US Codex
C.F.R.
Browse by date
Notes

§71.3. Sources subject to permitting requirements. — Inbound Citations

40 C.F.R. § 71.3

Cited by 31 regulations in release Current.

Citations to 40 C.F.R. § 71.3 as a whole

Citations to §71.3(a)

  • (iii) The engine that is otherwise portable or transportable remains or will remain at a location for more than 12 consecutive months or a shorter period of time for an engine located at a seasonal source. A location is any single site at a building, structure, facility, or installation. Any engine (or engines) that replaces an engine at a location and that is intended to perform the same or similar function as the engine replaced will be included in calculating the consecutive time period. An engine located at a seasonal source is an engine that remains at a seasonal source during the full annual operating period of the seasonal source. For purposes of this paragraph, a seasonal source is a stationary source that remains in a single location on a permanent basis (i.e., at least 2 years) and that operates at that single location approximately 3 months (or more) each year. This paragraph does not apply to an engine after the engine is removed from the location.
    Nonroad vehicle means a vehicle that is powered by a nonroad engine and that is not a motor vehicle or a vehicle used solely for competition.
    Oil-fired boiler means a furnace or boiler used for combusting fuel oil for the primary purpose of producing steam or hot water by heat transfer.
    Opacity means the degree to which emissions reduce the transmission of light and obscure the view of an object in the background. For continuous opacity monitoring systems, opacity means the fraction of incident light that is attenuated by an optical medium.
    Open burning means the burning of a material that results in the products of combustion being emitted directly into the atmosphere without passing through a stack. Open burning includes burning in burn barrels.
    Owner or operator means any person who owns, leases, operates, controls, or supervises an air pollution source.
    Part 71 source means any source subject to the permitting requirements of 40 CFR part 71, as provided in §§ 71.3(a) and 71.3(b).
    Particleboard means a matformed flat panel consisting of wood particles bonded together with synthetic resin or other suitable binder.
    Particulate matter means any airborne finely divided solid or liquid material, other than uncombined water. Particulate matter includes, but is not limited to, PM10 and PM2.5.
    Permit to construct or construction permit means a permit issued by the Regional Administrator pursuant to 40 CFR part 49 or 40 CFR part 52, or a permit issued by a Tribe pursuant to a program approved by the Administrator under 40 CFR part 51, subpart I, authorizing the construction or modification of a stationary source.
    Permit to operate or operating permit means a permit issued by the Regional Administrator pursuant to § 49.139 or 40 CFR part 71, or by a Tribe pursuant to a program approved by the Administrator under 40 CFR part 51 or 40 CFR part 70, authorizing the operation of a stationary source.
    Plywood means a flat panel built generally of an odd number of thin sheets of veneers of wood in which the grain direction of each ply or layer is at right angles to the one adjacent to it.
    PM10 means particulate matter with an aerodynamic diameter less than or equal to 10 micrometers.
    PM2.5 means particulate matter with an aerodynamic diameter less than or equal to 2.5 micrometers.
    Potential to emit means the maximum capacity of an air pollution source to emit an air pollutant under its physical and operational design. Any physical or operational limitation on the capacity of the air pollution source to emit an air pollutant, including air pollution control equipment and restrictions on hours of operation or on the type or amount of material combusted, stored, or processed, shall be treated as part of its design if the limitation or the effect it would have on emissions is Federally enforceable.
    Press/Cooling vent means any opening through which particulate and gaseous emissions from plywood, particleboard, or hardboard manufacturing are exhausted, either by natural draft or powered fan, from the building housing the process. Such openings are generally located immediately above the board press, board unloader, or board cooling area.
    Process source means an air pollution source using a procedure or combination of procedures for the purpose of causing a change in material by either chemical or physical means, excluding combustion.
    Rated capacity means the maximum sustainable capacity of the equipment.
    Reference method means any method of sampling and analyzing for an air pollutant as specified in the applicable section.
    Refuse means all solid, liquid, or gaseous waste material, including but not limited to, garbage, trash, household refuse, municipal solid waste, construction or demolition debris, or waste resulting from the operation of any business, trade, or industry.
