US Codex
C.F.R.
Browse by date
Notes

§63.7912. What are my inspection and monitoring requirements for separators?

40 C.F.R. § 63.7912

(a)
If you use a floating roof according to § 63.7910(b)(1), you must meet requirements in paragraphs (a)(1) and (2) of this section.
(1)
Measure the seal gaps at least annually according to the requirements in § 63.1047(b)(1).
(2)
Visually inspect the floating roof at least annually according to the requirements in § 63.1047(b)(2).
(b)
If you use a cover vented to a control device according to § 63.7910(b)(1) or (2), you must meet requirements in paragraphs (b)(1) and (2) of this section.
(1)
You must visually inspect the cover and its closure devices for defects according to the requirements in § 63.1047(c).
(2)
You must monitor and inspect the closed vent system and control device according to the requirements in § 63.7927 that apply to you.
(c)
If you use a pressurized separator that operates as a closed system according to § 63.7910(b)(3), you must visually inspect each pressurized separator and closure devices for defects at least annually to ensure they are operating according to the design requirements in § 63.1045(b), with the exceptions specified in § 63.7910(b)(3).
Notes, amendments, and revision history

Amendments

[68 FR 58190, Oct. 8, 2003, as amended at 85 FR 41705, July 10, 2020]

Source

Source: 68 FR 58190, Oct. 8, 2003, unless otherwise noted.

Authority

Authority: 42 U.S.C. 7401 et seq.

Source

Source: 57 FR 61992, Dec. 29, 1992, unless otherwise noted.

Amendments

[68 FR 58190, Oct. 8, 2003, as amended at 85 FR 41705, July 10, 2020]