§80.1450. What are the registration requirements under the RFS program?
40 C.F.R. § 80.1450
(1) A process diagram with all relevant unit processes labeled and a designation of which unit process is capable of performing cellulosic treatment, including required inputs and outputs at each step.
(2) A description of the cellulosic biomass treatment process, including required inputs and outputs used at each step.
(3) A description of the mechanical, chemical and biochemical mechanisms by which cellulosic materials can be converted to biofuel products.
(1) For each biointermediate production facility, the company name, EPA company registration number, and EPA facility registration number of the renewable fuel producer and renewable fuel production facility at which the biointermediate produced from the biointermediate production facility will be transferred and used.
(2) Copies of documents and corresponding calculations demonstrating production capacity of each biointermediate produced at the biointermediate production facility.
(3) For each type of feedstock that the biointermediate producer intends to process the biointermediate producer must provide all the following:
(i) A list of all the feedstocks the facility intends to utilize without significant modification to the existing facility.
(ii) A description of the type(s) of renewable biomass that will be used as feedstock material to produce the biointermediate.
(4) The approved pathway(s) that the biointermediate could be used in to produce renewable fuel.
(2) The name and address of the company supplying each process heat fuel to the renewable fuel production facility, foreign ethanol production facility, or biointermediate production facility.
(2) Name of suppliers of all biogas the producer purchases for use for process heat in the facility.
(3) An affidavit from the biogas supplier stating its intent to supply biogas to the renewable fuel producer, foreign ethanol producer, or biointermediate producer, and the quantity and energy content of the biogas that it intends to provide to the renewable fuel producer or foreign ethanol producer.
(1) Applicable air permits issued by EPA, state, local air pollution control agencies, or foreign governmental agencies that govern the construction and/or operation of the renewable fuel production facility that were:
(i) Issued or revised no later than December 19, 2007, for facilities described in § 80.1403(c); or
(ii) Issued or revised no later than December 31, 2009, for facilities described in § 80.1403(d).
(2) If the air permits specified in paragraph (b)(1)(v)(B)(1) of this section do not specify the maximum rated annual volume output of renewable fuel, copies of documents demonstrating the facility's actual peak capacity.
(1) Copies of all contracts or affidavits, as applicable, that follow the track of the biogas/CNG/LNG from its original source, to the producer that processes it into renewable fuel, and finally to the end user that will actually use the renewable CNG/LNG for transportation purposes.
(2) Specific quantity, heat content, and percent efficiency of transfer, as applicable, and any conversion factors, for the renewable fuel derived from biogas.
(2) For biogas producers, RNG producers, and biogas closed distribution system RIN generators not registered prior to July 1, 2024, the registration requirements under § 80.135 apply.
(1) The location of any establishment from which the waste stream consisting solely of separated yard waste is collected.
(2) A plan documenting how the waste will be collected and how the renewable fuel producer or foreign ethanol producer will conduct ongoing verification that such waste consists only of yard waste (and incidental other components such as paper and plastics) that is kept separate since generation from other waste materials.
(1) A plan documenting the type(s) of separated food waste or biogenic waste oils/fats/greases, the type(s) of establishment from which the waste is collected, how the waste will be collected, a description of ongoing verification measures that demonstrate such waste consists only of food waste (and an incidental amount of other components such as paper and plastics) or biogenic waste oils/fats/greases that is kept separate from other waste materials, and if applicable, how the cellulosic and non-cellulosic portions of the waste will be quantified.
(2) [Reserved]
(1) Extent and nature of recycling that occurred prior to receipt of the waste material by the renewable fuel producer, foreign ethanol producer, or biointermediate producer;
(2) Identification of available recycling technology and practices that are appropriate for removing recycling materials from the waste stream by the fuel producer, foreign ethanol producer, or biointermediate producer; and
(3) Identification of the technology or practices selected for implementation by the fuel producer, foreign ethanol producer, or biointermediate producer including an explanation for such selection, and reasons why other technologies or practices were not.
