Records of destruction or removal efficiency measurements over the in-use life of each abatement system.
    (iii) A description of the tool, with the process type or sub-type, for which the abatement system treats exhaust.
    (6) Records of all inputs and results of calculations made accounting for the uptime of abatement systems used during the reporting year, in accordance with equations I-15 or I-23 to § 98.93, as applicable. The inputs should include an indication of whether each value for destruction or removal efficiency is a default value, lower manufacturer-verified value, or a measured site-specific value.
    (7) Records of all inputs and results of calculations made to determine the average weighted fraction of each gas destroyed or removed in the abatement systems for each stack system using equations I-24A and I-24B to § 98.93, if applicable. The inputs should include an indication of whether each value for destruction or removal efficiency is a default value, lower manufacturer-verified value, or a measured site-specific value.
    (8) Records of all inputs and the results of the calculation of the facility-wide emission destruction or removal efficiency factor calculated according to Equations I-26, I-27, and I-28 of this subpart.
    (9) A site maintenance plan for abatement systems, which must be maintained on-site at the facility as part of the facility's GHG Monitoring Plan as described in § 98.3(g)(5), and be developed and implemented according to paragraphs (d)(9)(i) through (iii) of this section.
    (i) The site maintenance plan for abatement systems must be based on the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance if you use default or lower manufacturer-verified destruction and removal efficiency values in your emissions calculations under § 98.93(a), (b), and/or (i). If the manufacturer's recommendations and specifications for installation, operation, and maintenance are not available, you cannot use default destruction and removal efficiency values or lower manufacturer-verified value in your emissions calculations under § 98.93(a), (b), and/or (i). If you use an average of properly measured destruction or removal efficiencies determined in accordance with the procedures in § 98.94(f)(4)(i) through (vi), the site maintenance plan for abatement systems must be based on the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance, where available. If you deviate from the manufacturer's recommendations and specifications, you must include documentation that demonstrates how the deviations do not negatively affect the performance or destruction or removal efficiency of the abatement systems.
    (ii) The site maintenance plan for abatement systems must include a defined preventative maintenance process and checklist.
    (iii) The site maintenance plan for abatement systems must include a corrective action process that you must follow whenever an abatement system is found to be not operating properly.
  • (4) The fluorinated GHG is not an expected or possible by-product identified in Table I-17 of this subpart.
    Maximum substrate starts means for the purposes of Equation I-5 of this subpart, the maximum quantity of substrates, expressed as surface area, that could be started each month during a reporting year based on the equipment installed in that facility and assuming that the installed equipment were fully utilized. Manufacturing equipment is considered installed when it is on the manufacturing floor and connected to required utilities.
    Modeled gas consumed means the quantity of gas used during wafer/substrate processing over some period based on a verified facility-specific engineering model used to apportion gas consumption.
    Nameplate capacity means the full and proper charge of chemical specified by the equipment manufacturer to achieve the equipment's specified performance. The nameplate capacity is typically indicated on the equipment's nameplate; it is not necessarily the actual charge, which may be influenced by leakage and other emissions.
    Operational mode means the time in which an abatement system is properly installed, maintained, and operated according to the site maintenance plan for abatement systems as required in § 98.94(f)(1) and defined in § 98.97(d)(9). This includes being properly operated within the range of parameters as specified in the site maintenance plan for abatement systems. For abatement systems purchased and installed on or after January 1, 2025, this includes being properly operated within the range of parameters specified in the DRE certification documentation. An abatement system is considered to not be in operational mode when it is not operated and maintained according to the site maintenance plan for abatement systems or, for abatement systems purchased and installed on or after January 1, 2025, not operated within the range of parameters as specified in the DRE certification documentation.
