§84.106. Leak repair. — Inbound Citations
40 C.F.R. § 84.106
Cited by 18 regulations in release Current.
Citations to 40 U.S.C. § 84.106 as a whole
-
(1) Calculate the leak rate within 30 days (or 120 days where an industrial process shutdown would be necessary) of an alert and, if the leak rate is above the applicable leak rate as described in § 84.106(c)(2), comply with the full suite of leak repair provisions in § 84.106; or
Citations to §84.106(a)(2)
-
(1) If the refrigerant in a refrigerant-containing appliance contains a substitute for a regulated substance, whether the global warming potential of the substitute is greater than 53 will be determined as described in § 84.106(a)(2).
Citations to §84.106(c)(2)
-
(1) Calculate the leak rate within 30 days (or 120 days where an industrial process shutdown would be necessary) of an alert and, if the leak rate is above the applicable leak rate as described in § 84.106(c)(2), comply with the full suite of leak repair provisions in § 84.106; or
Citations to §84.106(d)
-
(1) Owners or operators must repair leaks in refrigerant-containing appliances with a leak rate over the applicable leak rate in this paragraph in accordance with paragraphs (d) through (f) of this section unless the owner or operator elects to retrofit or retire the refrigerant-containing appliance in compliance with paragraphs (h) and (i) of this section. If the owner or operator elects to repair leaks but fails to bring the leak rate below the applicable leak rate, the owner or operator must create and implement a retrofit or retirement plan in accordance with paragraphs (h) and (i) of this section. Repairs must be conducted by a certified technician, as defined in this subpart.
Citations to §84.106(d)(f)
-
(3) The time frames in paragraphs (d) through (f) of this section are temporarily suspended when an appliance is mothballed. The time will resume on the day additional refrigerant is added to the refrigerant-containing appliance (or component of a refrigerant-containing appliance if the leaking component was isolated).
Citations to §84.106(e)
-
(1) Owners or operators must repair leaks in refrigerant-containing appliances with a leak rate over the applicable leak rate in this paragraph in accordance with paragraphs (d) through (f) of this section unless the owner or operator elects to retrofit or retire the refrigerant-containing appliance in compliance with paragraphs (h) and (i) of this section. If the owner or operator elects to repair leaks but fails to bring the leak rate below the applicable leak rate, the owner or operator must create and implement a retrofit or retirement plan in accordance with paragraphs (h) and (i) of this section. Repairs must be conducted by a certified technician, as defined in this subpart.
Citations to §84.106(f)
-
(1) Owners or operators must repair leaks in refrigerant-containing appliances with a leak rate over the applicable leak rate in this paragraph in accordance with paragraphs (d) through (f) of this section unless the owner or operator elects to retrofit or retire the refrigerant-containing appliance in compliance with paragraphs (h) and (i) of this section. If the owner or operator elects to repair leaks but fails to bring the leak rate below the applicable leak rate, the owner or operator must create and implement a retrofit or retirement plan in accordance with paragraphs (h) and (i) of this section. Repairs must be conducted by a certified technician, as defined in this subpart.
Citations to §84.106(f)(1)
-
(f) Owners or operators are permitted more than 30 days (or 120 days if an industrial process shutdown is required) to comply with paragraphs (d) and (e) of this section if they meet the requirements of paragraphs (f)(1) through (4) of this section or the refrigerant-containing appliance is mothballed. Extension requests must be signed by an authorized company official. The request will be considered approved unless EPA notifies the owners or operators otherwise.(1) One or more of the following conditions must apply:(i) The refrigerant-containing appliance is located in an area subject to radiological contamination or shutting down the refrigerant-containing appliance will directly lead to radiological contamination. Additional time is permitted to the extent needed to conduct and finish repairs in a safe working environment.(ii) Requirements of other applicable Federal, State, local, or Tribal regulations make repairs within 30 days (or 120 days if an industrial process shutdown is required) impossible. Additional time is permitted to the extent needed to comply with the pertinent regulations.(iii) Components that must be replaced are not available within 30 days (or 120 days if an industrial process shutdown is required). Additional time is permitted up to 30 days after receiving delivery of the necessary components, not to exceed 180 days (or 270 days if an industrial process shutdown is required) from the date the refrigerant-containing appliance exceeded the applicable leak rate.(2) Repairs to leaks that the technician has identified as significantly contributing to the exceedance of the leak rate and that do not require additional time must be completed and verified within the initial 30-day repair period (or 120-day repair period if an industrial process shutdown is required);(3) The owner or operator must document all repair efforts and the reason for the inability to make all necessary repairs within the initial 30-day repair period (or 120-day repair period if an industrial process shutdown is required); and(4) The owner or operator must request an extension from EPA electronically, using the Agency's applicable reporting platform, within 30 days (or 120 days if an industrial process shutdown is required) of the refrigerant-containing appliance exceeding the applicable leak rate in paragraph (c) of this section. Extension requests must include: Identification and address of the facility; the name of the owner or operator of the refrigerant-containing appliance; the leak rate; the method used to determine the leak rate and full charge; the date the refrigerant-containing appliance exceeded the applicable leak rate; the location of leak(s) to the extent determined to date; any repairs that have been performed thus far, including the date that repairs were completed; the reasons why more than 30 days (or 120 days if an industrial process shutdown is required) are needed to complete the repairs; an estimate of when the repairs will be completed; and a signature from an authorized company official. If the estimated completion date is to be extended, a new estimated date of completion and documentation of the reason for that change must be submitted to EPA within 30 days of identifying that the completion date must be extended. The owner or operator must keep a dated copy of these submissions.
