§63.7825. What test methods and other procedures must I use to demonstrate initial compliance with the emission limits for hazardous air pollutants? — Inbound Citations

40 C.F.R. § 63.7825

Cited by 30 regulations in release Current.

Citations to 40 C.F.R. § 63.7825 as a whole

  • (g) If you have an affected source for which construction or reconstruction commenced on or before July 31, 2023, each sinter plant windbox, BF casthouse, BF stove, primary emission control system for a BOPF, and fugitive and intermittent particulate source at your facility must be in compliance with the applicable emission limits in table 1 to this subpart through performance testing under § 63.7825 and work practice standards in § 63.7793 by April 3, 2027.
  • (1) If you have an existing affected source or a new or reconstructed affected source for which construction or reconstruction commenced on or before August 16, 2019, each BOPF Group at your facility must be in compliance with the applicable mercury emission limit in Table 1 of this subpart through performance testing under §§ 63.7825 and 63.7833, or through procurement of steel scrap pursuant to the compliance options in § 63.7791(c), (d), or (e) beginning July 13, 2021.
  • (e) For each BOPF Group, if demonstrating compliance with the mercury emission limit in table 1 to this subpart through performance testing under §§ 63.7825 and 63.7833, you must conduct subsequent performance tests twice per permit cycle (i.e., mid-term and initial/final) for sources with title V operating permits, and every 2.5 years for sources without a title V operating permit, at the outlet of the control devices for the BOPF Group.
  • (h) If you are demonstrating compliance with the mercury emission limits in Table 1 of this section for your BOPF Groups through performance testing, you must conduct mercury performance tests in accordance with §§ 63.7821(e) and 63.7825 and calculate the emissions from each new and existing affected source in pounds of mercury per ton of steel scrap to determine compliance with the mercury emission limits in Table 1. Sum the mercury mass emissions (in pounds) from all BOPF Group units calculated using Equation 1 of § 63.7825. Divide that sum by the sum of the total amount of steel scrap charged to the BOPFs (in tons).

Citations to §63.7825(b)

  • (a) If demonstrating compliance with the emission limits in Table 1 to this subpart through performance testing, you must conduct a performance test to demonstrate initial compliance with the emission limit. If demonstrating compliance with the emission limit through performance testing, you must conduct each performance test that applies to your affected source based on representative performance (i.e., performance based on normal operating conditions) of the affected source for the period being tested, according to the conditions detailed in paragraphs (b) through (k) of this section. Representative conditions exclude periods of startup and shutdown. You shall not conduct performance tests during periods of malfunction. Initial compliance tests must be conducted by the deadlines in § 63.7820(e).
    (1) You must record the process information that is necessary to document operating conditions during the test and include in such record an explanation to support that such conditions represent normal operation. Upon request, you shall make available to the Administrator such records as may be necessary to determine the conditions of performance tests.
    (2) For sources with multiple emission units ducted to a common control device and stack, compliance testing must be performed either by conducting a single compliance test with all affected emissions units in operation or by conducting a separate compliance test on each emissions unit. Alternatively, the owner or operator may request approval from the permit authority for an alternative testing approach. If the units are tested separately, any emissions unit that is not tested initially must be tested as soon as is practicable.

Citations to §63.7825(b)(1)(i)

Citations to §63.7825(b)(1)(ii)

Citations to §63.7825(b)(1)(iii)

Citations to §63.7825(b)(1)(iv)

Citations to §63.7825(c)

  • (a) If demonstrating compliance with the emission limits in Table 1 to this subpart through performance testing, you must conduct a performance test to demonstrate initial compliance with the emission limit. If demonstrating compliance with the emission limit through performance testing, you must conduct each performance test that applies to your affected source based on representative performance (i.e., performance based on normal operating conditions) of the affected source for the period being tested, according to the conditions detailed in paragraphs (b) through (k) of this section. Representative conditions exclude periods of startup and shutdown. You shall not conduct performance tests during periods of malfunction. Initial compliance tests must be conducted by the deadlines in § 63.7820(e).
    (1) You must record the process information that is necessary to document operating conditions during the test and include in such record an explanation to support that such conditions represent normal operation. Upon request, you shall make available to the Administrator such records as may be necessary to determine the conditions of performance tests.
    (2) For sources with multiple emission units ducted to a common control device and stack, compliance testing must be performed either by conducting a single compliance test with all affected emissions units in operation or by conducting a separate compliance test on each emissions unit. Alternatively, the owner or operator may request approval from the permit authority for an alternative testing approach. If the units are tested separately, any emissions unit that is not tested initially must be tested as soon as is practicable.

