§65.7. Monitoring, recordkeeping, and reporting waivers and alternatives, and alternative work practice for equipment leaks. — Inbound Citations
40 C.F.R. § 65.7
Statutory Authority
Cited by 30 regulations in release Current.
Citations to 40 C.F.R. § 65.7 as a whole
-
(3) Determination of whether acceptable operation and maintenance procedures are being used will be based on information available to the Administrator that may include, but is not limited to, monitoring results, review of operation and maintenance procedures (including the startup, shutdown, and malfunction plan, if applicable, required in § 65.6(a), as applicable), review of operation and maintenance records, inspection of the regulated source, and alternatives approved as specified in § 65.7.
Citations to §65.7(b)
-
-
(5) An owner or operator may request approval to use other alternative monitoring and recordkeeping systems as specified in § 65.7(b). The application shall contain a description of the proposed alternative system. In addition, the application shall include information justifying the owner or operator's request for an alternative monitoring method, such as the technical or economic infeasibility, or the impracticality, of the regulated source using the required method.
-
(vi) To use an alternative method to demonstrate daily instrument checks, apply to the Administrator for approval of the alternative under § 65.7(b).
Citations to §65.7(c)
-
-
(2) The provisions in § 65.7(c) shall govern the review and approval of requests.
Citations to §65.7(d)
Citations to §65.7(e)
-
(b) An owner or operator may submit a written request for approval to use alternatives to the monitoring or recordkeeping provisions of this part. For process vents and transfer racks, except low-throughput transfer racks, the provisions in paragraph (c) of this section shall govern the review and approval of requests. In addition, the application shall include information justifying the owner or operator's request for an alternative monitoring or recordkeeping method, such as the technical or economic infeasibility, or the impracticality, of the regulated source using the required method. For storage vessels and low throughput transfer racks, owners and operators shall comply with the requirements of § 65.145(b) for preparing and submitting a design evaluation. For equipment leaks, owners and operators shall comply with the recordkeeping requirements of § 65.163(d). Owners and operators are also provided the option of complying with an alternative work practice for monitoring leaking equipment in § 65.7 (e), (f), and (g) rather than monitoring equipment with a 40 CFR part 60, appendix A-7, Method 21 monitor.
Citations to §65.7(e)(1)
-
(e) This section contains requirements for an alternative work practice used to identify leaking equipment. This alternative work practice is placed here for administrative convenience and is available to all subparts in 40 CFR parts 60, 61, 63, and 65 that require monitoring of equipment with a 40 CFR part 60, appendix A-7, Method 21 monitor. Paragraphs (e), (f), and (g) of this section apply to all equipment for which the applicable subpart requires monitoring with a 40 CFR part 60, appendix A-7, Method 21 monitor, except for closed vent systems, equipment designated as leakless, and equipment identified in the applicable subpart as having no detectable emissions, as indicated by an instrument reading of less than 500 ppm above background. An owner or operator may use an optical gas imaging instrument instead of a 40 CFR part 60, appendix A-7, Method 21 monitor. Requirements in the existing subparts that are specific to the Method 21 instrument do not apply under this section. All other requirements in the applicable subpart that are not addressed in paragraphs (e), (f), and (g) of this section continue to apply. For example, equipment specification requirements, and non-Method 21 instrument recordkeeping and reporting requirements in the applicable subpart continue to apply. The terms defined in paragraphs (e)(1) through (5) of this section have meanings that are specific to the alternative work practice standard in paragraphs (e), (f), and (g) of this section.(1) Applicable subpart means the subpart in 40 CFR parts 60, 61, 63, and 65 that requires monitoring of each piece of equipment with a 40 CFR part 60, appendix A-7, Method 21 monitor.(2) Equipment means pumps, valves, pressure relief valves, compressors, open-ended lines, flanges, connectors, and other equipment covered by the applicable subpart that require monitoring with a 40 CFR part 60, appendix A-7, Method 21 monitor.(3) Imaging means making visible emissions that may otherwise be invisible to the naked eye.(4) Optical gas imaging instrument means an instrument that makes visible emissions that may otherwise be invisible to the naked eye.(5) Repair means that equipment is adjusted, or otherwise altered, in order to eliminate a leak.(6) means:(i) Any emissions imaged by the optical gas instrument;(ii) Indications of liquids dripping;(iii) Indications by a sensor that a seal or barrier fluid system has failed; or(iv) Screening results using a 40 CFR part 60, appendix A-7, Method 21 monitor that exceed the leak definition in the applicable subpart to which the equipment is subject.
Citations to §65.7(e)(2)
-
(e) This section contains requirements for an alternative work practice used to identify leaking equipment. This alternative work practice is placed here for administrative convenience and is available to all subparts in 40 CFR parts 60, 61, 63, and 65 that require monitoring of equipment with a 40 CFR part 60, appendix A-7, Method 21 monitor. Paragraphs (e), (f), and (g) of this section apply to all equipment for which the applicable subpart requires monitoring with a 40 CFR part 60, appendix A-7, Method 21 monitor, except for closed vent systems, equipment designated as leakless, and equipment identified in the applicable subpart as having no detectable emissions, as indicated by an instrument reading of less than 500 ppm above background. An owner or operator may use an optical gas imaging instrument instead of a 40 CFR part 60, appendix A-7, Method 21 monitor. Requirements in the existing subparts that are specific to the Method 21 instrument do not apply under this section. All other requirements in the applicable subpart that are not addressed in paragraphs (e), (f), and (g) of this section continue to apply. For example, equipment specification requirements, and non-Method 21 instrument recordkeeping and reporting requirements in the applicable subpart continue to apply. The terms defined in paragraphs (e)(1) through (5) of this section have meanings that are specific to the alternative work practice standard in paragraphs (e), (f), and (g) of this section.(1) Applicable subpart means the subpart in 40 CFR parts 60, 61, 63, and 65 that requires monitoring of each piece of equipment with a 40 CFR part 60, appendix A-7, Method 21 monitor.(2) Equipment means pumps, valves, pressure relief valves, compressors, open-ended lines, flanges, connectors, and other equipment covered by the applicable subpart that require monitoring with a 40 CFR part 60, appendix A-7, Method 21 monitor.(3) Imaging means making visible emissions that may otherwise be invisible to the naked eye.(4) Optical gas imaging instrument means an instrument that makes visible emissions that may otherwise be invisible to the naked eye.(5) Repair means that equipment is adjusted, or otherwise altered, in order to eliminate a leak.(6) means:(i) Any emissions imaged by the optical gas instrument;(ii) Indications of liquids dripping;(iii) Indications by a sensor that a seal or barrier fluid system has failed; or(iv) Screening results using a 40 CFR part 60, appendix A-7, Method 21 monitor that exceed the leak definition in the applicable subpart to which the equipment is subject.
