§63.91. Criteria for straight delegation and criteria common to all approval options. — Inbound Citations
40 C.F.R. § 63.91
Statutory Authority
Cited by 23 regulations in release Current.
Citations to 40 U.S.C. § 63.91 as a whole
-
(a) The following definitions apply to this subpart.Alternative requirements means the requirements, rules, permits, provisions, methods, or other enforceable mechanisms that a State submits for approval under this subpart or subpart A and, after approval, replaces the otherwise applicable Federal section 112 requirements, provisions, or methods.Applicability criteria means the regulatory criteria used to define all affected sources subject to a specific section 112 rule.Approval means a determination by the Administrator that a State rule, program, or requirement meets the criteria of § 63.91 and the additional criteria of either § 63.92, § 63.93, § 63.94, or § 63.97 as appropriate. For accidental release prevention programs, the criteria of § 63.95 must be met in addition to the criteria of § 63.91. This is considered a “full approval” for the purposes of this subpart. Partial approvals may also be granted as described in this subpart. Any approved requirements become applicable requirements under § 70.2 of this chapter.Compliance and enforcement measures means requirements relating to compliance and enforcement, including but not necessarily limited to monitoring methods and procedures, recordkeeping, reporting, plans, inspection, maintenance, and operation requirements, pollution prevention requirements, noticing, field inspections, entry, sampling, or accidental release prevention oversight.Intermediate change to monitoring means a modification to federally required monitoring involving “proven technology” (generally accepted by the scientific community as equivalent or better) that is applied on a site-specific basis and that may have the potential to decrease the stringency of the associated emission limitation or standard. Though site-specific, an intermediate change may set a national precedent for a source category and may ultimately result in a revision to the federally required monitoring. Examples of intermediate changes to monitoring include, but are not limited to:(1) Use of a continuous emission monitoring system (CEMS) in lieu of a parameter monitoring approach;(2) Decreased frequency for non-continuous parameter monitoring or physical inspections;(3) Changes to quality control requirements for parameter monitoring; and(4) Intermediate change to test method means a within-method modification to a federally enforceable test method involving “proven technology” (generally accepted by the scientific community as equivalent or better) that is applied on a site-specific basis and that may have the potential to decrease the stringency of the associated emission limitation or standard. Though site-specific, an intermediate change may set a national precedent for a source category and may ultimately result in a revision to the federally enforceable test method. In order to be approved, an intermediate change must be validated according to EPA Method 301 (Part 63, Appendix A) to demonstrate that it provides equal or improved accuracy and precision. Examples of intermediate changes to a test method include, but are not limited to:(1) Modifications to a test method's sampling procedure including substitution of sampling equipment that has been demonstrated for a particular sample matrix, and use of a different impinger absorbing solution;(2) Changes in sample recovery procedures and analytical techniques, such as changes to sample holding times and use of a different analytical finish with proven capability for the analyte of interest; and(3) “Combining” a federally required method with another proven method for application to processes emitting multiple pollutants.Level of control means the degree to which a rule, program, or requirement limits emissions or employs design, equipment, work practice, or operational standards, accident prevention, or other requirements or techniques (including a prohibition of emissions) for:(i) Each hazardous air pollutant, if individual pollutants are subject to emission limitations, and(ii) The aggregate total of hazardous air pollutants, if the aggregate grouping is subject to emission limitations, provided that the rule, program, or requirement would not lead to an increase in risk to human health or the environment; and(3) Local agency means a local air pollution control agency or, for the purposes of § 63.95, any local agency or entity having responsibility for preventing accidental releases which may occur at a source regulated under part 68 of this chapter.Major change to monitoring means a modification to federally required monitoring that uses “unproven technology or procedures” (not generally accepted by the scientific community) or is an entirely new method (sometimes necessary when the required monitoring is unsuitable). A major change to monitoring may be site-specific or may apply to one or more source categories and will almost always set a national precedent. Examples of major changes to monitoring include, but are not limited to:(1) Use of a new monitoring approach developed to apply to a control technology not contemplated in the applicable regulation;(2) Use of a predictive emission monitoring system (PEMS) in place of a required continuous emission monitoring system (CEMS);(3) Use of alternative calibration procedures that do not involve calibration gases or test cells;(4) Use of an analytical technology that differs from that specified by a performance specification;(5) Decreased monitoring frequency for a continuous emission monitoring system, continuous opacity monitoring system, predictive emission monitoring system, or continuous parameter monitoring system;(6) Decreased monitoring frequency for a leak detection and repair program; and(7) Major change to recordkeeping/reporting means:(i) May decrease the stringency of the required compliance and enforcement measures for the relevant standards;(ii) May have national significance (e.g., might affect implementation of the applicable regulation