(1) Locations from which the biogas used at the facility was produced or extracted.
(2) Name of suppliers of all biogas used at the facility.
(3) An affidavit from each biogas supplier stating its intent to supply biogas to the renewable fuel producer or foreign ethanol producer, the quantity and energy content of the biogas that it intends to provide to the renewable fuel producer or foreign ethanol producer, and that the biogas will be derived solely from landfills, waste treatment plants, and/or waste digesters.
(4) If the producer intends to generate advanced biofuel RINs, estimates of the total amount of electricity used from the grid, the total amount of ethanol produced, and a calculation of the amount of electricity used from the grid per gallon of ethanol produced.
(5) If the producer intends to generate advanced biofuel RINs, a description of how the facility intends to demonstrate and document that not more than 0.15 kWh of grid electricity is used per gallon of ethanol produced, calculated on a per batch basis, at the time of RIN generation.
(1) A Risk Mitigation Plan (Plan) that demonstrates the growth of Arundo donax or Pennisetum purpureum will not pose a significant likelihood of spread beyond the planting area of the feedstock used for production of the renewable fuel. The Plan must identify and incorporate best management practices (BMPs) into the production, management, transport, collection, monitoring, and processing of the feedstock. To the extent practicable, the Risk Mitigation Plan should utilize a Hazard Analysis Critical Control Point (HACCP) approach to examine each phase of the pathway to identify spread reduction steps. BMPs should include the development of mitigation strategies and plans to minimize escape and other impacts (e.g., minimize soil disturbance), incorporate desirable traits (e.g., sterility or reduced seed production), develop and implement dispersal mitigation protocols prior to cultivation, develop multiple year eradication controls. Eradication controls should follow an approach of early detection and rapid response (EDRR) to unintended spread. EDRR efforts should demonstrate the likelihood that invasions will be halted while still localized and identify and employ cooperative networks, communication forums, and consultation processes with federal, state, and local agencies. The Risk Mitigation Plan must provide for the following:
(i) Monitoring and reporting data for a period prior to planting that is sufficient to establish a baseline, through crop production, and extending beyond crop production for a sufficient period after the field is no longer used for feedstock production to ensure no remnants of giant reed or napier grass survive or spread.
(ii) Monitoring must include the area encompassing the feedstock growing areas, the transportation corridor between the growing areas and the renewable fuel production facility, and the renewable fuel production facility, extending to the distance of potential propagation of the feedstock species, or further if necessary.
(iii) Monitoring must reflect the likelihood of spread specific to the feedstock.
(iv) A closure plan providing for the destruction and removal of feedstock from the growing area upon abandonment by the feedstock grower or end of production.
(v) A plan providing for an independent third party who will audit the monitoring and reporting conducted in accordance with the Plan on an annual basis, subject to approval of a different frequency by EPA.
(2) A letter from the United States Department of Agriculture (“USDA”) to the renewable fuel producer stating USDA's conclusions and the bases therefore regarding whether the Arundo donax or Pennisetum purpureum does or does not present a significant likelihood of spread beyond the planting area of the feedstock used for production of the renewable fuel as proposed by the producer. This letter shall also include USDA's recommendation of whether it is appropriate to require the use of a financial mechanism to ensure the availability of financial resources sufficient to cover reasonable potential remediation costs associated with the invasive spread of giant reed or napier grass beyond the intended planting areas. In coordination with USDA, EPA shall identify for the producer the appropriate USDA office from which the letter should originate.
(3) Identification of all federal, state, regional, and local requirements related to invasive species that are applicable for the feedstock at the growing site and at all points between the growing site and the fuel production site.
(4) A copy of all state and local growing permits held by the feedstock grower.
(5) A communication plan for notifying EPA's Office of Transportation and Air Quality, USDA, adjacent federal land management agencies, and any relevant state, tribal, regional, and local authorities as soon as possible after identification of the issue if the feedstock is detected outside planted area.
