US Codex
C.F.R.
Browse by date
Notes

§98.448. Geologic sequestration monitoring, reporting, and verification (MRV) plan. — Inbound Citations

40 C.F.R. § 98.448

Cited by 11 regulations in release Current.

Citations to 40 U.S.C. § 98.448 as a whole

Citations to §98.448(a)(5)

  • (3) To aggregate production data, you must sum the mass of all of the CO2 separated at each gas-liquid separator in accordance with the procedure specified in Equation RR-9 of this section. You must assume that the total CO2 measured at the separator(s) represents a percentage of the total CO2 produced. In order to account for the percentage of CO2 produced that is estimated to remain with the produced oil or other fluid, you must multiply the quarterly mass of CO2 measured at the separator(s) by a percentage estimated using a methodology in your approved MRV plan. If fluids containing CO2 from injection wells covered under this source category are produced and not processed through a gas-liquid separator, the concentration of CO2 in the produced fluids must be measured at a flow meter located prior to reinjection or reuse using methods in § 98.444(f)(1). The considerations you intend to use to calculate CO2 from produced fluids for the mass balance equation must be described in your approved MRV plan in accordance with § 98.448(a)(5).

Citations to §98.448(a)(7)

Citations to §98.448(c)

Citations to §98.448(d)

Citations to §98.448(d)(1)

  • (d) You must revise and submit the MRV plan within 180 days to the Administrator for approval if any of the following in paragraphs (d)(1) through (d)(4) of this section applies. You must include the reason(s) for the revisions in your submittal.
    (1) A material change was made to monitoring and/or operational parameters that was not anticipated in the original MRV plan. Examples of material changes include but are not limited to: Large changes in the volume of CO2 injected; the construction of new injection wells not identified in the MRV plan; failures of the monitoring system including monitoring system sensitivity, performance, location, or baseline; changes to surface land use that affects baseline or operational conditions; observed plume location that differs significantly from the predicted plume area used for developing the MRV plan; a change in the maximum monitoring area or active monitoring area; or a change in monitoring technology that would result in coverage or detection capability different from the MRV plan.
    (3) If you are notified by EPA of substantive errors in your MRV plan or monitoring report.

Citations to §98.448(d)(2)

  • (d) You must revise and submit the MRV plan within 180 days to the Administrator for approval if any of the following in paragraphs (d)(1) through (d)(4) of this section applies. You must include the reason(s) for the revisions in your submittal.
    (1) A material change was made to monitoring and/or operational parameters that was not anticipated in the original MRV plan. Examples of material changes include but are not limited to: Large changes in the volume of CO2 injected; the construction of new injection wells not identified in the MRV plan; failures of the monitoring system including monitoring system sensitivity, performance, location, or baseline; changes to surface land use that affects baseline or operational conditions; observed plume location that differs significantly from the predicted plume area used for developing the MRV plan; a change in the maximum monitoring area or active monitoring area; or a change in monitoring technology that would result in coverage or detection capability different from the MRV plan.
    (3) If you are notified by EPA of substantive errors in your MRV plan or monitoring report.

Citations to §98.448(d)(3)

  • (d) You must revise and submit the MRV plan within 180 days to the Administrator for approval if any of the following in paragraphs (d)(1) through (d)(4) of this section applies. You must include the reason(s) for the revisions in your submittal.
    (1) A material change was made to monitoring and/or operational parameters that was not anticipated in the original MRV plan. Examples of material changes include but are not limited to: Large changes in the volume of CO2 injected; the construction of new injection wells not identified in the MRV plan; failures of the monitoring system including monitoring system sensitivity, performance, location, or baseline; changes to surface land use that affects baseline or operational conditions; observed plume location that differs significantly from the predicted plume area used for developing the MRV plan; a change in the maximum monitoring area or active monitoring area; or a change in monitoring technology that would result in coverage or detection capability different from the MRV plan.
    (3) If you are notified by EPA of substantive errors in your MRV plan or monitoring report.

Citations to §98.448(d)(4)

  • (d) You must revise and submit the MRV plan within 180 days to the Administrator for approval if any of the following in paragraphs (d)(1) through (d)(4) of this section applies. You must include the reason(s) for the revisions in your submittal.
    (1) A material change was made to monitoring and/or operational parameters that was not anticipated in the original MRV plan. Examples of material changes include but are not limited to: Large changes in the volume of CO2 injected; the construction of new injection wells not identified in the MRV plan; failures of the monitoring system including monitoring system sensitivity, performance, location, or baseline; changes to surface land use that affects baseline or operational conditions; observed plume location that differs significantly from the predicted plume area used for developing the MRV plan; a change in the maximum monitoring area or active monitoring area; or a change in monitoring technology that would result in coverage or detection capability different from the MRV plan.
    (3) If you are notified by EPA of substantive errors in your MRV plan or monitoring report.