US Codex
C.F.R.
Browse by date
Notes

§761.75. Chemical waste landfills. — Inbound Citations

40 C.F.R. § 761.75

Cited by 16 regulations in release Current.

Citations to 40 U.S.C. § 761.75 as a whole

Citations to §761.75(b)

Citations to §761.75(b)(1)(ii)

  • (7) A cap means, when referring to on-site cleanup and disposal of PCB remediation waste, a uniform placement of concrete, asphalt, or similar material of minimum thickness spread over the area where remediation waste was removed or left in place in order to prevent or minimize human exposure, infiltration of water, and erosion. Any person designing and constructing a cap must do so in accordance with § 264.310(a) of this chapter, and ensure that it complies with the permeability, sieve, liquid limit, and plasticity index parameters in §§ 761.75(b)(1)(ii) through (v). A cap of compacted soil shall have a minimum thickness of 25 cm (10 inches). A concrete or asphalt cap shall have a minimum thickness of 15 cm (6 inches). A cap must be of sufficient strength to maintain its effectiveness and integrity during the use of the cap surface which is exposed to the environment. A cap shall not be contaminated at a level ≥1 ppm PCB. Repairs shall begin within 72 hours of discovery for any breaches which would impair the integrity of the cap.

Citations to §761.75(b)(1)(iii)

  • (7) A cap means, when referring to on-site cleanup and disposal of PCB remediation waste, a uniform placement of concrete, asphalt, or similar material of minimum thickness spread over the area where remediation waste was removed or left in place in order to prevent or minimize human exposure, infiltration of water, and erosion. Any person designing and constructing a cap must do so in accordance with § 264.310(a) of this chapter, and ensure that it complies with the permeability, sieve, liquid limit, and plasticity index parameters in §§ 761.75(b)(1)(ii) through (v). A cap of compacted soil shall have a minimum thickness of 25 cm (10 inches). A concrete or asphalt cap shall have a minimum thickness of 15 cm (6 inches). A cap must be of sufficient strength to maintain its effectiveness and integrity during the use of the cap surface which is exposed to the environment. A cap shall not be contaminated at a level ≥1 ppm PCB. Repairs shall begin within 72 hours of discovery for any breaches which would impair the integrity of the cap.

Citations to §761.75(b)(1)(iv)

  • (7) A cap means, when referring to on-site cleanup and disposal of PCB remediation waste, a uniform placement of concrete, asphalt, or similar material of minimum thickness spread over the area where remediation waste was removed or left in place in order to prevent or minimize human exposure, infiltration of water, and erosion. Any person designing and constructing a cap must do so in accordance with § 264.310(a) of this chapter, and ensure that it complies with the permeability, sieve, liquid limit, and plasticity index parameters in §§ 761.75(b)(1)(ii) through (v). A cap of compacted soil shall have a minimum thickness of 25 cm (10 inches). A concrete or asphalt cap shall have a minimum thickness of 15 cm (6 inches). A cap must be of sufficient strength to maintain its effectiveness and integrity during the use of the cap surface which is exposed to the environment. A cap shall not be contaminated at a level ≥1 ppm PCB. Repairs shall begin within 72 hours of discovery for any breaches which would impair the integrity of the cap.

Citations to §761.75(b)(1)(v)

  • (7) A cap means, when referring to on-site cleanup and disposal of PCB remediation waste, a uniform placement of concrete, asphalt, or similar material of minimum thickness spread over the area where remediation waste was removed or left in place in order to prevent or minimize human exposure, infiltration of water, and erosion. Any person designing and constructing a cap must do so in accordance with § 264.310(a) of this chapter, and ensure that it complies with the permeability, sieve, liquid limit, and plasticity index parameters in §§ 761.75(b)(1)(ii) through (v). A cap of compacted soil shall have a minimum thickness of 25 cm (10 inches). A concrete or asphalt cap shall have a minimum thickness of 15 cm (6 inches). A cap must be of sufficient strength to maintain its effectiveness and integrity during the use of the cap surface which is exposed to the environment. A cap shall not be contaminated at a level ≥1 ppm PCB. Repairs shall begin within 72 hours of discovery for any breaches which would impair the integrity of the cap.

Citations to §761.75(b)(6)(iii)

Citations to §761.75(b)(8)(ii)

Citations to §761.75(b)(8)(iii)

Citations to §761.75(c)

  • (3) Any applications and related correspondence sent by the owner or operator of the facility to any local, State, or Federal authorities in regard to waste water discharge permits, solid waste permits, building permits, or other permits or authorizations such as those required by §§ 761.70(d) and 761.75(c).