Citations to §65.7(e)(3)
-
(e) This section contains requirements for an alternative work practice used to identify leaking equipment. This alternative work practice is placed here for administrative convenience and is available to all subparts in 40 CFR parts 60, 61, 63, and 65 that require monitoring of equipment with a 40 CFR part 60, appendix A-7, Method 21 monitor. Paragraphs (e), (f), and (g) of this section apply to all equipment for which the applicable subpart requires monitoring with a 40 CFR part 60, appendix A-7, Method 21 monitor, except for closed vent systems, equipment designated as leakless, and equipment identified in the applicable subpart as having no detectable emissions, as indicated by an instrument reading of less than 500 ppm above background. An owner or operator may use an optical gas imaging instrument instead of a 40 CFR part 60, appendix A-7, Method 21 monitor. Requirements in the existing subparts that are specific to the Method 21 instrument do not apply under this section. All other requirements in the applicable subpart that are not addressed in paragraphs (e), (f), and (g) of this section continue to apply. For example, equipment specification requirements, and non-Method 21 instrument recordkeeping and reporting requirements in the applicable subpart continue to apply. The terms defined in paragraphs (e)(1) through (5) of this section have meanings that are specific to the alternative work practice standard in paragraphs (e), (f), and (g) of this section.(1) Applicable subpart means the subpart in 40 CFR parts 60, 61, 63, and 65 that requires monitoring of each piece of equipment with a 40 CFR part 60, appendix A-7, Method 21 monitor.(2) Equipment means pumps, valves, pressure relief valves, compressors, open-ended lines, flanges, connectors, and other equipment covered by the applicable subpart that require monitoring with a 40 CFR part 60, appendix A-7, Method 21 monitor.(3) Imaging means making visible emissions that may otherwise be invisible to the naked eye.(4) Optical gas imaging instrument means an instrument that makes visible emissions that may otherwise be invisible to the naked eye.(5) Repair means that equipment is adjusted, or otherwise altered, in order to eliminate a leak.(6) means:(i) Any emissions imaged by the optical gas instrument;(ii) Indications of liquids dripping;(iii) Indications by a sensor that a seal or barrier fluid system has failed; or(iv) Screening results using a 40 CFR part 60, appendix A-7, Method 21 monitor that exceed the leak definition in the applicable subpart to which the equipment is subject.
Citations to §65.7(e)(4)
-
(e) This section contains requirements for an alternative work practice used to identify leaking equipment. This alternative work practice is placed here for administrative convenience and is available to all subparts in 40 CFR parts 60, 61, 63, and 65 that require monitoring of equipment with a 40 CFR part 60, appendix A-7, Method 21 monitor. Paragraphs (e), (f), and (g) of this section apply to all equipment for which the applicable subpart requires monitoring with a 40 CFR part 60, appendix A-7, Method 21 monitor, except for closed vent systems, equipment designated as leakless, and equipment identified in the applicable subpart as having no detectable emissions, as indicated by an instrument reading of less than 500 ppm above background. An owner or operator may use an optical gas imaging instrument instead of a 40 CFR part 60, appendix A-7, Method 21 monitor. Requirements in the existing subparts that are specific to the Method 21 instrument do not apply under this section. All other requirements in the applicable subpart that are not addressed in paragraphs (e), (f), and (g) of this section continue to apply. For example, equipment specification requirements, and non-Method 21 instrument recordkeeping and reporting requirements in the applicable subpart continue to apply. The terms defined in paragraphs (e)(1) through (5) of this section have meanings that are specific to the alternative work practice standard in paragraphs (e), (f), and (g) of this section.(1) Applicable subpart means the subpart in 40 CFR parts 60, 61, 63, and 65 that requires monitoring of each piece of equipment with a 40 CFR part 60, appendix A-7, Method 21 monitor.(2) Equipment means pumps, valves, pressure relief valves, compressors, open-ended lines, flanges, connectors, and other equipment covered by the applicable subpart that require monitoring with a 40 CFR part 60, appendix A-7, Method 21 monitor.(3) Imaging means making visible emissions that may otherwise be invisible to the naked eye.(4) Optical gas imaging instrument means an instrument that makes visible emissions that may otherwise be invisible to the naked eye.(5) Repair means that equipment is adjusted, or otherwise altered, in order to eliminate a leak.(6) means:(i) Any emissions imaged by the optical gas instrument;(ii) Indications of liquids dripping;(iii) Indications by a sensor that a seal or barrier fluid system has failed; or(iv) Screening results using a 40 CFR part 60, appendix A-7, Method 21 monitor that exceed the leak definition in the applicable subpart to which the equipment is subject.
Citations to §65.7(e)(5)
-
(e) This section contains requirements for an alternative work practice used to identify leaking equipment. This alternative work practice is placed here for administrative convenience and is available to all subparts in 40 CFR parts 60, 61, 63, and 65 that require monitoring of equipment with a 40 CFR part 60, appendix A-7, Method 21 monitor. Paragraphs (e), (f), and (g) of this section apply to all equipment for which the applicable subpart requires monitoring with a 40 CFR part 60, appendix A-7, Method 21 monitor, except for closed vent systems, equipment designated as leakless, and equipment identified in the applicable subpart as having no detectable emissions, as indicated by an instrument reading of less than 500 ppm above background. An owner or operator may use an optical gas imaging instrument instead of a 40 CFR part 60, appendix A-7, Method 21 monitor. Requirements in the existing subparts that are specific to the Method 21 instrument do not apply under this section. All other requirements in the applicable subpart that are not addressed in paragraphs (e), (f), and (g) of this section continue to apply. For example, equipment specification requirements, and non-Method 21 instrument recordkeeping and reporting requirements in the applicable subpart continue to apply. The terms defined in paragraphs (e)(1) through (5) of this section have meanings that are specific to the alternative work practice standard in paragraphs (e), (f), and (g) of this section.(1) Applicable subpart means the subpart in 40 CFR parts 60, 61, 63, and 65 that requires monitoring of each piece of equipment with a 40 CFR part 60, appendix A-7, Method 21 monitor.(2) Equipment means pumps, valves, pressure relief valves, compressors, open-ended lines, flanges, connectors, and other equipment covered by the applicable subpart that require monitoring with a 40 CFR part 60, appendix A-7, Method 21 monitor.(3) Imaging means making visible emissions that may otherwise be invisible to the naked eye.(4) Optical gas imaging instrument means an instrument that makes visible emissions that may otherwise be invisible to the naked eye.(5) Repair means that equipment is adjusted, or otherwise altered, in order to eliminate a leak.(6) means:(i) Any emissions imaged by the optical gas instrument;(ii) Indications of liquids dripping;(iii) Indications by a sensor that a seal or barrier fluid system has failed; or(iv) Screening results using a 40 CFR part 60, appendix A-7, Method 21 monitor that exceed the leak definition in the applicable subpart to which the equipment is subject.
Citations to §65.7(f)
-
(b) An owner or operator may submit a written request for approval to use alternatives to the monitoring or recordkeeping provisions of this part. For process vents and transfer racks, except low-throughput transfer racks, the provisions in paragraph (c) of this section shall govern the review and approval of requests. In addition, the application shall include information justifying the owner or operator's request for an alternative monitoring or recordkeeping method, such as the technical or economic infeasibility, or the impracticality, of the regulated source using the required method. For storage vessels and low throughput transfer racks, owners and operators shall comply with the requirements of § 65.145(b) for preparing and submitting a design evaluation. For equipment leaks, owners and operators shall comply with the recordkeeping requirements of § 65.163(d). Owners and operators are also provided the option of complying with an alternative work practice for monitoring leaking equipment in § 65.7 (e), (f), and (g) rather than monitoring equipment with a 40 CFR part 60, appendix A-7, Method 21 monitor.