    Regional Administrator means the Regional Administrator of EPA Region 10 or an authorized representative of the Regional Administrator.
    Residual fuel oil means any oil meeting the specifications of ASTM Grade 4, Grade 5, or Grade 6 fuel oils in ASTM Method D396-04, Standard Specification for Fuel Oils (incorporated by reference, see § 49.123(e)).
    Smudge pot means a portable heater/burner that produces thick heavy smoke and that fruit growers place around an orchard in the evening to prevent the crop from freezing at night.
    Solid fuel means wood, refuse, refuse-derived fuel, tires, tire-derived fuel, and other solid combustible material (other than coal), including any combination thereof.
    Solid fuel-fired boiler means a furnace or boiler used for combusting solid fuel for the primary purpose of producing steam or hot water by heat transfer.
    Soot blowing means using steam or compressed air to remove carbon from a furnace or from a boiler's heat transfer surfaces.
    Source means the same as air pollution source.
    Stack means any point in a source that conducts air pollutants to the atmosphere, including, but not limited to, a chimney, flue, conduit, pipe, vent, or duct, but not including a flare.
    Standard conditions means a temperature of 293 degrees Kelvin (68 degrees Fahrenheit, 20 degrees Celsius) and a pressure of 101.3 kilopascals (29.92 inches of mercury).
    Start-up means the setting into operation of a piece of equipment.
    Stationary source means any building, structure, facility, or installation that emits, or may emit, any air pollutant.
    Tempering oven means any facility used to bake hardboard following an oil treatment process.
    Uncombined water means droplets of water that have not combined with hygroscopic particles or do not contain dissolved solids.
    Used oil means petroleum products that have been recovered from another application.
    Veneer means a single flat panel of wood not exceeding 1/4 inch in thickness formed by slicing or peeling from a log.
    Veneer dryer means equipment in which veneer is dried.
    Visible emissions means air pollutants in sufficient amount to be observable to the human eye.
    Wood means wood, wood residue, bark, or any derivative or residue thereof, in any form, including but not limited to sawdust, sanderdust, wood chips, scraps, slabs, millings, shavings, and processed pellets made from wood or other forest residues.
    Wood-fired boiler means a furnace or boiler used for combusting wood for the primary purpose of producing steam or hot water by heat transfer.
    Wood-fired veneer dryer means a veneer dryer that is directly heated by the products of combustion of wood in addition to, or exclusive of, steam or natural gas or propane combustion.
    Woodwaste burner means a wigwam burner, teepee burner, silo burner, olivine burner, truncated cone burner, or other such woodwaste-burning device used by the wood products industry for the disposal of wood wastes.
  • (b) If your new unit subject to this subpart is subject to title V as a result of some triggering requirement(s) other than this subpart (for example, a unit subject to this subpart may be a major source or part of a major source), then your unit may be required to apply for a title V permit prior to the deadlines specified in paragraph (a) of this section. If more than one requirement triggers a source's obligation to apply for a title V permit, the 12-month timeframe for filing a title V permit application is triggered by the requirement that first causes the source to be subject to title V. (See section 503(c) of the Clean Air Act and 40 CFR 70.3(a) and (b), 40 CFR 70.5(a)(1)(i), 40 CFR 71.3(a) and (b), and 40 CFR 71.5(a)(1)(i).)
  • (b) If your existing unit is subject to title V as a result of some triggering requirement(s) other than those specified in paragraph (a) of this section (for example, a unit may be a major source or part of a major source), then your unit may be required to apply for a title V permit prior to the deadlines specified in paragraph (a) of this section. If more than one requirement triggers a source's obligation to apply for a title V permit, the 12-month timeframe for filing a title V permit application is triggered by the requirement which first causes the source to be subject to title V. (See section 503(c) of the Clean Air Act and 40 CFR 70.3(a) and (b), 40 CFR 70.5(a)(1)(i), 40 CFR 71.3(a) and (b), and 40 CFR 71.5(a)(1)(i).)