Citations to §84.106(f)(2)
-
(f) Owners or operators are permitted more than 30 days (or 120 days if an industrial process shutdown is required) to comply with paragraphs (d) and (e) of this section if they meet the requirements of paragraphs (f)(1) through (4) of this section or the refrigerant-containing appliance is mothballed. Extension requests must be signed by an authorized company official. The request will be considered approved unless EPA notifies the owners or operators otherwise.(1) One or more of the following conditions must apply:(i) The refrigerant-containing appliance is located in an area subject to radiological contamination or shutting down the refrigerant-containing appliance will directly lead to radiological contamination. Additional time is permitted to the extent needed to conduct and finish repairs in a safe working environment.(ii) Requirements of other applicable Federal, State, local, or Tribal regulations make repairs within 30 days (or 120 days if an industrial process shutdown is required) impossible. Additional time is permitted to the extent needed to comply with the pertinent regulations.(iii) Components that must be replaced are not available within 30 days (or 120 days if an industrial process shutdown is required). Additional time is permitted up to 30 days after receiving delivery of the necessary components, not to exceed 180 days (or 270 days if an industrial process shutdown is required) from the date the refrigerant-containing appliance exceeded the applicable leak rate.(2) Repairs to leaks that the technician has identified as significantly contributing to the exceedance of the leak rate and that do not require additional time must be completed and verified within the initial 30-day repair period (or 120-day repair period if an industrial process shutdown is required);(3) The owner or operator must document all repair efforts and the reason for the inability to make all necessary repairs within the initial 30-day repair period (or 120-day repair period if an industrial process shutdown is required); and(4) The owner or operator must request an extension from EPA electronically, using the Agency's applicable reporting platform, within 30 days (or 120 days if an industrial process shutdown is required) of the refrigerant-containing appliance exceeding the applicable leak rate in paragraph (c) of this section. Extension requests must include: Identification and address of the facility; the name of the owner or operator of the refrigerant-containing appliance; the leak rate; the method used to determine the leak rate and full charge; the date the refrigerant-containing appliance exceeded the applicable leak rate; the location of leak(s) to the extent determined to date; any repairs that have been performed thus far, including the date that repairs were completed; the reasons why more than 30 days (or 120 days if an industrial process shutdown is required) are needed to complete the repairs; an estimate of when the repairs will be completed; and a signature from an authorized company official. If the estimated completion date is to be extended, a new estimated date of completion and documentation of the reason for that change must be submitted to EPA within 30 days of identifying that the completion date must be extended. The owner or operator must keep a dated copy of these submissions.
Citations to §84.106(f)(3)
-
(f) Owners or operators are permitted more than 30 days (or 120 days if an industrial process shutdown is required) to comply with paragraphs (d) and (e) of this section if they meet the requirements of paragraphs (f)(1) through (4) of this section or the refrigerant-containing appliance is mothballed. Extension requests must be signed by an authorized company official. The request will be considered approved unless EPA notifies the owners or operators otherwise.(1) One or more of the following conditions must apply:(i) The refrigerant-containing appliance is located in an area subject to radiological contamination or shutting down the refrigerant-containing appliance will directly lead to radiological contamination. Additional time is permitted to the extent needed to conduct and finish repairs in a safe working environment.(ii) Requirements of other applicable Federal, State, local, or Tribal regulations make repairs within 30 days (or 120 days if an industrial process shutdown is required) impossible. Additional time is permitted to the extent needed to comply with the pertinent regulations.(iii) Components that must be replaced are not available within 30 days (or 120 days if an industrial process shutdown is required). Additional time is permitted up to 30 days after receiving delivery of the necessary components, not to exceed 180 days (or 270 days if an industrial process shutdown is required) from the date the refrigerant-containing appliance exceeded the applicable leak rate.(2) Repairs to leaks that the technician has identified as significantly contributing to the exceedance of the leak rate and that do not require additional time must be completed and verified within the initial 30-day repair period (or 120-day repair period if an industrial process shutdown is required);(3) The owner or operator must document all repair efforts and the reason for the inability to make all necessary repairs within the initial 30-day repair period (or 120-day repair period if an industrial process shutdown is required); and(4) The owner or operator must request an extension from EPA electronically, using the Agency's applicable reporting platform, within 30 days (or 120 days if an industrial process shutdown is required) of the refrigerant-containing appliance exceeding the applicable leak rate in paragraph (c) of this section. Extension requests must include: Identification and address of the facility; the name of the owner or operator of the refrigerant-containing appliance; the leak rate; the method used to determine the leak rate and full charge; the date the refrigerant-containing appliance exceeded the applicable leak rate; the location of leak(s) to the extent determined to date; any repairs that have been performed thus far, including the date that repairs were completed; the reasons why more than 30 days (or 120 days if an industrial process shutdown is required) are needed to complete the repairs; an estimate of when the repairs will be completed; and a signature from an authorized company official. If the estimated completion date is to be extended, a new estimated date of completion and documentation of the reason for that change must be submitted to EPA within 30 days of identifying that the completion date must be extended. The owner or operator must keep a dated copy of these submissions.