(6) A copy of the agreement between the feedstock grower and fuel producer establishing all rights and duties of the parties related to the Risk Mitigation Plan and any other activities and liability associated with the prevention of the spread of Arundo donax and/or Pennisetum purpureum outside of the intended planting area.
(7) A copy of the agreement between the fuel producer and an independent third party describing how the third party will audit the monitoring and reporting conducted in accordance with the Risk Mitigation Plan on an annual basis, subject to approval of a different timeframe by EPA.
(8) Information on the financial resources or other financial mechanism (such as a state-administered fund, bond, or certificate of deposit) that would be available to finance reasonable remediation activities associated with the potential spread of giant reed or napier grass beyond the intended planting areas, and information on whether it is necessary to have any further such resources or mechanism. EPA may require a demonstration that there is an adequate financial mechanism (such as a state-administered fund, bond, or certificate of deposit) to ensure the availability of financial resources sufficient to cover reasonable potential remediation costs associated with the spread of giant reed or napier grass beyond the intended planting areas.
(9) EPA may require additional information as appropriate.
(1) Clear and compelling evidence, including information and supporting data, demonstrating that Arundo donax or Pennisetum purpureum does not present a significant likelihood of spread beyond the planting area of the feedstock used for production of the renewable fuel. Evidence must include data collected from similar environments (soils, temperatures, precipitation, USDA Hardiness Zones) as the proposed feedstock production project site and accepted by the scientific community. Such a demonstration should include consideration of the elements of a Risk Mitigation Plan set forth in paragraph (b)(1)(x)(A) of this section, fully disclose the potential invasiveness of the feedstock, provide a closure plan for the destruction and removal of feedstock from the growing area upon abandonment by the feedstock grower or end of production, and explain why a Risk Mitigation Plan is not needed to make the required determination.
(2) A letter from the United States Department of Agriculture (“USDA”) to the renewable fuel producer stating USDA's conclusions and the bases therefore regarding whether the Arundo donax or Pennisetum purpureum does or does not present a significant likelihood of spread beyond the planting area of the feedstock used for production of the renewable fuel as proposed by the producer or importer. In coordination with USDA, EPA shall identify for the producer the appropriate USDA office from which the letter should originate.
(1) The name, location and contact information for the party that will blend the renewable fuel.
(2) A copy of the contract that requires the party to blend the renewable fuel into gasoline or diesel fuel to produce a transportation fuel, heating oil or jet fuel that meets all applicable standards.
(1) Data showing the average adjusted cellulosic content of the feedstock(s) to be used to produce fuel or biointermediate, based on the average of at least three representative samples. Cellulosic content data must come from an analytical method certified by a voluntary consensus standards body or using a method that would produce reasonably accurate results as demonstrated through peer reviewed references provided to the third party engineer performing the engineering review at registration. Samples must be of representative feedstock from the primary feedstock supplier that will provide the renewable fuel or biointermediate producer with feedstock subsequent to registration.
(2) For renewable fuel and biointermediate producers who want to use a new feedstock(s) after initial registration, updates to their registration under paragraph (d) of this section indicating the average adjusted cellulosic content of the new feedstock.
(3) For renewable fuel producers already registered as of August 18, 2014, to produce a single type of fuel that qualifies for D code 3 or D code 7 RINs (or would do so after denaturing) using two or more feedstocks converted simultaneously using only a thermochemical process, the information specified in this paragraph (b)(1)(xiii)(A) shall be provided at the next required registration update under paragraph (d) of this section.
(1) The expected overall fuel or biointermediate yield, calculated as the total volume of fuel produced per batch (e.g., cellulosic biofuel plus all other fuel) divided by the total feedstock mass per batch on a dry weight basis (e.g., cellulosic feedstock plus all other feedstocks).
(2) The cellulosic Converted Fraction (CF) that will be used for generating RINs under § 80.1426(f)(3)(vi).
