§63.94. Approval of State permit terms and conditions that substitute for a section 112 rule. — Inbound Citations
40 C.F.R. § 63.94
Statutory Authority
Cited by 4 regulations in release Current.
Citations to 40 C.F.R. § 63.94 as a whole
-
(a) The following definitions apply to this subpart.Alternative requirements means the requirements, rules, permits, provisions, methods, or other enforceable mechanisms that a State submits for approval under this subpart or subpart A and, after approval, replaces the otherwise applicable Federal section 112 requirements, provisions, or methods.Applicability criteria means the regulatory criteria used to define all affected sources subject to a specific section 112 rule.Approval means a determination by the Administrator that a State rule, program, or requirement meets the criteria of § 63.91 and the additional criteria of either § 63.92, § 63.93, § 63.94, or § 63.97 as appropriate. For accidental release prevention programs, the criteria of § 63.95 must be met in addition to the criteria of § 63.91. This is considered a “full approval” for the purposes of this subpart. Partial approvals may also be granted as described in this subpart. Any approved requirements become applicable requirements under § 70.2 of this chapter.Compliance and enforcement measures means requirements relating to compliance and enforcement, including but not necessarily limited to monitoring methods and procedures, recordkeeping, reporting, plans, inspection, maintenance, and operation requirements, pollution prevention requirements, noticing, field inspections, entry, sampling, or accidental release prevention oversight.Intermediate change to monitoring means a modification to federally required monitoring involving “proven technology” (generally accepted by the scientific community as equivalent or better) that is applied on a site-specific basis and that may have the potential to decrease the stringency of the associated emission limitation or standard. Though site-specific, an intermediate change may set a national precedent for a source category and may ultimately result in a revision to the federally required monitoring. Examples of intermediate changes to monitoring include, but are not limited to:(1) Use of a continuous emission monitoring system (CEMS) in lieu of a parameter monitoring approach;(2) Decreased frequency for non-continuous parameter monitoring or physical inspections;(3) Changes to quality control requirements for parameter monitoring; and(4) Intermediate change to test method means a within-method modification to a federally enforceable test method involving “proven technology” (generally accepted by the scientific community as equivalent or better) that is applied on a site-specific basis and that may have the potential to decrease the stringency of the associated emission limitation or standard. Though site-specific, an intermediate change may set a national precedent for a source category and may ultimately result in a revision to the federally enforceable test method. In order to be approved, an intermediate change must be validated according to EPA Method 301 (Part 63, Appendix A) to demonstrate that it provides equal or improved accuracy and precision. Examples of intermediate changes to a test method include, but are not limited to:(1) Modifications to a test method's sampling procedure including substitution of sampling equipment that has been demonstrated for a particular sample matrix, and use of a different impinger absorbing solution;(2) Changes in sample recovery procedures and analytical techniques, such as changes to sample holding times and use of a different analytical finish with proven capability for the analyte of interest; and(3) “Combining” a federally required method with another proven method for application to processes emitting multiple pollutants.Level of control means the degree to which a rule, program, or requirement limits emissions or employs design, equipment, work practice, or operational standards, accident prevention, or other requirements or techniques (including a prohibition of emissions) for:(i) Each hazardous air pollutant, if individual pollutants are subject to emission limitations, and(ii) The aggregate total of hazardous air pollutants, if the aggregate grouping is subject to emission limitations, provided that the rule, program, or requirement would not lead to an increase in risk to human health or the environment; and(3) Local agency means a local air pollution control agency or, for the purposes of § 63.95, any local agency or entity having responsibility for preventing accidental releases which may occur at a source regulated under part 68 of this chapter.Major change to monitoring means a modification to federally required monitoring that uses “unproven technology or procedures” (not generally accepted by the scientific community) or is an entirely new method (sometimes necessary when the required monitoring is unsuitable). A major change to monitoring may be site-specific or may apply to one or more source categories and will almost always set a national precedent. Examples of major changes to monitoring include, but are not limited to:(1) Use of a new monitoring approach developed to apply to a control technology not contemplated in the applicable regulation;(2) Use of a predictive emission monitoring system (PEMS) in place of a required continuous emission monitoring system (CEMS);(3) Use of alternative calibration procedures that do not involve calibration gases or test cells;(4) Use of an analytical technology that differs from that specified by a performance specification;(5) Decreased monitoring frequency for a continuous emission monitoring system, continuous opacity monitoring system, predictive emission monitoring system, or continuous parameter monitoring system;(6) Decreased monitoring frequency for a leak detection and repair program; and(7) Major change to recordkeeping/reporting means:(i) May decrease the stringency of the required compliance and enforcement measures for the relevant standards;(ii) May have national significance (e.g., might affect implementation of the applicable regulation