    Plasma etching is a process type that consists of any production process using fluorinated GHG reagents to selectively remove materials from a substrate during electronics manufacturing. The materials removed may include SiO2, SiOX-based or fully organic-based thin-film material, SiN, SiON, Si3N4, SiC, SiCO, SiCN, etc. (represented by the general chemical formula, SiwOXNyXz where w, x, y and z are zero or integers and X may be some other element such as carbon), substrate, or metal films (such as aluminum or tungsten).
    Process sub-type is a set of similar manufacturing steps, more closely related within a broad process type. For example, the chamber cleaning process type includes in-situ plasma chamber cleaning, remote plasma chamber cleaning, and in-situ thermal chamber cleaning sub-types.
    Process types are broad groups of manufacturing steps used at a facility associated with substrate (e.g., wafer) processing during device manufacture for which fluorinated GHG emissions and fluorinated GHG consumption is calculated and reported. The process types are Plasma etching/Wafer Cleaning and Chamber cleaning.
    Properly measured destruction or removal efficiency means destruction or removal efficiencies measured in accordance with EPA 430-R-10-003 (incorporated by reference, see § 98.7), and, if applicable, Appendix A to this subpart, or by an alternative method approved by the Administrator as specified in § 98.94(k).
    The Random Sampling Abatement System Testing Program (RSASTP) means the required frequency for measuring the destruction or removal efficiencies of abatement systems in order to apply properly measured destruction or removal efficiencies to report controlled emissions.
    Redundant abatement systems means a system that is specifically designed, installed and operated for the purpose of destroying fluorinated GHGs and N2O gases, or for which the destruction or removal efficiency for a fluorinated GHG or N2O has been properly measured according to the procedures under § 98.94(f)(4), and that is used as a backup to the main fluorinated GHGs and N2O abatement system during those times when the main system is not functioning or operating in accordance with design and operating specifications.
    Repeatable means that the variables used in the formulas for the facility's engineering model for gas apportioning factors are based on observable and measurable quantities that govern gas consumption rather than engineering judgment about those quantities or gas consumption.
    Representative operating levels means (for purposes of verification of the apportionment model or for determining the appropriate conditions for stack testing) operating the fab, in terms of substrate starts for the period of testing or monitoring, at no less than 50 percent of installed production capacity or no less than 70 percent of the average production rate for the reporting year, where production rate for the reporting year is represented in average monthly substrate starts. For the purposes of stack testing, the period for determining the representative operating level must be the period ending on the same date on which testing is concluded.
    Stack system means one or more stacks that are connected by a common header or manifold, through which a fluorinated GHG-containing gas stream originating from one or more fab processes is, or has the potential to be, released to the atmosphere. For purposes of this subpart, stack systems do not include emergency vents or bypass stacks through which emissions are not usually vented under typical operating conditions.
    Trigger point for change out means the residual weight or pressure of a gas container type that a facility uses as an indicator that operators need to change out that gas container with a full container. The trigger point is not the actual residual weight or pressure of the gas remaining in the cylinder that has been replaced.
    Unabated emissions means a gas stream containing fluorinated GHG or N2O that has exited the process, but which has not yet been introduced into an abatement system to reduce the mass of fluorinated GHG or N2O in the stream. If the emissions from the process are not routed to an abatement system, or are routed to an abatement device that is not in an operational mode, unabated emissions are those fluorinated GHG or N2O released to the atmosphere.
    Uptime means the ratio of the total time during which the abatement system is in an operational mode, to the total time during which production process tool(s) connected to that abatement system are normally in operation.
    Wafer cleaning is a process type that consists of any production process using fluorinated GHG reagents to clean wafers at any step during production.
    Wafer passes is a count of the number of times a wafer substrate is processed in a specific process sub-type, or type. The total number of wafer passes over a reporting year is the number of wafer passes per tool multiplied by the number of operational process tools in use during the reporting year.
    Wafer starts means the number of fresh wafers that are introduced into the fabrication sequence each month. It includes test wafers, which means wafers that are exposed to all of the conditions of process characterization, including but not limited to actual etch conditions or actual film deposition conditions.

