§8.6. Preliminary environmental review. — Inbound Citations
40 C.F.R. § 8.6
Statutory Authority
Cited by 5 regulations in release Current.
Citations to 40 C.F.R. § 8.6 as a whole
-
As used in this part:
-
(c) The type of environmental document required under this part depends upon the nature and intensity of the environmental impacts that could result from the activity under consideration. A PERM must be prepared by the operator to document the conclusion of the operator's preliminary environmental review that the impact of a proposed activity on the Antarctic environment will be less than minor or transitory. (See § 8.6.) An IEE must be prepared by the operator for proposed activities which may have at least (but no more than) a minor or transitory impact on the Antarctic environment. (See § 8.7.) A CEE must be prepared by the operator if an IEE indicates, or if it is otherwise determined, that a proposed activity is likely to have more than a minor or transitory impact on the Antarctic environment (See § 8.8.)
-
(a) Unless a PERM has been submitted pursuant to § 8.6 which meets the environmental documentation requirements under Article 8 and Annex I to the Protocol and the provisions of this part or a CEE is being prepared, an IEE shall be submitted by the operator to the EPA no fewer than ninety (90) days before the proposed departure of the expedition.
-
(iv) Section 8.6 of the method allowing for the use of “Dynamic Spiking” as an alternative to the interference and system bias checks of the method. Dynamic spiking may be conducted (optionally) as an additional quality assurance check; and
-
(A) EQB may designate a water as Class SA or SE (ONRWs) through a Resolution (PRWQSR Sections 2.1.1 and 2.2.1). Additionally, any interested party may nominate a specific water to be classified as an ONRW and the Governing Board of EQB will make the final determination. Classifying a water as an ONRW may result in the water being named in either Section 2.1.1 or 2.2.2 of the PRWQSR, which would require an amendment of the PRWQSR. The process for amending the PRWQSR, including public participation, is set forth in Section 8.6 of said regulation.