Citations to §63.7825(d)

  • (a) If demonstrating compliance with the emission limits in Table 1 to this subpart through performance testing, you must conduct a performance test to demonstrate initial compliance with the emission limit. If demonstrating compliance with the emission limit through performance testing, you must conduct each performance test that applies to your affected source based on representative performance (i.e., performance based on normal operating conditions) of the affected source for the period being tested, according to the conditions detailed in paragraphs (b) through (k) of this section. Representative conditions exclude periods of startup and shutdown. You shall not conduct performance tests during periods of malfunction. Initial compliance tests must be conducted by the deadlines in § 63.7820(e).
    (1) You must record the process information that is necessary to document operating conditions during the test and include in such record an explanation to support that such conditions represent normal operation. Upon request, you shall make available to the Administrator such records as may be necessary to determine the conditions of performance tests.
    (2) For sources with multiple emission units ducted to a common control device and stack, compliance testing must be performed either by conducting a single compliance test with all affected emissions units in operation or by conducting a separate compliance test on each emissions unit. Alternatively, the owner or operator may request approval from the permit authority for an alternative testing approach. If the units are tested separately, any emissions unit that is not tested initially must be tested as soon as is practicable.

Citations to §63.7825(e)

  • (a) If demonstrating compliance with the emission limits in Table 1 to this subpart through performance testing, you must conduct a performance test to demonstrate initial compliance with the emission limit. If demonstrating compliance with the emission limit through performance testing, you must conduct each performance test that applies to your affected source based on representative performance (i.e., performance based on normal operating conditions) of the affected source for the period being tested, according to the conditions detailed in paragraphs (b) through (k) of this section. Representative conditions exclude periods of startup and shutdown. You shall not conduct performance tests during periods of malfunction. Initial compliance tests must be conducted by the deadlines in § 63.7820(e).
    (1) You must record the process information that is necessary to document operating conditions during the test and include in such record an explanation to support that such conditions represent normal operation. Upon request, you shall make available to the Administrator such records as may be necessary to determine the conditions of performance tests.
    (2) For sources with multiple emission units ducted to a common control device and stack, compliance testing must be performed either by conducting a single compliance test with all affected emissions units in operation or by conducting a separate compliance test on each emissions unit. Alternatively, the owner or operator may request approval from the permit authority for an alternative testing approach. If the units are tested separately, any emissions unit that is not tested initially must be tested as soon as is practicable.

Citations to §63.7825(f)

  • (a) If demonstrating compliance with the emission limits in Table 1 to this subpart through performance testing, you must conduct a performance test to demonstrate initial compliance with the emission limit. If demonstrating compliance with the emission limit through performance testing, you must conduct each performance test that applies to your affected source based on representative performance (i.e., performance based on normal operating conditions) of the affected source for the period being tested, according to the conditions detailed in paragraphs (b) through (k) of this section. Representative conditions exclude periods of startup and shutdown. You shall not conduct performance tests during periods of malfunction. Initial compliance tests must be conducted by the deadlines in § 63.7820(e).
    (1) You must record the process information that is necessary to document operating conditions during the test and include in such record an explanation to support that such conditions represent normal operation. Upon request, you shall make available to the Administrator such records as may be necessary to determine the conditions of performance tests.
    (2) For sources with multiple emission units ducted to a common control device and stack, compliance testing must be performed either by conducting a single compliance test with all affected emissions units in operation or by conducting a separate compliance test on each emissions unit. Alternatively, the owner or operator may request approval from the permit authority for an alternative testing approach. If the units are tested separately, any emissions unit that is not tested initially must be tested as soon as is practicable.