Citations to §98.97(d)(9)(i)

  • (9) A site maintenance plan for abatement systems, which must be maintained on-site at the facility as part of the facility's GHG Monitoring Plan as described in § 98.3(g)(5), and be developed and implemented according to paragraphs (d)(9)(i) through (iii) of this section.
    (i) The site maintenance plan for abatement systems must be based on the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance if you use default or lower manufacturer-verified destruction and removal efficiency values in your emissions calculations under § 98.93(a), (b), and/or (i). If the manufacturer's recommendations and specifications for installation, operation, and maintenance are not available, you cannot use default destruction and removal efficiency values or lower manufacturer-verified value in your emissions calculations under § 98.93(a), (b), and/or (i). If you use an average of properly measured destruction or removal efficiencies determined in accordance with the procedures in § 98.94(f)(4)(i) through (vi), the site maintenance plan for abatement systems must be based on the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance, where available. If you deviate from the manufacturer's recommendations and specifications, you must include documentation that demonstrates how the deviations do not negatively affect the performance or destruction or removal efficiency of the abatement systems.
    (ii) The site maintenance plan for abatement systems must include a defined preventative maintenance process and checklist.
    (iii) The site maintenance plan for abatement systems must include a corrective action process that you must follow whenever an abatement system is found to be not operating properly.

Citations to §98.97(d)(9)(ii)

  • (9) A site maintenance plan for abatement systems, which must be maintained on-site at the facility as part of the facility's GHG Monitoring Plan as described in § 98.3(g)(5), and be developed and implemented according to paragraphs (d)(9)(i) through (iii) of this section.
    (i) The site maintenance plan for abatement systems must be based on the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance if you use default or lower manufacturer-verified destruction and removal efficiency values in your emissions calculations under § 98.93(a), (b), and/or (i). If the manufacturer's recommendations and specifications for installation, operation, and maintenance are not available, you cannot use default destruction and removal efficiency values or lower manufacturer-verified value in your emissions calculations under § 98.93(a), (b), and/or (i). If you use an average of properly measured destruction or removal efficiencies determined in accordance with the procedures in § 98.94(f)(4)(i) through (vi), the site maintenance plan for abatement systems must be based on the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance, where available. If you deviate from the manufacturer's recommendations and specifications, you must include documentation that demonstrates how the deviations do not negatively affect the performance or destruction or removal efficiency of the abatement systems.
    (ii) The site maintenance plan for abatement systems must include a defined preventative maintenance process and checklist.
    (iii) The site maintenance plan for abatement systems must include a corrective action process that you must follow whenever an abatement system is found to be not operating properly.

Citations to §98.97(d)(9)(iii)

  • (9) A site maintenance plan for abatement systems, which must be maintained on-site at the facility as part of the facility's GHG Monitoring Plan as described in § 98.3(g)(5), and be developed and implemented according to paragraphs (d)(9)(i) through (iii) of this section.
    (i) The site maintenance plan for abatement systems must be based on the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance if you use default or lower manufacturer-verified destruction and removal efficiency values in your emissions calculations under § 98.93(a), (b), and/or (i). If the manufacturer's recommendations and specifications for installation, operation, and maintenance are not available, you cannot use default destruction and removal efficiency values or lower manufacturer-verified value in your emissions calculations under § 98.93(a), (b), and/or (i). If you use an average of properly measured destruction or removal efficiencies determined in accordance with the procedures in § 98.94(f)(4)(i) through (vi), the site maintenance plan for abatement systems must be based on the abatement system manufacturer's recommendations and specifications for installation, operation, and maintenance, where available. If you deviate from the manufacturer's recommendations and specifications, you must include documentation that demonstrates how the deviations do not negatively affect the performance or destruction or removal efficiency of the abatement systems.
    (ii) The site maintenance plan for abatement systems must include a defined preventative maintenance process and checklist.
    (iii) The site maintenance plan for abatement systems must include a corrective action process that you must follow whenever an abatement system is found to be not operating properly.

Citations to §98.97(i)(4)

  • (iv) Although all applicable stack systems are not required to be tested simultaneously, you must certify that no significant changes in stack flow configuration occur between tests conducted for any particular fab in a reporting year. You must certify that no more than 10 percent of the total number of fluorinated GHG emitting process tools are connected or disconnected from a stack system during testing. You must also certify that no process tools that were in operation at the start of the test period have been moved to a different stack system during the test period (i.e., during or in between testing of individual stack systems) and that no point-of-use abatement systems have been permanently removed from service during the test period. You must document any changes in stack flow configuration in the emissions test data and report required to be kept as records under § 98.97(i)(4).

Citations to §98.97(r)

  • (3) Ensure that the inventory at the beginning of one reporting year is identical to the inventory at the end of the previous reporting year. You must maintain records documenting the year end and year beginning inventories under § 98.97(a) and (r).