for other affected sources, might set a national precedent); or(i) Decreases in the record retention for all records;(ii) Waiver of all or most recordkeeping or reporting requirements;(iii) Major changes to the contents of reports; or(iv) Decreases in the reliability of recordkeeping or reporting (e.g., manual recording of monitoring data instead of required automated or electronic recording, or paper reports where electronic reporting may have been required).Major change to test method means a modification to a federally enforceable test method that uses “unproven technology or procedures” (not generally accepted by the scientific community) or is an entirely new method (sometimes necessary when the required test method is unsuitable). A major change to a test method may be site-specific, or may apply to one or more sources or source categories, and will almost always set a national precedent. In order to be approved, a major change must be validated according to EPA Method 301 (part 63, appendix A). Examples of major changes to a test method include, but are not limited to:(1) Use of an unproven analytical finish;(2) Use of a method developed to fill a test method gap;(3) Use of a new test method developed to apply to a control technology not contemplated in the applicable regulation; and(4) Combining two or more sampling/analytical methods (at least one unproven) into one for application to processes emitting multiple pollutants.Minor change to monitoring means:(i) Does not decrease the stringency of the compliance and enforcement measures for the relevant standard;(ii) Has no national significance (e.g., does not affect implementation of the applicable regulation for other affected sources, does not set a national precedent, and individually does not result in a revision to the monitoring requirements); and(iii) Is site-specific, made to reflect or accommodate the operational characteristics, physical constraints, or safety concerns of an affected source.(i) Modifications to a sampling procedure, such as use of an improved sample conditioning system to reduce maintenance requirements;(ii) Increased monitoring frequency; and(iii) Modification of the environmental shelter to moderate temperature fluctuation and thus protect the analytical instrumentation.Minor change to recordkeeping/reporting means:(i) Does not decrease the stringency of the compliance and enforcement measures for the relevant standards;(ii) Has no national significance (e.g., does not affect implementation of the applicable regulation for other affected sources, does not set a national precedent, and individually does not result in a revision to the recordkeeping or reporting requirement); and(i) Changes to recordkeeping necessitated by alternatives to monitoring;(ii) Increased frequency of recordkeeping or reporting, or increased record retention periods;(iii) Increased reliability in the form of recording monitoring data, e.g., electronic or automatic recording as opposed to manual recording of monitoring data;(iv) Changes related to compliance extensions granted pursuant to § 63.6(i);(v) Changes to recordkeeping for good cause shown for a fixed short duration, e.g., facility shutdown;(vi) Changes to recordkeeping or reporting that is clearly redundant with equivalent recordkeeping/reporting requirements; and(vii) Decreases in the frequency of reporting for area sources to no less than once a year for good cause shown, or for major sources to no less than twice a year as required by title V, for good cause shown.Minor change to test method means:(i) Does not decrease the stringency of the emission limitation or standard;(ii) Has no national significance (e.g., does not affect implementation of the applicable regulation for other affected sources, does not set a national precedent, and individually does not result in a revision to the test method); and(iii) Is site-specific, made to reflect or accommodate the operational characteristics, physical constraints, or safety concerns of an affected source.(i) Field adjustments in a test method's sampling procedure, such as a modified sampling traverse or location to avoid interference from an obstruction in the stack, increasing the sampling time or volume, use of additional impingers for a high moisture situation, accepting particulate emission results for a test run that was conducted with a lower than specified temperature, substitution of a material in the sampling train that has been demonstrated to be more inert for the sample matrix; and(ii) Changes in recovery and analytical techniques such as a change in quality control/quality assurance requirements needed to adjust for analysis of a certain sample matrix.Partial approval means that the Administrator approves under this subpart:(1) A State's legal authorities that fully meet the criteria of § 63.91(d)(3)(ii)-(v), and substantially meet the criteria of § 63.91(d)(3)(i) as appropriate; or(2) A State rule or program that meets the criteria of § 63.92, § 63.93, § 63.94, § 63.95, or § 63.97 with the exception of a separable portion of that State rule or program which fails to meet those criteria. A separable portion of a State rule or program is defined as a section(s) of a rule or a portion(s) of a program which can be acted upon independently without affecting the overall integrity of the rule or program as a whole.Program means, for the purposes of an approval under this subpart, a collection of State authorities, resources, and other requirements that satisfy the criteria of this subpart and subpart A.State agency, for the purposes of this subpart, includes State and local air pollution agencies, Indian tribes as defined in § 71.2 of this chapter, and territories of the United States to the extent they are or will be delegated Federal section 112 rules, emission standards, or requirements.Stringent or stringency means the degree of rigor, strictness or severity a statute, rule, emission standard, or requirement imposes on an affected source as measured by the quantity of emissions, or as measured by parameters relating to rule applicability and level of control, or as otherwise determined by the Administrator.