(3) Chemical analysis data supporting the calculated cellulosic Converted Fraction and a discussion of the possible variability that could be expected between reporting periods per § 80.1451(b)(1)(ii)(U)(1). Data used to calculate the cellulosic CF must be representative and obtained using an analytical method certified by a voluntary consensus standards body, or using a method that would produce reasonably accurate results as demonstrated through peer reviewed references provided to the third party engineer performing the engineering review at registration.
(4) A description and calculations showing how the data were used to determine the cellulosic Converted Fraction.
(5) For renewable fuel producers already registered as of August 18, 2014, to produce a single type of fuel that qualifies for D code 3 or D code 7 RINs (or would do so after denaturing) using two or more feedstocks converted simultaneously using a combination of processes or a process other than a thermochemical process, the information specified in this paragraph (b)(1)(xiii)(B) shall be provided at the next required registration update under paragraph (d) of this section.
(2) Digital photographs of a process unit are not required if the third-party engineer submits documentation demonstrating why they were unable to access certain locations due to access issues or safety concerns. EPA may not accept a registration if EPA is unable to determine whether the facility is capable of producing the requested renewable fuel, biointermediate, biogas, or RNG, as applicable, due to the lack of sufficient digital photographs of process units for the facility.
“I certify that the engineering review and written report required and submitted under 40 CFR 80.1450(b)(2) was conducted and prepared by me, or under my direction or supervision, in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information upon which the engineering review was conducted and the written report is based. I further certify that the engineering review was conducted and this written report was prepared pursuant to the requirements of 40 CFR part 80 and all other applicable auditing, competency, independence, impartiality, and conflict of interest standards and protocols. Based on my personal knowledge and experience, and inquiry of personnel involved, the information submitted herein is true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations.”
(2) A biointermediate producer may only change the designated renewable fuel production facility under paragraph (b)(1)(ii)(B)(1) of this section for each biointermediate production facility one time per calendar year unless EPA, in its sole discretion, allows the biointermediate producer to change the designated renewable fuel production facility more frequently.
(1) The representative sample must be selected in accordance with the sample size guidelines set forth at 40 CFR 1090.1805.
(2) For updated independent third-party engineering reviews submitted after January 31, 2024, the representative sample must be selected from batches of renewable fuel produced through at least the second quarter of the calendar year prior to the applicable January 31 deadline.
Notes, amendments, and revision history
Amendments
[75 FR 14863, Mar. 26, 2010, as amended at 75 FR 26043, May 10, 2010; 77 FR 1356, Jan. 9, 2012; 77 FR 74606, Dec. 17, 2012; 78 FR 41714, July 11, 2013; 78 FR 62471, Oct. 22, 2013; 79 FR 42163, July 18, 2014; 79 FR 42115, July 18, 2014; 85 FR 7077, Feb. 6, 2020; 85 FR 78467, Dec. 4, 2020; 87 FR 39665, July 1, 2022; 88 FR 44586, July 12, 2023; 88 FR 51239, Aug. 3, 2023; 88 FR 44587, July 12, 2023; 91 FR 16493, Apr. 1, 2026]
Source
Source: 75 FR 14863, Mar. 26, 2010, unless otherwise noted.
Authority
Authority: 42 U.S.C. 7414, 7521, 7542, 7545, and 7601(a).
Source
Source: 38 FR 1255, Jan. 10, 1973, unless otherwise noted.
Amendments
[75 FR 14863, Mar. 26, 2010, as amended at 75 FR 26043, May 10, 2010; 77 FR 1356, Jan. 9, 2012; 77 FR 74606, Dec. 17, 2012; 78 FR 41714, July 11, 2013; 78 FR 62471, Oct. 22, 2013; 79 FR 42163, July 18, 2014; 79 FR 42115, July 18, 2014; 85 FR 7077, Feb. 6, 2020; 85 FR 78467, Dec. 4, 2020; 87 FR 39665, July 1, 2022; 88 FR 44586, July 12, 2023; 88 FR 51239, Aug. 3, 2023; 88 FR 44587, July 12, 2023; 91 FR 16493, Apr. 1, 2026]