Citations to §84.106(f)(4)
-
(f) Owners or operators are permitted more than 30 days (or 120 days if an industrial process shutdown is required) to comply with paragraphs (d) and (e) of this section if they meet the requirements of paragraphs (f)(1) through (4) of this section or the refrigerant-containing appliance is mothballed. Extension requests must be signed by an authorized company official. The request will be considered approved unless EPA notifies the owners or operators otherwise.(1) One or more of the following conditions must apply:(i) The refrigerant-containing appliance is located in an area subject to radiological contamination or shutting down the refrigerant-containing appliance will directly lead to radiological contamination. Additional time is permitted to the extent needed to conduct and finish repairs in a safe working environment.(ii) Requirements of other applicable Federal, State, local, or Tribal regulations make repairs within 30 days (or 120 days if an industrial process shutdown is required) impossible. Additional time is permitted to the extent needed to comply with the pertinent regulations.(iii) Components that must be replaced are not available within 30 days (or 120 days if an industrial process shutdown is required). Additional time is permitted up to 30 days after receiving delivery of the necessary components, not to exceed 180 days (or 270 days if an industrial process shutdown is required) from the date the refrigerant-containing appliance exceeded the applicable leak rate.(2) Repairs to leaks that the technician has identified as significantly contributing to the exceedance of the leak rate and that do not require additional time must be completed and verified within the initial 30-day repair period (or 120-day repair period if an industrial process shutdown is required);(3) The owner or operator must document all repair efforts and the reason for the inability to make all necessary repairs within the initial 30-day repair period (or 120-day repair period if an industrial process shutdown is required); and(4) The owner or operator must request an extension from EPA electronically, using the Agency's applicable reporting platform, within 30 days (or 120 days if an industrial process shutdown is required) of the refrigerant-containing appliance exceeding the applicable leak rate in paragraph (c) of this section. Extension requests must include: Identification and address of the facility; the name of the owner or operator of the refrigerant-containing appliance; the leak rate; the method used to determine the leak rate and full charge; the date the refrigerant-containing appliance exceeded the applicable leak rate; the location of leak(s) to the extent determined to date; any repairs that have been performed thus far, including the date that repairs were completed; the reasons why more than 30 days (or 120 days if an industrial process shutdown is required) are needed to complete the repairs; an estimate of when the repairs will be completed; and a signature from an authorized company official. If the estimated completion date is to be extended, a new estimated date of completion and documentation of the reason for that change must be submitted to EPA within 30 days of identifying that the completion date must be extended. The owner or operator must keep a dated copy of these submissions.
Citations to §84.106(g)
-
(3) Where a refrigerant-containing appliance using an automatic leak detection system is found to be leaking above the applicable leak rate as described in § 84.106(c)(2), and the automatic leak system is only being used to monitor portions of an appliance, the remainder of the appliance continues to be subject to any applicable leak inspection requirements, as described in § 84.106(g).(i) The owner or operator must maintain records for at least three years in electronic or paper format, unless otherwise specified, regarding:
Citations to §84.106(l)(2)(i)
-
(4) If the installation, service, repair, or disposal is done by someone other than the owner or operator, that person must provide a record containing the information specified in paragraph (l)(2)(i) through (l)(2)(vi) of this section, when applicable, to the owner or operator.
Citations to §84.106(l)(2)(ii)
-
(4) If the installation, service, repair, or disposal is done by someone other than the owner or operator, that person must provide a record containing the information specified in paragraph (l)(2)(i) through (l)(2)(vi) of this section, when applicable, to the owner or operator.
Citations to §84.106(l)(2)(iii)
-
(4) If the installation, service, repair, or disposal is done by someone other than the owner or operator, that person must provide a record containing the information specified in paragraph (l)(2)(i) through (l)(2)(vi) of this section, when applicable, to the owner or operator.
Citations to §84.106(l)(2)(iv)
-
(4) If the installation, service, repair, or disposal is done by someone other than the owner or operator, that person must provide a record containing the information specified in paragraph (l)(2)(i) through (l)(2)(vi) of this section, when applicable, to the owner or operator.
Citations to §84.106(l)(2)(v)
-
(4) If the installation, service, repair, or disposal is done by someone other than the owner or operator, that person must provide a record containing the information specified in paragraph (l)(2)(i) through (l)(2)(vi) of this section, when applicable, to the owner or operator.
Citations to §84.106(l)(2)(vi)
-
(4) If the installation, service, repair, or disposal is done by someone other than the owner or operator, that person must provide a record containing the information specified in paragraph (l)(2)(i) through (l)(2)(vi) of this section, when applicable, to the owner or operator.