-
(i) The approved State rule, program, or requirement shall be federally enforceable from the date the Administrator signs the approval, with two exceptions. For States that implement unchanged Federal requirements (§ 63.91, straight delegation) via their title V permit program, and for States using the equivalency by permit option (63.94), the approved requirements shall be federally enforceable on the date of issuance or revision of the title V permit.
-
(1) If the Administrator finds that the criteria of this section and the criteria of § 63.91 are met, the Administrator will approve the State requirements, publish them in the Federal Register, and incorporate them, directly or by reference, in the appropriate subpart of part 63, without additional notice and opportunity for comment. Requirements approved under § 63.95 will be incorporated pursuant to requirements under part 68 of this chapter.
-
(2) If, after review of public comments and any State responses to comments submitted to the Administrator, the Administrator finds that the criteria of this section and the criteria of § 63.91 are met, the Administrator will approve the State requirements under this section, publish the approved requirements in the Federal Register, and incorporate them directly or by reference, in the appropriate subpart of part 63. Requirements approved under § 63.95 will be incorporated pursuant to requirements under part 68 of this chapter.
-
(2) If, after review of all public comments, and State responses to comments submitted to the Administrator, the Administrator finds that the criteria of paragraph (b) of this section and the criteria of § 63.91 are met, the Administrator will approve the State program. The approved program will be published in the Federal Register and incorporated directly or by reference in the appropriate subpart of part 63.
-
-
(6) A State may submit a new rule, program or portion of a rule or program for approval after the Administrator has withdrawn approval of the State's rule, program or portion of a rule or program. The Administrator will determine whether the new rule or program or portion of a rule or program is approvable according to the criteria and procedures of § 63.91 and either of § 63.92, § 63.93 or § 63.94.
-
(4) If, after review of all public comments and State responses to comments submitted to the Administrator, the Administrator finds that the criteria of paragraph (b) of this section and the criteria of § 63.91 are met, the Administrator will approve or partially approve the State program. The approved State program will be published in the Federal Register and incorporated, directly or by reference, in the appropriate subpart of part 63.
-
(A) Except for authorities identified as not being delegated, the regulations incorporated in New Jersey's “Toxic Catastrophe Prevention Act Program,” Title 7, Chapter 31, of the New Jersey Administrative Code: Subchapter 1, “General Provisions” (sections 1.1 to 1.10 except for the definition of “What if Checklist”), Subchapter 2, “Hazard Assessment,” Subchapter 3, “Minimum Requirements for a Program 2 TCPA Risk Management Program,” Subchapter 4, “Minimum Requirements for a Program 3 TCPA Risk Management Program,” Subchapter 5, “Emergency Response,” Subchapter 6, “Extraordinarily Hazardous Substances,” Subchapter 7, “Risk Management Plan and TCPA Submission,” and Subchapter 8, “Other Federal Requirements,” (effective July 20, 1998), pertain to the sources affected by 40 CFR part 68 and have been approved under the procedures in §§ 63.91, 63.93 and 63.95 to be implemented and enforced in place of 40 CFR part 68, Subparts A through H, as may be amended.(1) Authorities not delegated:(i) The New Jersey Department of Environmental Protection is not delegated the Administrator's authority to implement and enforce New Jersey's Toxic Catastrophe Prevention Act Program, Title 7, Chapter 31, of the New Jersey Administrative Code, in lieu of the provisions of 40 CFR part 68 as they apply to the regulation of processes that are covered only because they contain regulated quantities of liquid petroleum gases (LPG) regulated under the New Jersey Liquified Petroleum Gas Act of 1950 (N.J.S.A. 21:1B),(ii) Pursuant to § 63.90(c) the New Jersey Department of Environmental Protection is not delegated the Administrator's authority to add or delete substances from the list of substances established under section 112(r) and set forth in 40 CFR 68.130.