Citations to §65.7(g)
-
(b) An owner or operator may submit a written request for approval to use alternatives to the monitoring or recordkeeping provisions of this part. For process vents and transfer racks, except low-throughput transfer racks, the provisions in paragraph (c) of this section shall govern the review and approval of requests. In addition, the application shall include information justifying the owner or operator's request for an alternative monitoring or recordkeeping method, such as the technical or economic infeasibility, or the impracticality, of the regulated source using the required method. For storage vessels and low throughput transfer racks, owners and operators shall comply with the requirements of § 65.145(b) for preparing and submitting a design evaluation. For equipment leaks, owners and operators shall comply with the recordkeeping requirements of § 65.163(d). Owners and operators are also provided the option of complying with an alternative work practice for monitoring leaking equipment in § 65.7 (e), (f), and (g) rather than monitoring equipment with a 40 CFR part 60, appendix A-7, Method 21 monitor.
Citations to §65.7(g)(1)
-
(g) An owner or operator of an affected source who chooses to use the alternative work practice must comply with the requirements of paragraphs (g)(1) through (g)(5) of this section.(1) The optical gas imaging instrument must comply with the requirements specified in paragraphs (g)(1)(i) and (g)(1)(ii) of this section.(i) Provide the operator with an image of the potential leak points for each piece of equipment at both the detection sensitivity level and within the distance used in the daily instrument check described in paragraph (g)(2) of this section. The detection sensitivity level depends upon the frequency at which leak monitoring is to be performed.(2) On a daily basis, and prior to beginning any leak monitoring work, test the optical gas imaging instrument at the mass flow rate determined in paragraph (g)(2)(i) of this section in accordance with the procedure specified in paragraphs (g)(2)(ii) through (g)(2)(iv) of this section for each camera configuration used during monitoring (for example, different lenses used), unless an alternative method to demonstrate daily instrument checks has been approved in accordance with paragraph (g)(2)(v) of this section.(i) Calculate the mass flow rate to be used in the daily instrument check by following the procedures in paragraphs (g)(2)(i)(A) and (g)(2)(i)(B) of this section.(A) For a specified population of equipment to be imaged by the instrument, determine the piece of equipment in contact with the lowest mass fraction of chemicals that are detectable, within the distance to be used in paragraph (g)(2)(iv)(B) of this section, at or below the standard detection sensitivity level.(B) Multiply the standard detection sensitivity level, corresponding to the selected monitoring frequency in Table 3 of subpart A of this part, by the mass fraction of detectable chemicals from the stream identified in paragraph (g)(2)(i)(A) of this section to determine the mass flow rate to be used in the daily instrument check, using the following equation.(ii) Start the optical gas imaging instrument according to the manufacturer's instructions, ensuring that all appropriate settings conform to the manufacturer's instructions.(iii) Use any gas chosen by the user that can be viewed by the optical gas imaging instrument and that has a purity of no less than 98 percent.(A) Provide a source of gas where it will be in the field of view of the optical gas imaging instrument.(B) Set up the optical gas imaging instrument at a recorded distance from the outlet or leak orifice of the flow meter that will not be exceeded in the actual performance of the leak survey. Do not exceed the operating parameters of the flow meter.(C) Open the valve on the flow meter to set a flow rate that will create a mass emission rate equal to the mass rate calculated in paragraph (g)(2)(i) of this section while observing the gas flow through the optical gas imaging instrument viewfinder. When an image of the gas emission is seen through the viewfinder at the required emission rate, make a record of the reading on the flow meter.(v) Repeat the procedures specified in paragraphs (g)(2)(ii) through (g)(2)(iv) of this section for each configuration of the optical gas imaging instrument used during the leak survey.(vi) To use an alternative method to demonstrate daily instrument checks, apply to the Administrator for approval of the alternative under § 65.7(b).(3) Operate the optical gas imaging instrument to image every regulated piece of equipment selected for this work practice in accordance with the instrument manufacturer's operating parameters. All emissions imaged by the optical gas imaging instrument are considered to be leaks and are subject to repair. All emissions visible to the naked eye are also considered to be leaks and are subject to repair.(4) Keep the records described in paragraphs (g)(4)(i) through (g)(4)(vii) of this section:(i) The equipment, processes, and facilities for which the owner or operator chooses to use the alternative work practice.(ii) The detection sensitivity level selected from Table 3 to subpart A of this part for the optical gas imaging instrument.(iii) The analysis to determine the piece of equipment in contact with the lowest mass fraction of chemicals that are detectable, as specified in paragraph (g)(2)(i)(A) of this section.(iv) The technical basis for the mass fraction of detectable chemicals used in the equation in paragraph (g)(2)(i)(B) of this section.(v) Record the distance, per paragraph (g)(2)(iv)(B) of this section, and the flow meter reading, per paragraph (g)(2)(iv)(C) of this section, at which the leak was imaged. Keep a video record of the daily instrument check for each configuration of the optical gas imaging instrument used during the leak survey (for example, the daily instrument check must be conducted for each lens used). The video record must include a time and date stamp for each daily instrument check. The video record must be kept for 5 years.(vi) A video record must be used to document the leak survey results. The video record must include a time and date stamp for each monitoring event. A video record can be used to meet the recordkeeping requirements of the applicable subparts if each piece of regulated equipment selected for this work practice can be identified in the video record. The video record must be kept for 5 years.(vii) Records must be kept for all regulated equipment specified in paragraph (f)(1) of this section. Records must identify the equipment screened, the screening value measured by Method 21, the time and date of the screening, and calibration information required in the existing applicable subparts.(5) Submit the reports required in the applicable subpart. Submit the records of the annual Method 21 screening required in paragraph (f)(7) of this section to the Administrator via e-mail to [email protected].
