§98.448. Geologic sequestration monitoring, reporting, and verification (MRV) plan. — Inbound Citations
40 C.F.R. § 98.448
Statutory Authority
Cited by 11 regulations in release Current.
Citations to 40 U.S.C. § 98.448 as a whole
-
(1) If you are a research and development project, you must submit the information in paragraph (d)(2) of this section to EPA by the time you would be otherwise required to submit an MRV plan under § 98.448. EPA will use this information to verify that the project is a research and development project.
-
(3) If an owner or operator demonstrates that monitoring employed under §§ 98.440 to 98.449 of this chapter (Clean Air Act, 42 U.S.C. 7401 et seq.) accomplishes the goals of paragraphs (h)(1) and (2) of this section, and meets the requirements pursuant to § 146.91(c)(5), a Director that requires surface air/soil gas monitoring must approve the use of monitoring employed under §§ 98.440 to 98.449 of this chapter. Compliance with §§ 98.440 to 98.449 of this chapter pursuant to this provision is considered a condition of the Class VI permit;
Citations to §98.448(a)(5)
-
(3) To aggregate production data, you must sum the mass of all of the CO2 separated at each gas-liquid separator in accordance with the procedure specified in Equation RR-9 of this section. You must assume that the total CO2 measured at the separator(s) represents a percentage of the total CO2 produced. In order to account for the percentage of CO2 produced that is estimated to remain with the produced oil or other fluid, you must multiply the quarterly mass of CO2 measured at the separator(s) by a percentage estimated using a methodology in your approved MRV plan. If fluids containing CO2 from injection wells covered under this source category are produced and not processed through a gas-liquid separator, the concentration of CO2 in the produced fluids must be measured at a flow meter located prior to reinjection or reuse using methods in § 98.444(f)(1). The considerations you intend to use to calculate CO2 from produced fluids for the mass balance equation must be described in your approved MRV plan in accordance with § 98.448(a)(5).
Citations to §98.448(a)(7)
-
(e) Report the date that you began collecting data for calculating total amount sequestered according to § 98.448(a)(7) of this subpart.
Citations to §98.448(c)
Citations to §98.448(d)
-
-
(ii) A description of any changes to the monitoring program that you concluded were not material changes warranting submission of a revised MRV plan under § 98.448(d).
Citations to §98.448(d)(1)
-
(d) You must revise and submit the MRV plan within 180 days to the Administrator for approval if any of the following in paragraphs (d)(1) through (d)(4) of this section applies. You must include the reason(s) for the revisions in your submittal.(1) A material change was made to monitoring and/or operational parameters that was not anticipated in the original MRV plan. Examples of material changes include but are not limited to: Large changes in the volume of CO2 injected; the construction of new injection wells not identified in the MRV plan; failures of the monitoring system including monitoring system sensitivity, performance, location, or baseline; changes to surface land use that affects baseline or operational conditions; observed plume location that differs significantly from the predicted plume area used for developing the MRV plan; a change in the maximum monitoring area or active monitoring area; or a change in monitoring technology that would result in coverage or detection capability different from the MRV plan.(3) If you are notified by EPA of substantive errors in your MRV plan or monitoring report.
Citations to §98.448(d)(2)
-
(d) You must revise and submit the MRV plan within 180 days to the Administrator for approval if any of the following in paragraphs (d)(1) through (d)(4) of this section applies. You must include the reason(s) for the revisions in your submittal.(1) A material change was made to monitoring and/or operational parameters that was not anticipated in the original MRV plan. Examples of material changes include but are not limited to: Large changes in the volume of CO2 injected; the construction of new injection wells not identified in the MRV plan; failures of the monitoring system including monitoring system sensitivity, performance, location, or baseline; changes to surface land use that affects baseline or operational conditions; observed plume location that differs significantly from the predicted plume area used for developing the MRV plan; a change in the maximum monitoring area or active monitoring area; or a change in monitoring technology that would result in coverage or detection capability different from the MRV plan.(3) If you are notified by EPA of substantive errors in your MRV plan or monitoring report.
Citations to §98.448(d)(3)
-
(d) You must revise and submit the MRV plan within 180 days to the Administrator for approval if any of the following in paragraphs (d)(1) through (d)(4) of this section applies. You must include the reason(s) for the revisions in your submittal.(1) A material change was made to monitoring and/or operational parameters that was not anticipated in the original MRV plan. Examples of material changes include but are not limited to: Large changes in the volume of CO2 injected; the construction of new injection wells not identified in the MRV plan; failures of the monitoring system including monitoring system sensitivity, performance, location, or baseline; changes to surface land use that affects baseline or operational conditions; observed plume location that differs significantly from the predicted plume area used for developing the MRV plan; a change in the maximum monitoring area or active monitoring area; or a change in monitoring technology that would result in coverage or detection capability different from the MRV plan.(3) If you are notified by EPA of substantive errors in your MRV plan or monitoring report.
Citations to §98.448(d)(4)
-
(d) You must revise and submit the MRV plan within 180 days to the Administrator for approval if any of the following in paragraphs (d)(1) through (d)(4) of this section applies. You must include the reason(s) for the revisions in your submittal.(1) A material change was made to monitoring and/or operational parameters that was not anticipated in the original MRV plan. Examples of material changes include but are not limited to: Large changes in the volume of CO2 injected; the construction of new injection wells not identified in the MRV plan; failures of the monitoring system including monitoring system sensitivity, performance, location, or baseline; changes to surface land use that affects baseline or operational conditions; observed plume location that differs significantly from the predicted plume area used for developing the MRV plan; a change in the maximum monitoring area or active monitoring area; or a change in monitoring technology that would result in coverage or detection capability different from the MRV plan.(3) If you are notified by EPA of substantive errors in your MRV plan or monitoring report.