§98.224. Monitoring and QA/QC requirements. — Inbound Citations
40 C.F.R. § 98.224
Statutory Authority
Cited by 19 regulations in release Current.
Citations to §98.224(a)
-
(b) For missing values related to the performance test, including emission factors, production rate, and N2O concentration, you must conduct a new performance test according to the procedures in § 98.224 (a) through (d).
Citations to §98.224(a)(1)
-
(a) You must conduct a new performance test according to a test plan as specified in paragraphs (a)(1) through (3) of this section.(1) The test should be conducted at a point during the campaign which is representative of the average emissions rate from the nitric acid campaigns. Facilities must document the methods used to determine the representative point of the campaign when the performance test is conducted.(2) Conduct the performance test when your nitric acid production process is changed, specifically when abatement equipment is installed.(3) If you requested Administrator approval for an alternative method of determining N2O emissions under § 98.223(a)(2), you must conduct the performance test if your request has not been approved by the Administrator within 150 days of the end of the reporting year in which it was submitted.
Citations to §98.224(a)(2)
-
(a) You must conduct a new performance test according to a test plan as specified in paragraphs (a)(1) through (3) of this section.(1) The test should be conducted at a point during the campaign which is representative of the average emissions rate from the nitric acid campaigns. Facilities must document the methods used to determine the representative point of the campaign when the performance test is conducted.(2) Conduct the performance test when your nitric acid production process is changed, specifically when abatement equipment is installed.(3) If you requested Administrator approval for an alternative method of determining N2O emissions under § 98.223(a)(2), you must conduct the performance test if your request has not been approved by the Administrator within 150 days of the end of the reporting year in which it was submitted.
Citations to §98.224(a)(3)
-
(a) You must conduct a new performance test according to a test plan as specified in paragraphs (a)(1) through (3) of this section.(1) The test should be conducted at a point during the campaign which is representative of the average emissions rate from the nitric acid campaigns. Facilities must document the methods used to determine the representative point of the campaign when the performance test is conducted.(2) Conduct the performance test when your nitric acid production process is changed, specifically when abatement equipment is installed.(3) If you requested Administrator approval for an alternative method of determining N2O emissions under § 98.223(a)(2), you must conduct the performance test if your request has not been approved by the Administrator within 150 days of the end of the reporting year in which it was submitted.
Citations to §98.224(b)
-
(1) You must conduct the performance test at the absorber tail gas vent, referred to as the test point, for each nitric acid train according to § 98.224(b) through (f). If multiple nitric acid trains exhaust to a common abatement technology and/or emission point, you must sample each process in the ducts before the emissions are combined, sample each process when only one process is operating, or sample the combined emissions when multiple processes are operating and base the site-specific emission factor on the combined production rate of the multiple nitric acid trains.
-
(b) For missing values related to the performance test, including emission factors, production rate, and N2O concentration, you must conduct a new performance test according to the procedures in § 98.224 (a) through (d).
-
(35) ASTM D6348-03, Standard Test Method for Determination of Gaseous Compounds by Extractive Direct Interface Fourier Transform Infrared (FTIR) Spectroscopy; IBR approved for § 98.54(b); table I-9 to subpart I of this part; §§ 98.224(b); 98.414(n).
Citations to §98.224(b)(1)
-
(b) You must measure the N2O concentration during the performance test using one of the methods in paragraphs (b)(1) through (b)(3) of this section.(1) EPA Method 320 at 40 CFR part 63, appendix A, Measurement of Vapor Phase Organic and Inorganic Emissions by Extractive Fourier Transform Infrared (FTIR) Spectroscopy.(2) ASTM D6348-03 Standard Test Method for Determination of Gaseous Compounds by Extractive Direct Interface Fourier Transform Infrared (FTIR) Spectroscopy (incorporated by reference in § 98.7).
Citations to §98.224(b)(2)
-
(b) You must measure the N2O concentration during the performance test using one of the methods in paragraphs (b)(1) through (b)(3) of this section.(1) EPA Method 320 at 40 CFR part 63, appendix A, Measurement of Vapor Phase Organic and Inorganic Emissions by Extractive Fourier Transform Infrared (FTIR) Spectroscopy.(2) ASTM D6348-03 Standard Test Method for Determination of Gaseous Compounds by Extractive Direct Interface Fourier Transform Infrared (FTIR) Spectroscopy (incorporated by reference in § 98.7).