Citations to §65.7(g)(2)
-
(g) An owner or operator of an affected source who chooses to use the alternative work practice must comply with the requirements of paragraphs (g)(1) through (g)(5) of this section.(1) The optical gas imaging instrument must comply with the requirements specified in paragraphs (g)(1)(i) and (g)(1)(ii) of this section.(i) Provide the operator with an image of the potential leak points for each piece of equipment at both the detection sensitivity level and within the distance used in the daily instrument check described in paragraph (g)(2) of this section. The detection sensitivity level depends upon the frequency at which leak monitoring is to be performed.(2) On a daily basis, and prior to beginning any leak monitoring work, test the optical gas imaging instrument at the mass flow rate determined in paragraph (g)(2)(i) of this section in accordance with the procedure specified in paragraphs (g)(2)(ii) through (g)(2)(iv) of this section for each camera configuration used during monitoring (for example, different lenses used), unless an alternative method to demonstrate daily instrument checks has been approved in accordance with paragraph (g)(2)(v) of this section.(i) Calculate the mass flow rate to be used in the daily instrument check by following the procedures in paragraphs (g)(2)(i)(A) and (g)(2)(i)(B) of this section.(A) For a specified population of equipment to be imaged by the instrument, determine the piece of equipment in contact with the lowest mass fraction of chemicals that are detectable, within the distance to be used in paragraph (g)(2)(iv)(B) of this section, at or below the standard detection sensitivity level.(B) Multiply the standard detection sensitivity level, corresponding to the selected monitoring frequency in Table 3 of subpart A of this part, by the mass fraction of detectable chemicals from the stream identified in paragraph (g)(2)(i)(A) of this section to determine the mass flow rate to be used in the daily instrument check, using the following equation.(ii) Start the optical gas imaging instrument according to the manufacturer's instructions, ensuring that all appropriate settings conform to the manufacturer's instructions.(iii) Use any gas chosen by the user that can be viewed by the optical gas imaging instrument and that has a purity of no less than 98 percent.(A) Provide a source of gas where it will be in the field of view of the optical gas imaging instrument.(B) Set up the optical gas imaging instrument at a recorded distance from the outlet or leak orifice of the flow meter that will not be exceeded in the actual performance of the leak survey. Do not exceed the operating parameters of the flow meter.(C) Open the valve on the flow meter to set a flow rate that will create a mass emission rate equal to the mass rate calculated in paragraph (g)(2)(i) of this section while observing the gas flow through the optical gas imaging instrument viewfinder. When an image of the gas emission is seen through the viewfinder at the required emission rate, make a record of the reading on the flow meter.(v) Repeat the procedures specified in paragraphs (g)(2)(ii) through (g)(2)(iv) of this section for each configuration of the optical gas imaging instrument used during the leak survey.(vi) To use an alternative method to demonstrate daily instrument checks, apply to the Administrator for approval of the alternative under § 65.7(b).(3) Operate the optical gas imaging instrument to image every regulated piece of equipment selected for this work practice in accordance with the instrument manufacturer's operating parameters. All emissions imaged by the optical gas imaging instrument are considered to be leaks and are subject to repair. All emissions visible to the naked eye are also considered to be leaks and are subject to repair.(4) Keep the records described in paragraphs (g)(4)(i) through (g)(4)(vii) of this section:(i) The equipment, processes, and facilities for which the owner or operator chooses to use the alternative work practice.(ii) The detection sensitivity level selected from Table 3 to subpart A of this part for the optical gas imaging instrument.(iii) The analysis to determine the piece of equipment in contact with the lowest mass fraction of chemicals that are detectable, as specified in paragraph (g)(2)(i)(A) of this section.(iv) The technical basis for the mass fraction of detectable chemicals used in the equation in paragraph (g)(2)(i)(B) of this section.(v) Record the distance, per paragraph (g)(2)(iv)(B) of this section, and the flow meter reading, per paragraph (g)(2)(iv)(C) of this section, at which the leak was imaged. Keep a video record of the daily instrument check for each configuration of the optical gas imaging instrument used during the leak survey (for example, the daily instrument check must be conducted for each lens used). The video record must include a time and date stamp for each daily instrument check. The video record must be kept for 5 years.(vi) A video record must be used to document the leak survey results. The video record must include a time and date stamp for each monitoring event. A video record can be used to meet the recordkeeping requirements of the applicable subparts if each piece of regulated equipment selected for this work practice can be identified in the video record. The video record must be kept for 5 years.(vii) Records must be kept for all regulated equipment specified in paragraph (f)(1) of this section. Records must identify the equipment screened, the screening value measured by Method 21, the time and date of the screening, and calibration information required in the existing applicable subparts.(5) Submit the reports required in the applicable subpart. Submit the records of the annual Method 21 screening required in paragraph (f)(7) of this section to the Administrator via e-mail to [email protected].
Citations to §65.7(g)(2)(ii)
-
(2) On a daily basis, and prior to beginning any leak monitoring work, test the optical gas imaging instrument at the mass flow rate determined in paragraph (g)(2)(i) of this section in accordance with the procedure specified in paragraphs (g)(2)(ii) through (g)(2)(iv) of this section for each camera configuration used during monitoring (for example, different lenses used), unless an alternative method to demonstrate daily instrument checks has been approved in accordance with paragraph (g)(2)(v) of this section.(i) Calculate the mass flow rate to be used in the daily instrument check by following the procedures in paragraphs (g)(2)(i)(A) and (g)(2)(i)(B) of this section.(A) For a specified population of equipment to be imaged by the instrument, determine the piece of equipment in contact with the lowest mass fraction of chemicals that are detectable, within the distance to be used in paragraph (g)(2)(iv)(B) of this section, at or below the standard detection sensitivity level.(B) Multiply the standard detection sensitivity level, corresponding to the selected monitoring frequency in Table 3 of subpart A of this part, by the mass fraction of detectable chemicals from the stream identified in paragraph (g)(2)(i)(A) of this section to determine the mass flow rate to be used in the daily instrument check, using the following equation.(ii) Start the optical gas imaging instrument according to the manufacturer's instructions, ensuring that all appropriate settings conform to the manufacturer's instructions.(iii) Use any gas chosen by the user that can be viewed by the optical gas imaging instrument and that has a purity of no less than 98 percent.(A) Provide a source of gas where it will be in the field of view of the optical gas imaging instrument.(B) Set up the optical gas imaging instrument at a recorded distance from the outlet or leak orifice of the flow meter that will not be exceeded in the actual performance of the leak survey. Do not exceed the operating parameters of the flow meter.(C) Open the valve on the flow meter to set a flow rate that will create a mass emission rate equal to the mass rate calculated in paragraph (g)(2)(i) of this section while observing the gas flow through the optical gas imaging instrument viewfinder. When an image of the gas emission is seen through the viewfinder at the required emission rate, make a record of the reading on the flow meter.(v) Repeat the procedures specified in paragraphs (g)(2)(ii) through (g)(2)(iv) of this section for each configuration of the optical gas imaging instrument used during the leak survey.(vi) To use an alternative method to demonstrate daily instrument checks, apply to the Administrator for approval of the alternative under § 65.7(b).
Citations to §65.7(g)(2)(iii)
-
(2) On a daily basis, and prior to beginning any leak monitoring work, test the optical gas imaging instrument at the mass flow rate determined in paragraph (g)(2)(i) of this section in accordance with the procedure specified in paragraphs (g)(2)(ii) through (g)(2)(iv) of this section for each camera configuration used during monitoring (for example, different lenses used), unless an alternative method to demonstrate daily instrument checks has been approved in accordance with paragraph (g)(2)(v) of this section.(i) Calculate the mass flow rate to be used in the daily instrument check by following the procedures in paragraphs (g)(2)(i)(A) and (g)(2)(i)(B) of this section.(A) For a specified population of equipment to be imaged by the instrument, determine the piece of equipment in contact with the lowest mass fraction of chemicals that are detectable, within the distance to be used in paragraph (g)(2)(iv)(B) of this section, at or below the standard detection sensitivity level.(B) Multiply the standard detection sensitivity level, corresponding to the selected monitoring frequency in Table 3 of subpart A of this part, by the mass fraction of detectable chemicals from the stream identified in paragraph (g)(2)(i)(A) of this section to determine the mass flow rate to be used in the daily instrument check, using the following equation.(ii) Start the optical gas imaging instrument according to the manufacturer's instructions, ensuring that all appropriate settings conform to the manufacturer's instructions.(iii) Use any gas chosen by the user that can be viewed by the optical gas imaging instrument and that has a purity of no less than 98 percent.(A) Provide a source of gas where it will be in the field of view of the optical gas imaging instrument.(B) Set up the optical gas imaging instrument at a recorded distance from the outlet or leak orifice of the flow meter that will not be exceeded in the actual performance of the leak survey. Do not exceed the operating parameters of the flow meter.(C) Open the valve on the flow meter to set a flow rate that will create a mass emission rate equal to the mass rate calculated in paragraph (g)(2)(i) of this section while observing the gas flow through the optical gas imaging instrument viewfinder. When an image of the gas emission is seen through the viewfinder at the required emission rate, make a record of the reading on the flow meter.(v) Repeat the procedures specified in paragraphs (g)(2)(ii) through (g)(2)(iv) of this section for each configuration of the optical gas imaging instrument used during the leak survey.(vi) To use an alternative method to demonstrate daily instrument checks, apply to the Administrator for approval of the alternative under § 65.7(b).