for other affected sources, might set a national precedent); or(i) Decreases in the record retention for all records;(ii) Waiver of all or most recordkeeping or reporting requirements;(iii) Major changes to the contents of reports; or(iv) Decreases in the reliability of recordkeeping or reporting (e.g., manual recording of monitoring data instead of required automated or electronic recording, or paper reports where electronic reporting may have been required).Major change to test method means a modification to a federally enforceable test method that uses “unproven technology or procedures” (not generally accepted by the scientific community) or is an entirely new method (sometimes necessary when the required test method is unsuitable). A major change to a test method may be site-specific, or may apply to one or more sources or source categories, and will almost always set a national precedent. In order to be approved, a major change must be validated according to EPA Method 301 (part 63, appendix A). Examples of major changes to a test method include, but are not limited to:(1) Use of an unproven analytical finish;(2) Use of a method developed to fill a test method gap;(3) Use of a new test method developed to apply to a control technology not contemplated in the applicable regulation; and(4) Combining two or more sampling/analytical methods (at least one unproven) into one for application to processes emitting multiple pollutants.Minor change to monitoring means:(i) Does not decrease the stringency of the compliance and enforcement measures for the relevant standard;(ii) Has no national significance (e.g., does not affect implementation of the applicable regulation for other affected sources, does not set a national precedent, and individually does not result in a revision to the monitoring requirements); and(iii) Is site-specific, made to reflect or accommodate the operational characteristics, physical constraints, or safety concerns of an affected source.(i) Modifications to a sampling procedure, such as use of an improved sample conditioning system to reduce maintenance requirements;(ii) Increased monitoring frequency; and(iii) Modification of the environmental shelter to moderate temperature fluctuation and thus protect the analytical instrumentation.Minor change to recordkeeping/reporting means:(i) Does not decrease the stringency of the compliance and enforcement measures for the relevant standards;(ii) Has no national significance (e.g., does not affect implementation of the applicable regulation for other affected sources, does not set a national precedent, and individually does not result in a revision to the recordkeeping or reporting requirement); and(i) Changes to recordkeeping necessitated by alternatives to monitoring;(ii) Increased frequency of recordkeeping or reporting, or increased record retention periods;(iii) Increased reliability in the form of recording monitoring data, e.g., electronic or automatic recording as opposed to manual recording of monitoring data;(iv) Changes related to compliance extensions granted pursuant to § 63.6(i);(v) Changes to recordkeeping for good cause shown for a fixed short duration, e.g., facility shutdown;(vi) Changes to recordkeeping or reporting that is clearly redundant with equivalent recordkeeping/reporting requirements; and(vii) Decreases in the frequency of reporting for area sources to no less than once a year for good cause shown, or for major sources to no less than twice a year as required by title V, for good cause shown.Minor change to test method means:(i) Does not decrease the stringency of the emission limitation or standard;(ii) Has no national significance (e.g., does not affect implementation of the applicable regulation for other affected sources, does not set a national precedent, and individually does not result in a revision to the test method); and(iii) Is site-specific, made to reflect or accommodate the operational characteristics, physical constraints, or safety concerns of an affected source.(i) Field adjustments in a test method's sampling procedure, such as a modified sampling traverse or location to avoid interference from an obstruction in the stack, increasing the sampling time or volume, use of additional impingers for a high moisture situation, accepting particulate emission results for a test run that was conducted with a lower than specified temperature, substitution of a material in the sampling train that has been demonstrated to be more inert for the sample matrix; and(ii) Changes in recovery and analytical techniques such as a change in quality control/quality assurance requirements needed to adjust for analysis of a certain sample matrix.Partial approval means that the Administrator approves under this subpart:(1) A State's legal authorities that fully meet the criteria of § 63.91(d)(3)(ii)-(v), and substantially meet the criteria of § 63.91(d)(3)(i) as appropriate; or(2) A State rule or program that meets the criteria of § 63.92, § 63.93, § 63.94, § 63.95, or § 63.97 with the exception of a separable portion of that State rule or program which fails to meet those criteria. A separable portion of a State rule or program is defined as a section(s) of a rule or a portion(s) of a program which can be acted upon independently without affecting the overall integrity of the rule or program as a whole.Program means, for the purposes of an approval under this subpart, a collection of State authorities, resources, and other requirements that satisfy the criteria of this subpart and subpart A.State agency, for the purposes of this subpart, includes State and local air pollution agencies, Indian tribes as defined in § 71.2 of this chapter, and territories of the United States to the extent they are or will be delegated Federal section 112 rules, emission standards, or requirements.Stringent or stringency means the degree of rigor, strictness or severity a statute, rule, emission standard, or requirement imposes on an affected source as measured by the quantity of emissions, or as measured by parameters relating to rule applicability and level of control, or as otherwise determined by the Administrator.