Citations to §63.7825(g)

  • (a) If demonstrating compliance with the emission limits in Table 1 to this subpart through performance testing, you must conduct a performance test to demonstrate initial compliance with the emission limit. If demonstrating compliance with the emission limit through performance testing, you must conduct each performance test that applies to your affected source based on representative performance (i.e., performance based on normal operating conditions) of the affected source for the period being tested, according to the conditions detailed in paragraphs (b) through (k) of this section. Representative conditions exclude periods of startup and shutdown. You shall not conduct performance tests during periods of malfunction. Initial compliance tests must be conducted by the deadlines in § 63.7820(e).
    (1) You must record the process information that is necessary to document operating conditions during the test and include in such record an explanation to support that such conditions represent normal operation. Upon request, you shall make available to the Administrator such records as may be necessary to determine the conditions of performance tests.
    (2) For sources with multiple emission units ducted to a common control device and stack, compliance testing must be performed either by conducting a single compliance test with all affected emissions units in operation or by conducting a separate compliance test on each emissions unit. Alternatively, the owner or operator may request approval from the permit authority for an alternative testing approach. If the units are tested separately, any emissions unit that is not tested initially must be tested as soon as is practicable.

Citations to §63.7825(g)(1)

  • (g) To demonstrate compliance with the emission limit for hydrogen chloride in table 1 to this subpart through performance testing, follow the test methods and procedures in paragraphs (g)(1) through (3) of this section.
    (i) The methods specified in paragraphs (b)(1)(i) through (iv) of this section, and
    (ii) EPA Method 26A in appendix A-8 to part 60 of this chapter to determine the concentration of hydrogen chloride from the exhaust stream stack of each unit, with the following conditions; or
    (B) [Reserved]
    (iii) EPA Method 320 in appendix A to this part to determine the concentration of hydrogen chloride and hydrogen fluoride from the exhaust stream stack of each unit. Alternatively, ASTM D6348-12(R2020), (incorporated by reference, see § 63.14) may be used with the following conditions:
    (A) The test plan preparation and implementation in the Annexes to ASTM D 6348-12(R2020), Annexes A1 through A8 are mandatory; and
    (B) In ASTM D6348-12(R2020) Annex A5 (Analyte Spiking Technique), the percent (%) R must be determined for each target analyte (Equation A5.5). In order for the test data to be acceptable for a compound, %R must be 70% ≥ R ≤ 130%. If the %R value does not meet this criterion for a target compound, the test data is not acceptable for that compound and the test must be repeated for that analyte (i.e., the sampling and/or analytical procedure should be adjusted before a retest). The %R value for each compound must be reported in the test report, and all field measurements must be corrected with the calculated %R value for that compound by using the equation 2 o to this paragraph (g)(1)(iii)(B) as follows:
    (2) At least three valid test runs are needed to comprise a performance test of each unit in table 1 to this subpart. If the performance testing results for any of the emission points yields a non-detect value, then the MDL must be used to calculate the mass emissions (lb) for that unit and, in turn, for calculating the emissions rate (lb/ton of product sinter, lb/ton of iron, or lb/ton of steel).
    (3) Calculate the emissions from each new and existing affected source in pounds of hydrogen chloride per ton of throughput processed or unit of energy (tons of product sinter, tons of iron, tons of steel, or MMBtu) to determine initial compliance with the emission limits in table 1 to this subpart.

Citations to §63.7825(g)(2)