  • (b) If your new SSI unit subject to this subpart is subject to title V as a result of some triggering requirement(s) other than this subpart (for example, a unit subject to this subpart may be a major source or part of a major source), then your unit may be required to apply for a title V permit prior to the deadlines specified in paragraph (a) of this section. If more than one requirement triggers a source's obligation to apply for a title V permit, the 12-month timeframe for filing a title V permit application is triggered by the requirement that first causes the source to be subject to title V. (See section 503(c) of the Clean Air Act and 40 CFR 70.3(a) and (b), 40 CFR 70.5(a)(1)(i), 40 CFR 71.3(a) and (b), and 40 CFR 71.5(a)(1)(i).)
  • (c) If your existing unit is subject to title V as a result of some triggering requirement(s) other than those specified in paragraphs (a) and (b) of this section (for example, a unit may be a major source or part of a major source), then your unit may be required to apply for a title V permit prior to the deadlines specified in paragraphs (a) and (b). If more than one requirement triggers a source's obligation to apply for a title V permit, the 12-month timeframe for filing a title V permit application is triggered by the requirement which first causes the source to be subject to title V. (See section 503(c) of the Clean Air Act and 40 CFR 70.3(a) and (b), 40 CFR 70.5(a)(1)(i), 40 CFR 71.3(a) and (b), and 40 CFR 71.5(a)(1)(i).)
  • (e) You must comply with the requirements specified in § 62.15395 and § 62.15400 regarding title V permitting. If you comply with all of the requirements specified in paragraphs (a), (b), and (c) of this section, you are no longer subject to title V permitting requirements as a result of this subpart. You will remain subject to title V permitting requirements, however, if you are subject as a result of one or more of the applicability criteria in 40 CFR 70.3(a) and (b) or 71.3(a) and (b).
  • (a) You must submit a complete title V permit application within 12 months of when your source first becomes subject to a title V permitting program. See 40 CFR 70.3(a) and (b), 70.5(a)(1), 71.3(a) and (b), and 71.5(a)(1). As provided in section 503(c) of the Clean Air Act, permitting authorities may establish permit application deadlines earlier than the 12-month deadline.
  • (c) If your existing unit is subject to title V as a result of some triggering requirement(s) other than those specified in paragraphs (a) and (b) of this section (for example, a unit may be a major source or part of a major source), then your unit may be required to apply for a title V permit prior to the deadlines specified in paragraphs (a) and (b). If more than one requirement triggers a source's obligation to apply for a title V permit, the 12-month time frame for filing a title V permit application is triggered by the requirement which first causes the source to be subject to title V. (See section 503(c) of the Clean Air Act and 40 CFR 70.3(a) and (b), 70.5(a)(1)(i), 71.3(a) and (b), and 71.5(a)(1)(i).)
  • (d) You are exempt from the obligation to obtain a permit under 40 CFR part 70 or 40 CFR part 71, provided you are not otherwise required by law to obtain a permit under § 70.3(a) or § 71.3(a). Notwithstanding the previous sentence, you must continue to comply with the provisions of this subpart.
  • (b) If you are an owner or operator of an area source subject to this subpart, you are exempt from the obligation to obtain a permit under 40 CFR part 70 or 71, provided you are not required to obtain a permit under 40 CFR 70.3(a) or 71.3(a) for a reason other than your status as an area source under this subpart. Notwithstanding the previous sentence, you must continue to comply with the provisions of this subpart applicable to area sources.
  • (f) If you are an owner or operator of an area source subject to this subpart, you are exempt from the obligation to obtain a permit under 40 CFR part 70 or part 71 as a result of this subpart. You may, however, be required to obtain a title V permit due to another reason or reasons. See 40 CFR 70.3(a) and (b) or 71.3(a) and (b). Notwithstanding the exemption from title V permitting for area sources under this subpart, you must continue to comply with the provisions of this subpart.