-
(a) A State must satisfy the criteria in paragraph (d) of this section for up-front approval to obtain delegation of the Federal section 112 rules, emission standards, or requirements. Once a State has demonstrated it meets the criteria in paragraph (d) of this section, it only needs to reference that demonstration and reaffirm that it still meets the criteria in future submittals. In addition, a State must satisfy the applicable approval criteria in § 63.92, § 63.93, § 63.94, § 63.95, or § 63.97, as specified in the following paragraphs.(1) To obtain approval of State programs to implement and enforce Federal section 112 rules as promulgated without changes (except for accidental release programs, described in paragraph (a)(4) of this section), only the criteria of paragraph (d) of this section must be met. This includes State requests for one-time approval of their mechanism for taking delegation of future unchanged Federal section 112 rules, emission standards, and requirements as well as approval to implement and enforce unchanged Federal section 112 rules, emission standards, and requirements on a rule-by-rule basis.(2) To obtain approval under this subpart of a rule, program, or requirement that is different from the Federal section 112 rule, emission standard, or requirement, the criteria of paragraph (d) of this section and the criteria of either § 63.92, § 63.93, § 63.94, or § 63.97 must be met.(3) To obtain partial approval under this subpart, a State request must meet the criteria in paragraphs (d) and (f) of this section.(4) For approval of State rules or programs to implement and enforce the Federal accidental release prevention program in part 68 of this chapter, as promulgated without changes, the provisions of paragraph (d) of this section, and § 63.95 must be met. For approval of alternative requirements, the provisions of either § 63.92 or § 63.93 must also be met.(5) The Administrator may, under the authority of section 112(l) and this subpart, also approve a State program designed to establish limits on the potential to emit hazardous air pollutants listed pursuant to section 112 of the Act.
-
(6) A State may submit a new rule, program or portion of a rule or program for approval after the Administrator has withdrawn approval of the State's rule, program or portion of a rule or program. The Administrator will determine whether the new rule or program or portion of a rule or program is approvable according to the criteria and procedures of § 63.91 and either of § 63.92, § 63.93 or § 63.94.
Citations to §63.94(d)
-
(i) The Tennessee Department of Environment and Conservation (TDEC) has “up-front” approval to implement an Equivalency by Permit (EBP) program under which TDEC may establish and enforce alternative requirements for the Ellison Surface Technologies, Inc. facility located in Morgan County, Tennessee (Ellison) in lieu of those of the National Emissions Standard for Hazardous Air Pollutants (NESHAP) for Plating and Polishing Operations at 40 CFR part 63, subpart WWWWWW, “National Emission Standards for Hazardous Air Pollutants: Area Source Standards for Plating and Polishing Operations.” TDEC may only establish alternative requirements for Ellison that are at least as stringent as the otherwise applicable Federal requirements. TDEC must, in order to establish alternative requirements for Ellison under its EPA-approved EBP program: submit to the EPA for review pre-draft title V permit terms specifying alternative requirements that meet the criteria of 40 CFR 63.94(d), including the criterion that the alternative requirements are at least as stringent as the otherwise applicable Federal requirements; obtain the EPA's written approval of the alternative pre-draft title V permit requirements; and issue a title V permit for Ellison that contains the approved alternative requirements. Until the EPA has approved the alternative permit terms and conditions and TDEC has issued a final title V permit incorporating them, Ellison will remain subject to the Federal NESHAP requirements found at 40 CFR part 63, subpart WWWWWW.