Citations to §65.7(g)(2)(iv)
-
(2) On a daily basis, and prior to beginning any leak monitoring work, test the optical gas imaging instrument at the mass flow rate determined in paragraph (g)(2)(i) of this section in accordance with the procedure specified in paragraphs (g)(2)(ii) through (g)(2)(iv) of this section for each camera configuration used during monitoring (for example, different lenses used), unless an alternative method to demonstrate daily instrument checks has been approved in accordance with paragraph (g)(2)(v) of this section.(i) Calculate the mass flow rate to be used in the daily instrument check by following the procedures in paragraphs (g)(2)(i)(A) and (g)(2)(i)(B) of this section.(A) For a specified population of equipment to be imaged by the instrument, determine the piece of equipment in contact with the lowest mass fraction of chemicals that are detectable, within the distance to be used in paragraph (g)(2)(iv)(B) of this section, at or below the standard detection sensitivity level.(B) Multiply the standard detection sensitivity level, corresponding to the selected monitoring frequency in Table 3 of subpart A of this part, by the mass fraction of detectable chemicals from the stream identified in paragraph (g)(2)(i)(A) of this section to determine the mass flow rate to be used in the daily instrument check, using the following equation.(ii) Start the optical gas imaging instrument according to the manufacturer's instructions, ensuring that all appropriate settings conform to the manufacturer's instructions.(iii) Use any gas chosen by the user that can be viewed by the optical gas imaging instrument and that has a purity of no less than 98 percent.(A) Provide a source of gas where it will be in the field of view of the optical gas imaging instrument.(B) Set up the optical gas imaging instrument at a recorded distance from the outlet or leak orifice of the flow meter that will not be exceeded in the actual performance of the leak survey. Do not exceed the operating parameters of the flow meter.(C) Open the valve on the flow meter to set a flow rate that will create a mass emission rate equal to the mass rate calculated in paragraph (g)(2)(i) of this section while observing the gas flow through the optical gas imaging instrument viewfinder. When an image of the gas emission is seen through the viewfinder at the required emission rate, make a record of the reading on the flow meter.(v) Repeat the procedures specified in paragraphs (g)(2)(ii) through (g)(2)(iv) of this section for each configuration of the optical gas imaging instrument used during the leak survey.(vi) To use an alternative method to demonstrate daily instrument checks, apply to the Administrator for approval of the alternative under § 65.7(b).
Citations to §65.7(g)(3)
-
(g) An owner or operator of an affected source who chooses to use the alternative work practice must comply with the requirements of paragraphs (g)(1) through (g)(5) of this section.(1) The optical gas imaging instrument must comply with the requirements specified in paragraphs (g)(1)(i) and (g)(1)(ii) of this section.(i) Provide the operator with an image of the potential leak points for each piece of equipment at both the detection sensitivity level and within the distance used in the daily instrument check described in paragraph (g)(2) of this section. The detection sensitivity level depends upon the frequency at which leak monitoring is to be performed.(2) On a daily basis, and prior to beginning any leak monitoring work, test the optical gas imaging instrument at the mass flow rate determined in paragraph (g)(2)(i) of this section in accordance with the procedure specified in paragraphs (g)(2)(ii) through (g)(2)(iv) of this section for each camera configuration used during monitoring (for example, different lenses used), unless an alternative method to demonstrate daily instrument checks has been approved in accordance with paragraph (g)(2)(v) of this section.(i) Calculate the mass flow rate to be used in the daily instrument check by following the procedures in paragraphs (g)(2)(i)(A) and (g)(2)(i)(B) of this section.(A) For a specified population of equipment to be imaged by the instrument, determine the piece of equipment in contact with the lowest mass fraction of chemicals that are detectable, within the distance to be used in paragraph (g)(2)(iv)(B) of this section, at or below the standard detection sensitivity level.(B) Multiply the standard detection sensitivity level, corresponding to the selected monitoring frequency in Table 3 of subpart A of this part, by the mass fraction of detectable chemicals from the stream identified in paragraph (g)(2)(i)(A) of this section to determine the mass flow rate to be used in the daily instrument check, using the following equation.(ii) Start the optical gas imaging instrument according to the manufacturer's instructions, ensuring that all appropriate settings conform to the manufacturer's instructions.(iii) Use any gas chosen by the user that can be viewed by the optical gas imaging instrument and that has a purity of no less than 98 percent.(A) Provide a source of gas where it will be in the field of view of the optical gas imaging instrument.(B) Set up the optical gas imaging instrument at a recorded distance from the outlet or leak orifice of the flow meter that will not be exceeded in the actual performance of the leak survey. Do not exceed the operating parameters of the flow meter.(C) Open the valve on the flow meter to set a flow rate that will create a mass emission rate equal to the mass rate calculated in paragraph (g)(2)(i) of this section while observing the gas flow through the optical gas imaging instrument viewfinder. When an image of the gas emission is seen through the viewfinder at the required emission rate, make a record of the reading on the flow meter.(v) Repeat the procedures specified in paragraphs (g)(2)(ii) through (g)(2)(iv) of this section for each configuration of the optical gas imaging instrument used during the leak survey.(vi) To use an alternative method to demonstrate daily instrument checks, apply to the Administrator for approval of the alternative under § 65.7(b).(3) Operate the optical gas imaging instrument to image every regulated piece of equipment selected for this work practice in accordance with the instrument manufacturer's operating parameters. All emissions imaged by the optical gas imaging instrument are considered to be leaks and are subject to repair. All emissions visible to the naked eye are also considered to be leaks and are subject to repair.(4) Keep the records described in paragraphs (g)(4)(i) through (g)(4)(vii) of this section:(i) The equipment, processes, and facilities for which the owner or operator chooses to use the alternative work practice.(ii) The detection sensitivity level selected from Table 3 to subpart A of this part for the optical gas imaging instrument.(iii) The analysis to determine the piece of equipment in contact with the lowest mass fraction of chemicals that are detectable, as specified in paragraph (g)(2)(i)(A) of this section.(iv) The technical basis for the mass fraction of detectable chemicals used in the equation in paragraph (g)(2)(i)(B) of this section.(v) Record the distance, per paragraph (g)(2)(iv)(B) of this section, and the flow meter reading, per paragraph (g)(2)(iv)(C) of this section, at which the leak was imaged. Keep a video record of the daily instrument check for each configuration of the optical gas imaging instrument used during the leak survey (for example, the daily instrument check must be conducted for each lens used). The video record must include a time and date stamp for each daily instrument check. The video record must be kept for 5 years.(vi) A video record must be used to document the leak survey results. The video record must include a time and date stamp for each monitoring event. A video record can be used to meet the recordkeeping requirements of the applicable subparts if each piece of regulated equipment selected for this work practice can be identified in the video record. The video record must be kept for 5 years.(vii) Records must be kept for all regulated equipment specified in paragraph (f)(1) of this section. Records must identify the equipment screened, the screening value measured by Method 21, the time and date of the screening, and calibration information required in the existing applicable subparts.(5) Submit the reports required in the applicable subpart. Submit the records of the annual Method 21 screening required in paragraph (f)(7) of this section to the Administrator via e-mail to [email protected].