  • (d) You are exempt from the obligation to obtain a permit under 40 CFR part 70 or 71, provided you are not otherwise required by law to obtain a permit under 40 CFR 70.3(a) or 71.3(a). Notwithstanding the previous sentence, you must continue to comply with the provisions of this subpart.
  • (b) If you are an owner or operator of an area source subject to this subpart, you are exempt from the obligation to obtain a permit under 40 CFR part 70 or 71, provided you are not required to obtain a permit under 40 CFR 70.3(a) or 71.3(a) for a reason other than your status as an area source under this subpart. You must continue to comply with the provisions of this subpart applicable to area sources.
  • (b) If you are an owner or operator of an area source subject to this subpart, you are exempt from the obligation to obtain a permit under 40 CFR part 70 or 71, provided you are not required to obtain a permit under 40 CFR 70.3(a) or 71.3(a) for a reason other than your status as an area source under this subpart. Notwithstanding the previous sentence, you must continue to comply with the provisions of this subpart applicable to area sources.
  • (e) If you are an owner or operator of an area source subject to this subpart, you are exempt from the obligation to obtain a permit under 40 CFR part 70 or 71, provided you are not required to obtain a permit under 40 CFR 70.3(a) or 71.3(a) for a reason other than your status as an area source under this subpart. Notwithstanding the previous sentence, you must continue to comply with the provisions of this subpart applicable to area sources.
  • (k) If you are an owner or operator of an area source subject to this subpart, you are exempt from the obligation to obtain a permit under 40 CFR part 70 or 71, provided you are not required to obtain a permit under 40 CFR 70.3(a) or 71.3(a) for a reason other than your status as an area source under this subpart. Notwithstanding the previous sentence, you must continue to comply with the provisions of this subpart applicable to area sources.
  • (e) If you are an owner or operator of an area source subject to this subpart, you are exempt from the obligation to obtain a permit under 40 CFR part 70 or 71, provided you are not required to obtain a permit under 40 CFR 70.3(a) or 71.3(a) for a reason other than your status as an area source under this subpart. Notwithstanding the previous sentence, you must continue to comply with the provisions of this subpart applicable to area sources.
  • (i) If you are an owner or operator of an area source subject to this subpart, you are exempt from the obligation to obtain a permit under 40 CFR part 70 or 71, provided you are not required to obtain a permit under 40 CFR 70.3(a) or 71.3(a) for a reason other than your status as an area source under this subpart. Notwithstanding the previous sentence, you must continue to comply with the provisions of this subpart applicable to area sources.
  • (h) If you are an owner or operator of an area source subject to this subpart, you are exempt from the obligation to obtain a permit under 40 CFR part 70 or 71, provided you are not required to obtain a permit under 40 CFR 70.3(a) or 71.3(a) for a reason other than your status as an area source under this subpart. Notwithstanding the previous sentence, you must continue to comply with the provisions of this subpart applicable to area sources.
  • (iv) For particulate matter (PM-10) nonattainment areas classified or treated as classified as “Serious,” sources with the potential to emit 70 tpy or more of PM-10.
    Part 70 permit means any permit or group of permits covering a part 70 source that has been issued, renewed, amended or revised pursuant to 40 CFR part 70.
    Part 70 program or State program means a program approved by the Administrator under 40 CFR part 70.
    Part 70 source means any source subject to the permitting requirements of 40 CFR part 70, as provided in §§ 70.3(a) and 70.3(b).
    Part 71 permit, or permit (unless the context suggests otherwise) means any permit or group of permits covering a part 71 source that has been issued, renewed, amended or revised pursuant to this part.
    Part 71 program means a Federal operating permits program under this part.
    Part 71 source means any source subject to the permitting requirements of this part, as provided in §§ 71.3(a) and 71.3(b).
    Permit modification m eans a revision to a part 71 permit that meets the requirements of § 71.7(e).
    Permit program costs means all reasonable (direct and indirect) costs required to administer an operating permits program, as set forth in § 71.9(b).
    Permit revision means any permit modification or administrative permit amendment.
