§98.233. Calculating GHG emissions.
40 C.F.R. § 98.233
(2) Confirm that the device is correctly characterized as a continuous high bleed pneumatic device according to the provisions in paragraph (a)(7) of this section. If the device type was mischaracterized, recharacterize the device type and use the appropriate methods in paragraph (a)(2)(v)(B) or (C) of this section, as applicable.
(3) Upon confirmation of the items in paragraphs (a)(2)(v)(A)(1) and (2) of this section, remeasure the device vent using a different measurement method specified in § 98.234(b) through (d) or longer monitoring duration until there is a measurable flow from the device and calculate the natural gas emissions from the device according to paragraph (a)(2)(iv) of this section.
(2) Determine natural gas bleed rate (in standard cubic feet per hour) at the supply pressure used for the pneumatic device based on the manufacturer's steady state natural gas bleed rate reported for the device. If the steady state bleed rate is reported in terms of air consumption, multiply the air consumption rate by 1.29 to calculate the steady state natural gas bleed rate. If a steady state bleed rate is not reported, follow the requirements in paragraph (a)(2)(v)(B)(4) of this section.
(3) Calculate the volume of natural gas emitted from the natural gas pneumatic device vent as the product of the natural gas steady state bleed rate determined in paragraph (a)(2)(v)(B)(2) of this section and number of hours the pneumatic device was in service (i.e., supplied with natural gas) in the calendar year.
(4) If a steady state bleed rate is not reported, reassess whether the device is correctly characterized as a continuous low bleed pneumatic device according to the provisions in paragraph (a)(7) of this section. If the device is confirmed to be a continuous low bleed pneumatic device, you must remeasure the device vent using a different measurement method specified in § 98.234(b) through (d) or longer monitoring duration until there is a measurable flow from the device and calculate natural gas emissions from the device according to paragraph (a)(2)(iv) of this section. If the device type was mischaracterized, recharacterize the device type and use the appropriate methods in paragraph (a)(2)(v)(A) or (C) of this section, as applicable.
(2) Calculate the volume of the controller, tubing and actuator (in actual cubic feet) based on the device and tubing size.
(3) Sum the volumes in paragraph (a)(2)(v)(C)(2) of this section and convert the volume to standard cubic feet following the methods specified in paragraph (t)(1) of this section based on the natural gas supply pressure.
(4) Estimate the number of actuations during the year based on company records, if available, or best engineering estimates. For isolation valve actuators, you may multiply the number of valve closures during the year by 2 (one actuation to close the valve; one actuation to open the valve).
(5) Calculate the volume of natural gas emitted from the natural gas pneumatic device vent as the product of the per actuation volume in standard cubic feet determined in paragraph (a)(2)(v)(C)(3) of this section, the number of actuations during the year as determined in paragraph (a)(2)(v)(C)(4) of this section, and the relay correction factor. Use 1 for the relay correction factor if there is no relay; use 3 for the relay correction factor if there is a relay.
(1) You must identify the devices for which extended actuations are considered normal operations. For each device identified, you must determine the typical actuation time and maintain documentation and rationale for the extended actuation duration value.
(2) You must clearly and permanently tag the device vent for each natural gas pneumatic device that has an extended actuation duration. The tag must include the device ID and the normal duration period (in seconds) as determined and documented for the device as specified in paragraph (a)(3)(ii)(C)(1) of this section.
(1) Determine flow of emission streams routed to flares from acid gas removal units using Calculation Method 3 or Calculation Method 4 as specified in paragraph (d)(3) or (4) of this section. Use the method specified in paragraph (n)(3)(ii)(B)(8) of this section to determine the volume of non-GHG constituents in a stream from an acid gas removal unit or nitrogen removal unit and add to the volume of GHGs to determine the total volume to the flare.
(2) Determine flow of emission streams routed to flares from dehydrators using an applicable method specified in paragraph (e) of this section. When using Calculation Method 2 to determine volume of GHGs from small glycol dehydrators, also use the method specified in paragraph (n)(3)(ii)(B)(8) of this section to determine the volume of non-GHG constituents in the stream to the flare and add to the volume of GHGs to determine the total volume to the flare.
(3) Determine flow of emission streams routed to flares from completions and workovers with hydraulic fracturing using a method specified in paragraph (g) of this section.
(4) Determine flow of emission streams routed to flares from completions and workovers without hydraulic fracturing using a method specified in paragraph (h) of this section.
(5) Determine flow of emission streams routed to flares from hydrocarbon liquids and produced water storage tanks using a method specified in paragraph (j) of this section. When using Calculation Method 2 or Calculation Method 3 to calculate the volume of GHGs, use the method specified in paragraph (n)(3)(ii)(B)(8) of this section to determine the volume of non-GHG constituents in the stream to the flare and add to the volume of GHGs to determine the total volume to the flare.