Citations to §65.7(g)(4)
-
(g) An owner or operator of an affected source who chooses to use the alternative work practice must comply with the requirements of paragraphs (g)(1) through (g)(5) of this section.(1) The optical gas imaging instrument must comply with the requirements specified in paragraphs (g)(1)(i) and (g)(1)(ii) of this section.(i) Provide the operator with an image of the potential leak points for each piece of equipment at both the detection sensitivity level and within the distance used in the daily instrument check described in paragraph (g)(2) of this section. The detection sensitivity level depends upon the frequency at which leak monitoring is to be performed.(2) On a daily basis, and prior to beginning any leak monitoring work, test the optical gas imaging instrument at the mass flow rate determined in paragraph (g)(2)(i) of this section in accordance with the procedure specified in paragraphs (g)(2)(ii) through (g)(2)(iv) of this section for each camera configuration used during monitoring (for example, different lenses used), unless an alternative method to demonstrate daily instrument checks has been approved in accordance with paragraph (g)(2)(v) of this section.(i) Calculate the mass flow rate to be used in the daily instrument check by following the procedures in paragraphs (g)(2)(i)(A) and (g)(2)(i)(B) of this section.(A) For a specified population of equipment to be imaged by the instrument, determine the piece of equipment in contact with the lowest mass fraction of chemicals that are detectable, within the distance to be used in paragraph (g)(2)(iv)(B) of this section, at or below the standard detection sensitivity level.(B) Multiply the standard detection sensitivity level, corresponding to the selected monitoring frequency in Table 3 of subpart A of this part, by the mass fraction of detectable chemicals from the stream identified in paragraph (g)(2)(i)(A) of this section to determine the mass flow rate to be used in the daily instrument check, using the following equation.(ii) Start the optical gas imaging instrument according to the manufacturer's instructions, ensuring that all appropriate settings conform to the manufacturer's instructions.(iii) Use any gas chosen by the user that can be viewed by the optical gas imaging instrument and that has a purity of no less than 98 percent.(A) Provide a source of gas where it will be in the field of view of the optical gas imaging instrument.(B) Set up the optical gas imaging instrument at a recorded distance from the outlet or leak orifice of the flow meter that will not be exceeded in the actual performance of the leak survey. Do not exceed the operating parameters of the flow meter.(C) Open the valve on the flow meter to set a flow rate that will create a mass emission rate equal to the mass rate calculated in paragraph (g)(2)(i) of this section while observing the gas flow through the optical gas imaging instrument viewfinder. When an image of the gas emission is seen through the viewfinder at the required emission rate, make a record of the reading on the flow meter.(v) Repeat the procedures specified in paragraphs (g)(2)(ii) through (g)(2)(iv) of this section for each configuration of the optical gas imaging instrument used during the leak survey.(vi) To use an alternative method to demonstrate daily instrument checks, apply to the Administrator for approval of the alternative under § 65.7(b).(3) Operate the optical gas imaging instrument to image every regulated piece of equipment selected for this work practice in accordance with the instrument manufacturer's operating parameters. All emissions imaged by the optical gas imaging instrument are considered to be leaks and are subject to repair. All emissions visible to the naked eye are also considered to be leaks and are subject to repair.(4) Keep the records described in paragraphs (g)(4)(i) through (g)(4)(vii) of this section:(i) The equipment, processes, and facilities for which the owner or operator chooses to use the alternative work practice.(ii) The detection sensitivity level selected from Table 3 to subpart A of this part for the optical gas imaging instrument.(iii) The analysis to determine the piece of equipment in contact with the lowest mass fraction of chemicals that are detectable, as specified in paragraph (g)(2)(i)(A) of this section.(iv) The technical basis for the mass fraction of detectable chemicals used in the equation in paragraph (g)(2)(i)(B) of this section.(v) Record the distance, per paragraph (g)(2)(iv)(B) of this section, and the flow meter reading, per paragraph (g)(2)(iv)(C) of this section, at which the leak was imaged. Keep a video record of the daily instrument check for each configuration of the optical gas imaging instrument used during the leak survey (for example, the daily instrument check must be conducted for each lens used). The video record must include a time and date stamp for each daily instrument check. The video record must be kept for 5 years.(vi) A video record must be used to document the leak survey results. The video record must include a time and date stamp for each monitoring event. A video record can be used to meet the recordkeeping requirements of the applicable subparts if each piece of regulated equipment selected for this work practice can be identified in the video record. The video record must be kept for 5 years.(vii) Records must be kept for all regulated equipment specified in paragraph (f)(1) of this section. Records must identify the equipment screened, the screening value measured by Method 21, the time and date of the screening, and calibration information required in the existing applicable subparts.(5) Submit the reports required in the applicable subpart. Submit the records of the annual Method 21 screening required in paragraph (f)(7) of this section to the Administrator via e-mail to [email protected].
Citations to §65.7(g)(4)(i)
-
(4) Keep the records described in paragraphs (g)(4)(i) through (g)(4)(vii) of this section:(i) The equipment, processes, and facilities for which the owner or operator chooses to use the alternative work practice.(ii) The detection sensitivity level selected from Table 3 to subpart A of this part for the optical gas imaging instrument.(iii) The analysis to determine the piece of equipment in contact with the lowest mass fraction of chemicals that are detectable, as specified in paragraph (g)(2)(i)(A) of this section.(iv) The technical basis for the mass fraction of detectable chemicals used in the equation in paragraph (g)(2)(i)(B) of this section.(v) Record the distance, per paragraph (g)(2)(iv)(B) of this section, and the flow meter reading, per paragraph (g)(2)(iv)(C) of this section, at which the leak was imaged. Keep a video record of the daily instrument check for each configuration of the optical gas imaging instrument used during the leak survey (for example, the daily instrument check must be conducted for each lens used). The video record must include a time and date stamp for each daily instrument check. The video record must be kept for 5 years.(vi) A video record must be used to document the leak survey results. The video record must include a time and date stamp for each monitoring event. A video record can be used to meet the recordkeeping requirements of the applicable subparts if each piece of regulated equipment selected for this work practice can be identified in the video record. The video record must be kept for 5 years.(vii) Records must be kept for all regulated equipment specified in paragraph (f)(1) of this section. Records must identify the equipment screened, the screening value measured by Method 21, the time and date of the screening, and calibration information required in the existing applicable subparts.