Citations to §98.224(b)(3)
-
(b) You must measure the N2O concentration during the performance test using one of the methods in paragraphs (b)(1) through (b)(3) of this section.(1) EPA Method 320 at 40 CFR part 63, appendix A, Measurement of Vapor Phase Organic and Inorganic Emissions by Extractive Fourier Transform Infrared (FTIR) Spectroscopy.(2) ASTM D6348-03 Standard Test Method for Determination of Gaseous Compounds by Extractive Direct Interface Fourier Transform Infrared (FTIR) Spectroscopy (incorporated by reference in § 98.7).
Citations to §98.224(c)
-
(1) You must conduct the performance test at the absorber tail gas vent, referred to as the test point, for each nitric acid train according to § 98.224(b) through (f). If multiple nitric acid trains exhaust to a common abatement technology and/or emission point, you must sample each process in the ducts before the emissions are combined, sample each process when only one process is operating, or sample the combined emissions when multiple processes are operating and base the site-specific emission factor on the combined production rate of the multiple nitric acid trains.
-
(b) For missing values related to the performance test, including emission factors, production rate, and N2O concentration, you must conduct a new performance test according to the procedures in § 98.224 (a) through (d).
Citations to §98.224(d)
-
(1) You must conduct the performance test at the absorber tail gas vent, referred to as the test point, for each nitric acid train according to § 98.224(b) through (f). If multiple nitric acid trains exhaust to a common abatement technology and/or emission point, you must sample each process in the ducts before the emissions are combined, sample each process when only one process is operating, or sample the combined emissions when multiple processes are operating and base the site-specific emission factor on the combined production rate of the multiple nitric acid trains.
-
(b) For missing values related to the performance test, including emission factors, production rate, and N2O concentration, you must conduct a new performance test according to the procedures in § 98.224 (a) through (d).
Citations to §98.224(d)(1)
-
(d) You must determine the volumetric flow rate during the performance test in conjunction with the applicable EPA methods in 40 CFR part 60, appendices A-1 through A-4. Conduct three emissions test runs of 1 hour each. All QA/QC procedures specified in the reference test methods and any associated performance specifications apply. For each test, the facility must prepare an emission factor determination report that must include the items in paragraphs (d)(1) through (d)(3) of this section.
Citations to §98.224(d)(2)
-
(d) You must determine the volumetric flow rate during the performance test in conjunction with the applicable EPA methods in 40 CFR part 60, appendices A-1 through A-4. Conduct three emissions test runs of 1 hour each. All QA/QC procedures specified in the reference test methods and any associated performance specifications apply. For each test, the facility must prepare an emission factor determination report that must include the items in paragraphs (d)(1) through (d)(3) of this section.
Citations to §98.224(d)(3)
-
(d) You must determine the volumetric flow rate during the performance test in conjunction with the applicable EPA methods in 40 CFR part 60, appendices A-1 through A-4. Conduct three emissions test runs of 1 hour each. All QA/QC procedures specified in the reference test methods and any associated performance specifications apply. For each test, the facility must prepare an emission factor determination report that must include the items in paragraphs (d)(1) through (d)(3) of this section.
Citations to §98.224(e)
-
(1) You must conduct the performance test at the absorber tail gas vent, referred to as the test point, for each nitric acid train according to § 98.224(b) through (f). If multiple nitric acid trains exhaust to a common abatement technology and/or emission point, you must sample each process in the ducts before the emissions are combined, sample each process when only one process is operating, or sample the combined emissions when multiple processes are operating and base the site-specific emission factor on the combined production rate of the multiple nitric acid trains.
Citations to §98.224(f)
-
(1) You must conduct the performance test at the absorber tail gas vent, referred to as the test point, for each nitric acid train according to § 98.224(b) through (f). If multiple nitric acid trains exhaust to a common abatement technology and/or emission point, you must sample each process in the ducts before the emissions are combined, sample each process when only one process is operating, or sample the combined emissions when multiple processes are operating and base the site-specific emission factor on the combined production rate of the multiple nitric acid trains.