    Permitting authority means one of the following:

Citations to §71.3(b)

  • (iii) The engine that is otherwise portable or transportable remains or will remain at a location for more than 12 consecutive months or a shorter period of time for an engine located at a seasonal source. A location is any single site at a building, structure, facility, or installation. Any engine (or engines) that replaces an engine at a location and that is intended to perform the same or similar function as the engine replaced will be included in calculating the consecutive time period. An engine located at a seasonal source is an engine that remains at a seasonal source during the full annual operating period of the seasonal source. For purposes of this paragraph, a seasonal source is a stationary source that remains in a single location on a permanent basis (i.e., at least 2 years) and that operates at that single location approximately 3 months (or more) each year. This paragraph does not apply to an engine after the engine is removed from the location.
    Nonroad vehicle means a vehicle that is powered by a nonroad engine and that is not a motor vehicle or a vehicle used solely for competition.
    Oil-fired boiler means a furnace or boiler used for combusting fuel oil for the primary purpose of producing steam or hot water by heat transfer.
    Opacity means the degree to which emissions reduce the transmission of light and obscure the view of an object in the background. For continuous opacity monitoring systems, opacity means the fraction of incident light that is attenuated by an optical medium.
    Open burning means the burning of a material that results in the products of combustion being emitted directly into the atmosphere without passing through a stack. Open burning includes burning in burn barrels.
    Owner or operator means any person who owns, leases, operates, controls, or supervises an air pollution source.
    Part 71 source means any source subject to the permitting requirements of 40 CFR part 71, as provided in §§ 71.3(a) and 71.3(b).
    Particleboard means a matformed flat panel consisting of wood particles bonded together with synthetic resin or other suitable binder.
    Particulate matter means any airborne finely divided solid or liquid material, other than uncombined water. Particulate matter includes, but is not limited to, PM10 and PM2.5.
    Permit to construct or construction permit means a permit issued by the Regional Administrator pursuant to 40 CFR part 49 or 40 CFR part 52, or a permit issued by a Tribe pursuant to a program approved by the Administrator under 40 CFR part 51, subpart I, authorizing the construction or modification of a stationary source.
    Permit to operate or operating permit means a permit issued by the Regional Administrator pursuant to § 49.139 or 40 CFR part 71, or by a Tribe pursuant to a program approved by the Administrator under 40 CFR part 51 or 40 CFR part 70, authorizing the operation of a stationary source.
    Plywood means a flat panel built generally of an odd number of thin sheets of veneers of wood in which the grain direction of each ply or layer is at right angles to the one adjacent to it.
    PM10 means particulate matter with an aerodynamic diameter less than or equal to 10 micrometers.
    PM2.5 means particulate matter with an aerodynamic diameter less than or equal to 2.5 micrometers.
    Potential to emit means the maximum capacity of an air pollution source to emit an air pollutant under its physical and operational design. Any physical or operational limitation on the capacity of the air pollution source to emit an air pollutant, including air pollution control equipment and restrictions on hours of operation or on the type or amount of material combusted, stored, or processed, shall be treated as part of its design if the limitation or the effect it would have on emissions is Federally enforceable.
    Press/Cooling vent means any opening through which particulate and gaseous emissions from plywood, particleboard, or hardboard manufacturing are exhausted, either by natural draft or powered fan, from the building housing the process. Such openings are generally located immediately above the board press, board unloader, or board cooling area.
    Process source means an air pollution source using a procedure or combination of procedures for the purpose of causing a change in material by either chemical or physical means, excluding combustion.
    Rated capacity means the maximum sustainable capacity of the equipment.
    Reference method means any method of sampling and analyzing for an air pollutant as specified in the applicable section.
    Refuse means all solid, liquid, or gaseous waste material, including but not limited to, garbage, trash, household refuse, municipal solid waste, construction or demolition debris, or waste resulting from the operation of any business, trade, or industry.
    Regional Administrator means the Regional Administrator of EPA Region 10 or an authorized representative of the Regional Administrator.
    Residual fuel oil means any oil meeting the specifications of ASTM Grade 4, Grade 5, or Grade 6 fuel oils in ASTM Method D396-04, Standard Specification for Fuel Oils (incorporated by reference, see § 49.123(e)).
