§8.7. Initial environmental evaluation. — Inbound Citations

40 C.F.R. § 8.7

Cited by 4 regulations in release Current.

Citations to 40 C.F.R. § 8.7 as a whole

  • As used in this part:
  • (c) The type of environmental document required under this part depends upon the nature and intensity of the environmental impacts that could result from the activity under consideration. A PERM must be prepared by the operator to document the conclusion of the operator's preliminary environmental review that the impact of a proposed activity on the Antarctic environment will be less than minor or transitory. (See § 8.6.) An IEE must be prepared by the operator for proposed activities which may have at least (but no more than) a minor or transitory impact on the Antarctic environment. (See § 8.7.) A CEE must be prepared by the operator if an IEE indicates, or if it is otherwise determined, that a proposed activity is likely to have more than a minor or transitory impact on the Antarctic environment (See § 8.8.)
  • (b) If EPA recommends an IEE and one is prepared and submitted within the seventy-five (75) day response period, it will be reviewed under the time frames set out for an IEE in § 8.7. If EPA recommends a CEE and one is prepared, it will be reviewed under the time frames set out for a CEE in § 8.8.
  • (1) Rule 8.7, submitted on October 12, 1979.