Citations to §63.91(d)
-
(2) Once a State has satisfied the § 63.91(d) up-front approval requirements, it only needs to reference the previous demonstration and reaffirm that is still meets the criteria for any subsequent equivalency submittals.
Citations to §63.91(d)(3)(i)
-
(1) Use of a continuous emission monitoring system (CEMS) in lieu of a parameter monitoring approach;
-
(3) Interim or final title V program approval will satisfy the criteria set forth in § 63.91(d), up-front approval criteria. Alternatively, the State must provide the following items in paragraphs (d)(3)(i) through (v) of this section to the Administrator:(i) A written finding by the State Attorney General (or for a local agency or tribal authority, the General Counsel with full authority to represent the local agency or tribal authority) that the State has the necessary legal authority to implement and to enforce the State rule, program, or requirement upon approval and to assure compliance by all sources within the State with each applicable section 112 rule, emission standard, or requirement. For full approval, the State must have the following legal authorities concerning enforcement and compliance assurance:(A) The State shall have enforcement authorities that meet the requirements of § 70.11 of this chapter, except that tribal authorities shall have enforcement authorities that meet the requirements of part 49 of this chapter, the Tribal Air Rule.(B) The State shall have authority to request information from regulated sources regarding their compliance status.(C) The State shall have authority to inspect sources and any records required to determine a source's compliance status.(D) If a State delegates authorities to a local agency, the State must retain enforcement authority unless the local agency has authorities that meet the requirements of § 70.11 of this chapter.(ii) A copy of State statutes, regulations, and requirements that contain the appropriate provisions granting authority to implement and enforce the State rule, program, or requirement upon approval.(iii) A demonstration that the State has adequate resources to implement and enforce all aspects of the rule, program, or requirement upon approval (except for authorities explicitly retained by the Administrator, such as those pursuant to paragraph (f) of this section or pursuant to part 49 of this chapter), which includes:(B) A description of the organization and structure of the agency or agencies that will have responsibility for administering the program.(C) A description of the agency's capacity to carry out the State program, including the number, occupation, and general duties of the employees.(iv) A schedule demonstrating expeditious State implementation of the rule, program, or requirement upon approval.(v) A plan that assures expeditious compliance by all sources subject to the State rule, program, or requirement upon approval. The plan should include, at a minimum, a complete description of the State's compliance tracking and enforcement program, including but not limited to inspection strategies.
Citations to §63.91(d)(3)(ii)
-
(1) Use of a continuous emission monitoring system (CEMS) in lieu of a parameter monitoring approach;
-
(3) Interim or final title V program approval will satisfy the criteria set forth in § 63.91(d), up-front approval criteria. Alternatively, the State must provide the following items in paragraphs (d)(3)(i) through (v) of this section to the Administrator:(i) A written finding by the State Attorney General (or for a local agency or tribal authority, the General Counsel with full authority to represent the local agency or tribal authority) that the State has the necessary legal authority to implement and to enforce the State rule, program, or requirement upon approval and to assure compliance by all sources within the State with each applicable section 112 rule, emission standard, or requirement. For full approval, the State must have the following legal authorities concerning enforcement and compliance assurance:(A) The State shall have enforcement authorities that meet the requirements of § 70.11 of this chapter, except that tribal authorities shall have enforcement authorities that meet the requirements of part 49 of this chapter, the Tribal Air Rule.(B) The State shall have authority to request information from regulated sources regarding their compliance status.(C) The State shall have authority to inspect sources and any records required to determine a source's compliance status.(D) If a State delegates authorities to a local agency, the State must retain enforcement authority unless the local agency has authorities that meet the requirements of § 70.11 of this chapter.(ii) A copy of State statutes, regulations, and requirements that contain the appropriate provisions granting authority to implement and enforce the State rule, program, or requirement upon approval.(iii) A demonstration that the State has adequate resources to implement and enforce all aspects of the rule, program, or requirement upon approval (except for authorities explicitly retained by the Administrator, such as those pursuant to paragraph (f) of this section or pursuant to part 49 of this chapter), which includes:(B) A description of the organization and structure of the agency or agencies that will have responsibility for administering the program.(C) A description of the agency's capacity to carry out the State program, including the number, occupation, and general duties of the employees.(iv) A schedule demonstrating expeditious State implementation of the rule, program, or requirement upon approval.(v) A plan that assures expeditious compliance by all sources subject to the State rule, program, or requirement upon approval. The plan should include, at a minimum, a complete description of the State's compliance tracking and enforcement program, including but not limited to inspection strategies.