(6) Determine flow of emission streams routed to flares from well testing using an applicable method specified in paragraph (l) of this section.
(7) Determine flow of associated gas emission streams routed to flares using the method specified in paragraph (m)(2) of this section.
(8) Use engineering calculations based on process knowledge, company records, and best available data to calculate flow for sources other than those described in paragraphs (n)(3)(ii)(B)(1) through (7) of this section and to calculate volume of non-GHG constituents in streams for which the method used in paragraphs (n)(3)(ii)(B)(1), (2), and (5) of this section calculates only the GHG flow.
(1) Determine the total annual average GHG composition of streams from acid gas removal units based on either process simulation as specified in paragraph (d)(4) of this section or quarterly sampling in accordance with paragraphs (d)(6) and (10) of this section, and determine the composition of ethane, propane, butane, and pentanes plus as specified in paragraph (n)(4)(iii)(B)(5) of this section.
(2) Determine the total annual average composition of streams from glycol dehydrators using Calculation Method 1 as specified in paragraph (e)(1) of this section or determine the annual average GHG composition as specified in paragraph (u)(2) of this section for the applicable industry segment. Determine annual average GHG composition of streams from desiccant dehydrators as specified in paragraph (u)(2) of this section. If you determine GHG composition in accordance with paragraph (u)(2) of this section, also determine the composition of ethane, propane, butane, and pentanes plus as specified in paragraph (n)(4)(iii)(B)(5) of this section.
(3) Determine the total annual average composition of streams from hydrocarbon liquids and produced water storage tanks using Calculation Method 1 in accordance with paragraph (j)(1) of this section or determine the annual average GHG composition as specified in paragraph (u)(2)(i) of this section. If you determine annual average GHG composition as specified in paragraph (u)(2)(i) of this section, then also determine the composition of ethane, propane, butane, and pentanes plus as specified in paragraph (n)(4)(iii)(B)(5) of this section.
(4) For onshore natural gas processing facilities, determine GHG mole fractions for all emission sources downstream of the de-methanizer overhead or dew point control based on samples of facility-specific residue gas to transmission pipeline systems taken at least once per year according to methods set forth in § 98.234(b), and determine GHG mole fractions for all emission sources upstream of the de-methanizer or dew point control based on samples of feed natural gas taken at least once per year according to methods set forth in § 98.234(b). For onshore natural gas processing plants that solely fractionate a liquid stream, use the GHG mole fraction in feed natural gas liquid streams as determined from samples taken at least once per year. If multiple samples of a stream are taken in a year, use the arithmetic average GHG composition.
(5) Except as specified in paragraph (n)(4)(iii)(B)(6) of this section, for streams from any source type other than those identified in paragraphs (n)(4)(iii)(B)(1) through (4) of this section, and for purge gas, sweep gas, and auxiliary fuel, determine the annual average GHG composition as specified in paragraph (u)(2) of this section for the applicable industry segment, and determine the composition of ethane, propane, butane, and pentanes plus as specified in paragraph (n)(4)(iii)(B)(7) of this section.
(6) When the stream going to the flare is a hydrocarbon product stream, such as methane, ethane, propane, butane, pentanes-plus, or mixed light hydrocarbons, you may use a representative composition from the source for the stream determined by engineering calculation based on process knowledge and best available data.
(7) When only the GHG composition is determined in accordance with paragraph (u)(2) of this section, determine the annual average composition of ethane, propane, butane, and pentanes plus in the stream using a representative composition based on process knowledge and best available data.
Notes, amendments, and revision history
Amendments
[75 FR 74488, Nov. 30, 2010, as amended at 76 FR 80575, Dec. 23, 2011; 77 FR 51490, Aug. 24, 2012; 78 FR 71960, Nov. 29, 2013; 79 FR 70408, Nov. 25, 2014; 80 FR 64284, Oct. 22, 2015; 81 FR 86511, Nov. 30, 2016; 89 FR 42223, 42237, May 14, 2024; 89 FR 71842, 71847, Sept. 4, 2024]
Source
Source: 75 FR 74488, Nov. 30, 2010, unless otherwise noted.
Authority
Authority: 42 U.S.C. 7401-7671q.
Source
Source: 74 FR 56374, Oct. 30, 2009, unless otherwise noted.
Amendments
[75 FR 74488, Nov. 30, 2010, as amended at 76 FR 80575, Dec. 23, 2011; 77 FR 51490, Aug. 24, 2012; 78 FR 71960, Nov. 29, 2013; 79 FR 70408, Nov. 25, 2014; 80 FR 64284, Oct. 22, 2015; 81 FR 86511, Nov. 30, 2016; 89 FR 42223, 42237, May 14, 2024; 89 FR 71842, 71847, Sept. 4, 2024]