§8.8. Comprehensive environmental evaluation. — Inbound Citations
40 C.F.R. § 8.8
Statutory Authority
Cited by 4 regulations in release Current.
Citations to 40 U.S.C. § 8.8 as a whole
-
As used in this part:
-
(c) The type of environmental document required under this part depends upon the nature and intensity of the environmental impacts that could result from the activity under consideration. A PERM must be prepared by the operator to document the conclusion of the operator's preliminary environmental review that the impact of a proposed activity on the Antarctic environment will be less than minor or transitory. (See § 8.6.) An IEE must be prepared by the operator for proposed activities which may have at least (but no more than) a minor or transitory impact on the Antarctic environment. (See § 8.7.) A CEE must be prepared by the operator if an IEE indicates, or if it is otherwise determined, that a proposed activity is likely to have more than a minor or transitory impact on the Antarctic environment (See § 8.8.)
-
-
(2) If a CEE is required, the operator must adhere to the time limits applicable to such documentation. (See: § 8.8.) In this event EPA, at the operator's request, will consult with the operator regarding possible changes in the proposed activity which would allow preparation of an IEE.