Citations to §63.91(d)(3)(iii)
-
(1) Use of a continuous emission monitoring system (CEMS) in lieu of a parameter monitoring approach;
-
(3) Interim or final title V program approval will satisfy the criteria set forth in § 63.91(d), up-front approval criteria. Alternatively, the State must provide the following items in paragraphs (d)(3)(i) through (v) of this section to the Administrator:(i) A written finding by the State Attorney General (or for a local agency or tribal authority, the General Counsel with full authority to represent the local agency or tribal authority) that the State has the necessary legal authority to implement and to enforce the State rule, program, or requirement upon approval and to assure compliance by all sources within the State with each applicable section 112 rule, emission standard, or requirement. For full approval, the State must have the following legal authorities concerning enforcement and compliance assurance:(A) The State shall have enforcement authorities that meet the requirements of § 70.11 of this chapter, except that tribal authorities shall have enforcement authorities that meet the requirements of part 49 of this chapter, the Tribal Air Rule.(B) The State shall have authority to request information from regulated sources regarding their compliance status.(C) The State shall have authority to inspect sources and any records required to determine a source's compliance status.(D) If a State delegates authorities to a local agency, the State must retain enforcement authority unless the local agency has authorities that meet the requirements of § 70.11 of this chapter.(ii) A copy of State statutes, regulations, and requirements that contain the appropriate provisions granting authority to implement and enforce the State rule, program, or requirement upon approval.(iii) A demonstration that the State has adequate resources to implement and enforce all aspects of the rule, program, or requirement upon approval (except for authorities explicitly retained by the Administrator, such as those pursuant to paragraph (f) of this section or pursuant to part 49 of this chapter), which includes:(B) A description of the organization and structure of the agency or agencies that will have responsibility for administering the program.(C) A description of the agency's capacity to carry out the State program, including the number, occupation, and general duties of the employees.(iv) A schedule demonstrating expeditious State implementation of the rule, program, or requirement upon approval.(v) A plan that assures expeditious compliance by all sources subject to the State rule, program, or requirement upon approval. The plan should include, at a minimum, a complete description of the State's compliance tracking and enforcement program, including but not limited to inspection strategies.
Citations to §63.91(d)(3)(iv)
-
(1) Use of a continuous emission monitoring system (CEMS) in lieu of a parameter monitoring approach;
-
(3) Interim or final title V program approval will satisfy the criteria set forth in § 63.91(d), up-front approval criteria. Alternatively, the State must provide the following items in paragraphs (d)(3)(i) through (v) of this section to the Administrator:(i) A written finding by the State Attorney General (or for a local agency or tribal authority, the General Counsel with full authority to represent the local agency or tribal authority) that the State has the necessary legal authority to implement and to enforce the State rule, program, or requirement upon approval and to assure compliance by all sources within the State with each applicable section 112 rule, emission standard, or requirement. For full approval, the State must have the following legal authorities concerning enforcement and compliance assurance:(A) The State shall have enforcement authorities that meet the requirements of § 70.11 of this chapter, except that tribal authorities shall have enforcement authorities that meet the requirements of part 49 of this chapter, the Tribal Air Rule.(B) The State shall have authority to request information from regulated sources regarding their compliance status.(C) The State shall have authority to inspect sources and any records required to determine a source's compliance status.(D) If a State delegates authorities to a local agency, the State must retain enforcement authority unless the local agency has authorities that meet the requirements of § 70.11 of this chapter.(ii) A copy of State statutes, regulations, and requirements that contain the appropriate provisions granting authority to implement and enforce the State rule, program, or requirement upon approval.(iii) A demonstration that the State has adequate resources to implement and enforce all aspects of the rule, program, or requirement upon approval (except for authorities explicitly retained by the Administrator, such as those pursuant to paragraph (f) of this section or pursuant to part 49 of this chapter), which includes:(B) A description of the organization and structure of the agency or agencies that will have responsibility for administering the program.(C) A description of the agency's capacity to carry out the State program, including the number, occupation, and general duties of the employees.(iv) A schedule demonstrating expeditious State implementation of the rule, program, or requirement upon approval.(v) A plan that assures expeditious compliance by all sources subject to the State rule, program, or requirement upon approval. The plan should include, at a minimum, a complete description of the State's compliance tracking and enforcement program, including but not limited to inspection strategies.