Citations to §65.7(g)(4)(ii)
-
(4) Keep the records described in paragraphs (g)(4)(i) through (g)(4)(vii) of this section:(i) The equipment, processes, and facilities for which the owner or operator chooses to use the alternative work practice.(ii) The detection sensitivity level selected from Table 3 to subpart A of this part for the optical gas imaging instrument.(iii) The analysis to determine the piece of equipment in contact with the lowest mass fraction of chemicals that are detectable, as specified in paragraph (g)(2)(i)(A) of this section.(iv) The technical basis for the mass fraction of detectable chemicals used in the equation in paragraph (g)(2)(i)(B) of this section.(v) Record the distance, per paragraph (g)(2)(iv)(B) of this section, and the flow meter reading, per paragraph (g)(2)(iv)(C) of this section, at which the leak was imaged. Keep a video record of the daily instrument check for each configuration of the optical gas imaging instrument used during the leak survey (for example, the daily instrument check must be conducted for each lens used). The video record must include a time and date stamp for each daily instrument check. The video record must be kept for 5 years.(vi) A video record must be used to document the leak survey results. The video record must include a time and date stamp for each monitoring event. A video record can be used to meet the recordkeeping requirements of the applicable subparts if each piece of regulated equipment selected for this work practice can be identified in the video record. The video record must be kept for 5 years.(vii) Records must be kept for all regulated equipment specified in paragraph (f)(1) of this section. Records must identify the equipment screened, the screening value measured by Method 21, the time and date of the screening, and calibration information required in the existing applicable subparts.
Citations to §65.7(g)(4)(iii)
-
(4) Keep the records described in paragraphs (g)(4)(i) through (g)(4)(vii) of this section:(i) The equipment, processes, and facilities for which the owner or operator chooses to use the alternative work practice.(ii) The detection sensitivity level selected from Table 3 to subpart A of this part for the optical gas imaging instrument.(iii) The analysis to determine the piece of equipment in contact with the lowest mass fraction of chemicals that are detectable, as specified in paragraph (g)(2)(i)(A) of this section.(iv) The technical basis for the mass fraction of detectable chemicals used in the equation in paragraph (g)(2)(i)(B) of this section.(v) Record the distance, per paragraph (g)(2)(iv)(B) of this section, and the flow meter reading, per paragraph (g)(2)(iv)(C) of this section, at which the leak was imaged. Keep a video record of the daily instrument check for each configuration of the optical gas imaging instrument used during the leak survey (for example, the daily instrument check must be conducted for each lens used). The video record must include a time and date stamp for each daily instrument check. The video record must be kept for 5 years.(vi) A video record must be used to document the leak survey results. The video record must include a time and date stamp for each monitoring event. A video record can be used to meet the recordkeeping requirements of the applicable subparts if each piece of regulated equipment selected for this work practice can be identified in the video record. The video record must be kept for 5 years.(vii) Records must be kept for all regulated equipment specified in paragraph (f)(1) of this section. Records must identify the equipment screened, the screening value measured by Method 21, the time and date of the screening, and calibration information required in the existing applicable subparts.
Citations to §65.7(g)(4)(iv)
-
(4) Keep the records described in paragraphs (g)(4)(i) through (g)(4)(vii) of this section:(i) The equipment, processes, and facilities for which the owner or operator chooses to use the alternative work practice.(ii) The detection sensitivity level selected from Table 3 to subpart A of this part for the optical gas imaging instrument.(iii) The analysis to determine the piece of equipment in contact with the lowest mass fraction of chemicals that are detectable, as specified in paragraph (g)(2)(i)(A) of this section.(iv) The technical basis for the mass fraction of detectable chemicals used in the equation in paragraph (g)(2)(i)(B) of this section.(v) Record the distance, per paragraph (g)(2)(iv)(B) of this section, and the flow meter reading, per paragraph (g)(2)(iv)(C) of this section, at which the leak was imaged. Keep a video record of the daily instrument check for each configuration of the optical gas imaging instrument used during the leak survey (for example, the daily instrument check must be conducted for each lens used). The video record must include a time and date stamp for each daily instrument check. The video record must be kept for 5 years.(vi) A video record must be used to document the leak survey results. The video record must include a time and date stamp for each monitoring event. A video record can be used to meet the recordkeeping requirements of the applicable subparts if each piece of regulated equipment selected for this work practice can be identified in the video record. The video record must be kept for 5 years.(vii) Records must be kept for all regulated equipment specified in paragraph (f)(1) of this section. Records must identify the equipment screened, the screening value measured by Method 21, the time and date of the screening, and calibration information required in the existing applicable subparts.
Citations to §65.7(g)(4)(v)
-
(4) Keep the records described in paragraphs (g)(4)(i) through (g)(4)(vii) of this section:(i) The equipment, processes, and facilities for which the owner or operator chooses to use the alternative work practice.(ii) The detection sensitivity level selected from Table 3 to subpart A of this part for the optical gas imaging instrument.(iii) The analysis to determine the piece of equipment in contact with the lowest mass fraction of chemicals that are detectable, as specified in paragraph (g)(2)(i)(A) of this section.(iv) The technical basis for the mass fraction of detectable chemicals used in the equation in paragraph (g)(2)(i)(B) of this section.(v) Record the distance, per paragraph (g)(2)(iv)(B) of this section, and the flow meter reading, per paragraph (g)(2)(iv)(C) of this section, at which the leak was imaged. Keep a video record of the daily instrument check for each configuration of the optical gas imaging instrument used during the leak survey (for example, the daily instrument check must be conducted for each lens used). The video record must include a time and date stamp for each daily instrument check. The video record must be kept for 5 years.(vi) A video record must be used to document the leak survey results. The video record must include a time and date stamp for each monitoring event. A video record can be used to meet the recordkeeping requirements of the applicable subparts if each piece of regulated equipment selected for this work practice can be identified in the video record. The video record must be kept for 5 years.(vii) Records must be kept for all regulated equipment specified in paragraph (f)(1) of this section. Records must identify the equipment screened, the screening value measured by Method 21, the time and date of the screening, and calibration information required in the existing applicable subparts.