    Smudge pot means a portable heater/burner that produces thick heavy smoke and that fruit growers place around an orchard in the evening to prevent the crop from freezing at night.
    Solid fuel means wood, refuse, refuse-derived fuel, tires, tire-derived fuel, and other solid combustible material (other than coal), including any combination thereof.
    Solid fuel-fired boiler means a furnace or boiler used for combusting solid fuel for the primary purpose of producing steam or hot water by heat transfer.
    Soot blowing means using steam or compressed air to remove carbon from a furnace or from a boiler's heat transfer surfaces.
    Source means the same as air pollution source.
    Stack means any point in a source that conducts air pollutants to the atmosphere, including, but not limited to, a chimney, flue, conduit, pipe, vent, or duct, but not including a flare.
    Standard conditions means a temperature of 293 degrees Kelvin (68 degrees Fahrenheit, 20 degrees Celsius) and a pressure of 101.3 kilopascals (29.92 inches of mercury).
    Start-up means the setting into operation of a piece of equipment.
    Stationary source means any building, structure, facility, or installation that emits, or may emit, any air pollutant.
    Tempering oven means any facility used to bake hardboard following an oil treatment process.
    Uncombined water means droplets of water that have not combined with hygroscopic particles or do not contain dissolved solids.
    Used oil means petroleum products that have been recovered from another application.
    Veneer means a single flat panel of wood not exceeding 1/4 inch in thickness formed by slicing or peeling from a log.
    Veneer dryer means equipment in which veneer is dried.
    Visible emissions means air pollutants in sufficient amount to be observable to the human eye.
    Wood means wood, wood residue, bark, or any derivative or residue thereof, in any form, including but not limited to sawdust, sanderdust, wood chips, scraps, slabs, millings, shavings, and processed pellets made from wood or other forest residues.
    Wood-fired boiler means a furnace or boiler used for combusting wood for the primary purpose of producing steam or hot water by heat transfer.
    Wood-fired veneer dryer means a veneer dryer that is directly heated by the products of combustion of wood in addition to, or exclusive of, steam or natural gas or propane combustion.
    Woodwaste burner means a wigwam burner, teepee burner, silo burner, olivine burner, truncated cone burner, or other such woodwaste-burning device used by the wood products industry for the disposal of wood wastes.
  • (b) If your new unit subject to this subpart is subject to title V as a result of some triggering requirement(s) other than this subpart (for example, a unit subject to this subpart may be a major source or part of a major source), then your unit may be required to apply for a title V permit prior to the deadlines specified in paragraph (a) of this section. If more than one requirement triggers a source's obligation to apply for a title V permit, the 12-month timeframe for filing a title V permit application is triggered by the requirement that first causes the source to be subject to title V. (See section 503(c) of the Clean Air Act and 40 CFR 70.3(a) and (b), 40 CFR 70.5(a)(1)(i), 40 CFR 71.3(a) and (b), and 40 CFR 71.5(a)(1)(i).)
  • (b) If your existing unit is subject to title V as a result of some triggering requirement(s) other than those specified in paragraph (a) of this section (for example, a unit may be a major source or part of a major source), then your unit may be required to apply for a title V permit prior to the deadlines specified in paragraph (a) of this section. If more than one requirement triggers a source's obligation to apply for a title V permit, the 12-month timeframe for filing a title V permit application is triggered by the requirement which first causes the source to be subject to title V. (See section 503(c) of the Clean Air Act and 40 CFR 70.3(a) and (b), 40 CFR 70.5(a)(1)(i), 40 CFR 71.3(a) and (b), and 40 CFR 71.5(a)(1)(i).)