Citations to §63.91(d)(3)(v)
-
(1) Use of a continuous emission monitoring system (CEMS) in lieu of a parameter monitoring approach;
-
(3) Interim or final title V program approval will satisfy the criteria set forth in § 63.91(d), up-front approval criteria. Alternatively, the State must provide the following items in paragraphs (d)(3)(i) through (v) of this section to the Administrator:(i) A written finding by the State Attorney General (or for a local agency or tribal authority, the General Counsel with full authority to represent the local agency or tribal authority) that the State has the necessary legal authority to implement and to enforce the State rule, program, or requirement upon approval and to assure compliance by all sources within the State with each applicable section 112 rule, emission standard, or requirement. For full approval, the State must have the following legal authorities concerning enforcement and compliance assurance:(A) The State shall have enforcement authorities that meet the requirements of § 70.11 of this chapter, except that tribal authorities shall have enforcement authorities that meet the requirements of part 49 of this chapter, the Tribal Air Rule.(B) The State shall have authority to request information from regulated sources regarding their compliance status.(C) The State shall have authority to inspect sources and any records required to determine a source's compliance status.(D) If a State delegates authorities to a local agency, the State must retain enforcement authority unless the local agency has authorities that meet the requirements of § 70.11 of this chapter.(ii) A copy of State statutes, regulations, and requirements that contain the appropriate provisions granting authority to implement and enforce the State rule, program, or requirement upon approval.(iii) A demonstration that the State has adequate resources to implement and enforce all aspects of the rule, program, or requirement upon approval (except for authorities explicitly retained by the Administrator, such as those pursuant to paragraph (f) of this section or pursuant to part 49 of this chapter), which includes:(B) A description of the organization and structure of the agency or agencies that will have responsibility for administering the program.(C) A description of the agency's capacity to carry out the State program, including the number, occupation, and general duties of the employees.(iv) A schedule demonstrating expeditious State implementation of the rule, program, or requirement upon approval.(v) A plan that assures expeditious compliance by all sources subject to the State rule, program, or requirement upon approval. The plan should include, at a minimum, a complete description of the State's compliance tracking and enforcement program, including but not limited to inspection strategies.
Citations to §63.91(d)(v)
-
(3) Interim or final title V program approval will satisfy the criteria set forth in § 63.91(d), up-front approval criteria. Alternatively, the State must provide the following items in paragraphs (d)(3)(i) through (v) of this section to the Administrator:(i) A written finding by the State Attorney General (or for a local agency or tribal authority, the General Counsel with full authority to represent the local agency or tribal authority) that the State has the necessary legal authority to implement and to enforce the State rule, program, or requirement upon approval and to assure compliance by all sources within the State with each applicable section 112 rule, emission standard, or requirement. For full approval, the State must have the following legal authorities concerning enforcement and compliance assurance:(A) The State shall have enforcement authorities that meet the requirements of § 70.11 of this chapter, except that tribal authorities shall have enforcement authorities that meet the requirements of part 49 of this chapter, the Tribal Air Rule.(B) The State shall have authority to request information from regulated sources regarding their compliance status.(C) The State shall have authority to inspect sources and any records required to determine a source's compliance status.(D) If a State delegates authorities to a local agency, the State must retain enforcement authority unless the local agency has authorities that meet the requirements of § 70.11 of this chapter.(ii) A copy of State statutes, regulations, and requirements that contain the appropriate provisions granting authority to implement and enforce the State rule, program, or requirement upon approval.(iii) A demonstration that the State has adequate resources to implement and enforce all aspects of the rule, program, or requirement upon approval (except for authorities explicitly retained by the Administrator, such as those pursuant to paragraph (f) of this section or pursuant to part 49 of this chapter), which includes:(B) A description of the organization and structure of the agency or agencies that will have responsibility for administering the program.(C) A description of the agency's capacity to carry out the State program, including the number, occupation, and general duties of the employees.(iv) A schedule demonstrating expeditious State implementation of the rule, program, or requirement upon approval.(v) A plan that assures expeditious compliance by all sources subject to the State rule, program, or requirement upon approval. The plan should include, at a minimum, a complete description of the State's compliance tracking and enforcement program, including but not limited to inspection strategies.
Citations to §63.91(f)
-
(3) If the Administrator partially approves the State request per § 63.91(f), the State may submit a request for the remaining section 112 rules, emission standards, or requirements in that category under another section of this subpart.
Citations to §63.91(v)
-
(1) Use of a continuous emission monitoring system (CEMS) in lieu of a parameter monitoring approach;