Citations to §65.7(g)(4)(vi)
-
(4) Keep the records described in paragraphs (g)(4)(i) through (g)(4)(vii) of this section:(i) The equipment, processes, and facilities for which the owner or operator chooses to use the alternative work practice.(ii) The detection sensitivity level selected from Table 3 to subpart A of this part for the optical gas imaging instrument.(iii) The analysis to determine the piece of equipment in contact with the lowest mass fraction of chemicals that are detectable, as specified in paragraph (g)(2)(i)(A) of this section.(iv) The technical basis for the mass fraction of detectable chemicals used in the equation in paragraph (g)(2)(i)(B) of this section.(v) Record the distance, per paragraph (g)(2)(iv)(B) of this section, and the flow meter reading, per paragraph (g)(2)(iv)(C) of this section, at which the leak was imaged. Keep a video record of the daily instrument check for each configuration of the optical gas imaging instrument used during the leak survey (for example, the daily instrument check must be conducted for each lens used). The video record must include a time and date stamp for each daily instrument check. The video record must be kept for 5 years.(vi) A video record must be used to document the leak survey results. The video record must include a time and date stamp for each monitoring event. A video record can be used to meet the recordkeeping requirements of the applicable subparts if each piece of regulated equipment selected for this work practice can be identified in the video record. The video record must be kept for 5 years.(vii) Records must be kept for all regulated equipment specified in paragraph (f)(1) of this section. Records must identify the equipment screened, the screening value measured by Method 21, the time and date of the screening, and calibration information required in the existing applicable subparts.
Citations to §65.7(g)(4)(vii)
-
(4) Keep the records described in paragraphs (g)(4)(i) through (g)(4)(vii) of this section:(i) The equipment, processes, and facilities for which the owner or operator chooses to use the alternative work practice.(ii) The detection sensitivity level selected from Table 3 to subpart A of this part for the optical gas imaging instrument.(iii) The analysis to determine the piece of equipment in contact with the lowest mass fraction of chemicals that are detectable, as specified in paragraph (g)(2)(i)(A) of this section.(iv) The technical basis for the mass fraction of detectable chemicals used in the equation in paragraph (g)(2)(i)(B) of this section.(v) Record the distance, per paragraph (g)(2)(iv)(B) of this section, and the flow meter reading, per paragraph (g)(2)(iv)(C) of this section, at which the leak was imaged. Keep a video record of the daily instrument check for each configuration of the optical gas imaging instrument used during the leak survey (for example, the daily instrument check must be conducted for each lens used). The video record must include a time and date stamp for each daily instrument check. The video record must be kept for 5 years.(vi) A video record must be used to document the leak survey results. The video record must include a time and date stamp for each monitoring event. A video record can be used to meet the recordkeeping requirements of the applicable subparts if each piece of regulated equipment selected for this work practice can be identified in the video record. The video record must be kept for 5 years.(vii) Records must be kept for all regulated equipment specified in paragraph (f)(1) of this section. Records must identify the equipment screened, the screening value measured by Method 21, the time and date of the screening, and calibration information required in the existing applicable subparts.
Citations to §65.7(g)(5)
-
(g) An owner or operator of an affected source who chooses to use the alternative work practice must comply with the requirements of paragraphs (g)(1) through (g)(5) of this section.(1) The optical gas imaging instrument must comply with the requirements specified in paragraphs (g)(1)(i) and (g)(1)(ii) of this section.(i) Provide the operator with an image of the potential leak points for each piece of equipment at both the detection sensitivity level and within the distance used in the daily instrument check described in paragraph (g)(2) of this section. The detection sensitivity level depends upon the frequency at which leak monitoring is to be performed.(2) On a daily basis, and prior to beginning any leak monitoring work, test the optical gas imaging instrument at the mass flow rate determined in paragraph (g)(2)(i) of this section in accordance with the procedure specified in paragraphs (g)(2)(ii) through (g)(2)(iv) of this section for each camera configuration used during monitoring (for example, different lenses used), unless an alternative method to demonstrate daily instrument checks has been approved in accordance with paragraph (g)(2)(v) of this section.(i) Calculate the mass flow rate to be used in the daily instrument check by following the procedures in paragraphs (g)(2)(i)(A) and (g)(2)(i)(B) of this section.(A) For a specified population of equipment to be imaged by the instrument, determine the piece of equipment in contact with the lowest mass fraction of chemicals that are detectable, within the distance to be used in paragraph (g)(2)(iv)(B) of this section, at or below the standard detection sensitivity level.(B) Multiply the standard detection sensitivity level, corresponding to the selected monitoring frequency in Table 3 of subpart A of this part, by the mass fraction of detectable chemicals from the stream identified in paragraph (g)(2)(i)(A) of this section to determine the mass flow rate to be used in the daily instrument check, using the following equation.(ii) Start the optical gas imaging instrument according to the manufacturer's instructions, ensuring that all appropriate settings conform to the manufacturer's instructions.(iii) Use any gas chosen by the user that can be viewed by the optical gas imaging instrument and that has a purity of no less than 98 percent.(A) Provide a source of gas where it will be in the field of view of the optical gas imaging instrument.(B) Set up the optical gas imaging instrument at a recorded distance from the outlet or leak orifice of the flow meter that will not be exceeded in the actual performance of the leak survey. Do not exceed the operating parameters of the flow meter.(C) Open the valve on the flow meter to set a flow rate that will create a mass emission rate equal to the mass rate calculated in paragraph (g)(2)(i) of this section while observing the gas flow through the optical gas imaging instrument viewfinder. When an image of the gas emission is seen through the viewfinder at the required emission rate, make a record of the reading on the flow meter.(v) Repeat the procedures specified in paragraphs (g)(2)(ii) through (g)(2)(iv) of this section for each configuration of the optical gas imaging instrument used during the leak survey.(vi) To use an alternative method to demonstrate daily instrument checks, apply to the Administrator for approval of the alternative under § 65.7(b).(3) Operate the optical gas imaging instrument to image every regulated piece of equipment selected for this work practice in accordance with the instrument manufacturer's operating parameters. All emissions imaged by the optical gas imaging instrument are considered to be leaks and are subject to repair. All emissions visible to the naked eye are also considered to be leaks and are subject to repair.(4) Keep the records described in paragraphs (g)(4)(i) through (g)(4)(vii) of this section:(i) The equipment, processes, and facilities for which the owner or operator chooses to use the alternative work practice.(ii) The detection sensitivity level selected from Table 3 to subpart A of this part for the optical gas imaging instrument.(iii) The analysis to determine the piece of equipment in contact with the lowest mass fraction of chemicals that are detectable, as specified in paragraph (g)(2)(i)(A) of this section.(iv) The technical basis for the mass fraction of detectable chemicals used in the equation in paragraph (g)(2)(i)(B) of this section.(v) Record the distance, per paragraph (g)(2)(iv)(B) of this section, and the flow meter reading, per paragraph (g)(2)(iv)(C) of this section, at which the leak was imaged. Keep a video record of the daily instrument check for each configuration of the optical gas imaging instrument used during the leak survey (for example, the daily instrument check must be conducted for each lens used). The video record must include a time and date stamp for each daily instrument check. The video record must be kept for 5 years.(vi) A video record must be used to document the leak survey results. The video record must include a time and date stamp for each monitoring event. A video record can be used to meet the recordkeeping requirements of the applicable subparts if each piece of regulated equipment selected for this work practice can be identified in the video record. The video record must be kept for 5 years.(vii) Records must be kept for all regulated equipment specified in paragraph (f)(1) of this section. Records must identify the equipment screened, the screening value measured by Method 21, the time and date of the screening, and calibration information required in the existing applicable subparts.(5) Submit the reports required in the applicable subpart. Submit the records of the annual Method 21 screening required in paragraph (f)(7) of this section to the Administrator via e-mail to [email protected].