  • (b) If your new SSI unit subject to this subpart is subject to title V as a result of some triggering requirement(s) other than this subpart (for example, a unit subject to this subpart may be a major source or part of a major source), then your unit may be required to apply for a title V permit prior to the deadlines specified in paragraph (a) of this section. If more than one requirement triggers a source's obligation to apply for a title V permit, the 12-month timeframe for filing a title V permit application is triggered by the requirement that first causes the source to be subject to title V. (See section 503(c) of the Clean Air Act and 40 CFR 70.3(a) and (b), 40 CFR 70.5(a)(1)(i), 40 CFR 71.3(a) and (b), and 40 CFR 71.5(a)(1)(i).)
  • (c) If your existing unit is subject to title V as a result of some triggering requirement(s) other than those specified in paragraphs (a) and (b) of this section (for example, a unit may be a major source or part of a major source), then your unit may be required to apply for a title V permit prior to the deadlines specified in paragraphs (a) and (b). If more than one requirement triggers a source's obligation to apply for a title V permit, the 12-month timeframe for filing a title V permit application is triggered by the requirement which first causes the source to be subject to title V. (See section 503(c) of the Clean Air Act and 40 CFR 70.3(a) and (b), 40 CFR 70.5(a)(1)(i), 40 CFR 71.3(a) and (b), and 40 CFR 71.5(a)(1)(i).)
  • (e) You must comply with the requirements specified in § 62.15395 and § 62.15400 regarding title V permitting. If you comply with all of the requirements specified in paragraphs (a), (b), and (c) of this section, you are no longer subject to title V permitting requirements as a result of this subpart. You will remain subject to title V permitting requirements, however, if you are subject as a result of one or more of the applicability criteria in 40 CFR 70.3(a) and (b) or 71.3(a) and (b).
  • (a) You must submit a complete title V permit application within 12 months of when your source first becomes subject to a title V permitting program. See 40 CFR 70.3(a) and (b), 70.5(a)(1), 71.3(a) and (b), and 71.5(a)(1). As provided in section 503(c) of the Clean Air Act, permitting authorities may establish permit application deadlines earlier than the 12-month deadline.
  • (c) If your existing unit is subject to title V as a result of some triggering requirement(s) other than those specified in paragraphs (a) and (b) of this section (for example, a unit may be a major source or part of a major source), then your unit may be required to apply for a title V permit prior to the deadlines specified in paragraphs (a) and (b). If more than one requirement triggers a source's obligation to apply for a title V permit, the 12-month time frame for filing a title V permit application is triggered by the requirement which first causes the source to be subject to title V. (See section 503(c) of the Clean Air Act and 40 CFR 70.3(a) and (b), 70.5(a)(1)(i), 71.3(a) and (b), and 71.5(a)(1)(i).)
  • (f) If you are an owner or operator of an area source subject to this subpart, you are exempt from the obligation to obtain a permit under 40 CFR part 70 or part 71 as a result of this subpart. You may, however, be required to obtain a title V permit due to another reason or reasons. See 40 CFR 70.3(a) and (b) or 71.3(a) and (b). Notwithstanding the exemption from title V permitting for area sources under this subpart, you must continue to comply with the provisions of this subpart.
  • (iv) For particulate matter (PM-10) nonattainment areas classified or treated as classified as “Serious,” sources with the potential to emit 70 tpy or more of PM-10.
    Part 70 permit means any permit or group of permits covering a part 70 source that has been issued, renewed, amended or revised pursuant to 40 CFR part 70.
    Part 70 program or State program means a program approved by the Administrator under 40 CFR part 70.
    Part 70 source means any source subject to the permitting requirements of 40 CFR part 70, as provided in §§ 70.3(a) and 70.3(b).
    Part 71 permit, or permit (unless the context suggests otherwise) means any permit or group of permits covering a part 71 source that has been issued, renewed, amended or revised pursuant to this part.
    Part 71 program means a Federal operating permits program under this part.
    Part 71 source means any source subject to the permitting requirements of this part, as provided in §§ 71.3(a) and 71.3(b).
    Permit modification m eans a revision to a part 71 permit that meets the requirements of § 71.7(e).
    Permit program costs means all reasonable (direct and indirect) costs required to administer an operating permits program, as set forth in § 71.9(b).
    Permit revision means any permit modification or administrative permit amendment.
    Permitting authority means one of the following: