§68.77. Pre-startup review.
40 C.F.R. § 68.77
The owner or operator shall perform a pre-startup safety review for new stationary sources and for modified stationary sources when the modification is significant enough to require a change in the process safety information.
The pre-startup safety review shall confirm that prior to the introduction of regulated substances to a process:
Construction and equipment is in accordance with design specifications;
Safety, operating, maintenance, and emergency procedures are in place and are adequate;
For new stationary sources, a process hazard analysis has been performed and recommendations have been resolved or implemented before startup; and modified stationary sources meet the requirements contained in management of change, § 68.75.
Training of each employee involved in operating a process has been completed.
Notes, amendments, and revision history
Source
Source: 61 FR 31722, June 20, 1996, unless otherwise noted.
Authority
Authority: 42 U.S.C. 7412(r), 7601(a)(1), 7661-7661f.
Source
Source: 59 FR 4493, Jan. 31, 1994, unless otherwise noted.