  • (g) To demonstrate compliance with the emission limit for hydrogen chloride in table 1 to this subpart through performance testing, follow the test methods and procedures in paragraphs (g)(1) through (3) of this section.
    (i) The methods specified in paragraphs (b)(1)(i) through (iv) of this section, and
    (ii) EPA Method 26A in appendix A-8 to part 60 of this chapter to determine the concentration of hydrogen chloride from the exhaust stream stack of each unit, with the following conditions; or
    (B) [Reserved]
    (iii) EPA Method 320 in appendix A to this part to determine the concentration of hydrogen chloride and hydrogen fluoride from the exhaust stream stack of each unit. Alternatively, ASTM D6348-12(R2020), (incorporated by reference, see § 63.14) may be used with the following conditions:
    (A) The test plan preparation and implementation in the Annexes to ASTM D 6348-12(R2020), Annexes A1 through A8 are mandatory; and
    (B) In ASTM D6348-12(R2020) Annex A5 (Analyte Spiking Technique), the percent (%) R must be determined for each target analyte (Equation A5.5). In order for the test data to be acceptable for a compound, %R must be 70% ≥ R ≤ 130%. If the %R value does not meet this criterion for a target compound, the test data is not acceptable for that compound and the test must be repeated for that analyte (i.e., the sampling and/or analytical procedure should be adjusted before a retest). The %R value for each compound must be reported in the test report, and all field measurements must be corrected with the calculated %R value for that compound by using the equation 2 o to this paragraph (g)(1)(iii)(B) as follows:
    (2) At least three valid test runs are needed to comprise a performance test of each unit in table 1 to this subpart. If the performance testing results for any of the emission points yields a non-detect value, then the MDL must be used to calculate the mass emissions (lb) for that unit and, in turn, for calculating the emissions rate (lb/ton of product sinter, lb/ton of iron, or lb/ton of steel).
    (3) Calculate the emissions from each new and existing affected source in pounds of hydrogen chloride per ton of throughput processed or unit of energy (tons of product sinter, tons of iron, tons of steel, or MMBtu) to determine initial compliance with the emission limits in table 1 to this subpart.

Citations to §63.7825(g)(3)

  • (g) To demonstrate compliance with the emission limit for hydrogen chloride in table 1 to this subpart through performance testing, follow the test methods and procedures in paragraphs (g)(1) through (3) of this section.
    (i) The methods specified in paragraphs (b)(1)(i) through (iv) of this section, and
    (ii) EPA Method 26A in appendix A-8 to part 60 of this chapter to determine the concentration of hydrogen chloride from the exhaust stream stack of each unit, with the following conditions; or
    (B) [Reserved]
    (iii) EPA Method 320 in appendix A to this part to determine the concentration of hydrogen chloride and hydrogen fluoride from the exhaust stream stack of each unit. Alternatively, ASTM D6348-12(R2020), (incorporated by reference, see § 63.14) may be used with the following conditions:
    (A) The test plan preparation and implementation in the Annexes to ASTM D 6348-12(R2020), Annexes A1 through A8 are mandatory; and
    (B) In ASTM D6348-12(R2020) Annex A5 (Analyte Spiking Technique), the percent (%) R must be determined for each target analyte (Equation A5.5). In order for the test data to be acceptable for a compound, %R must be 70% ≥ R ≤ 130%. If the %R value does not meet this criterion for a target compound, the test data is not acceptable for that compound and the test must be repeated for that analyte (i.e., the sampling and/or analytical procedure should be adjusted before a retest). The %R value for each compound must be reported in the test report, and all field measurements must be corrected with the calculated %R value for that compound by using the equation 2 o to this paragraph (g)(1)(iii)(B) as follows:
    (2) At least three valid test runs are needed to comprise a performance test of each unit in table 1 to this subpart. If the performance testing results for any of the emission points yields a non-detect value, then the MDL must be used to calculate the mass emissions (lb) for that unit and, in turn, for calculating the emissions rate (lb/ton of product sinter, lb/ton of iron, or lb/ton of steel).
    (3) Calculate the emissions from each new and existing affected source in pounds of hydrogen chloride per ton of throughput processed or unit of energy (tons of product sinter, tons of iron, tons of steel, or MMBtu) to determine initial compliance with the emission limits in table 1 to this subpart.

Citations to §63.7825(h)

  • (a) If demonstrating compliance with the emission limits in Table 1 to this subpart through performance testing, you must conduct a performance test to demonstrate initial compliance with the emission limit. If demonstrating compliance with the emission limit through performance testing, you must conduct each performance test that applies to your affected source based on representative performance (i.e., performance based on normal operating conditions) of the affected source for the period being tested, according to the conditions detailed in paragraphs (b) through (k) of this section. Representative conditions exclude periods of startup and shutdown. You shall not conduct performance tests during periods of malfunction. Initial compliance tests must be conducted by the deadlines in § 63.7820(e).
    (1) You must record the process information that is necessary to document operating conditions during the test and include in such record an explanation to support that such conditions represent normal operation. Upon request, you shall make available to the Administrator such records as may be necessary to determine the conditions of performance tests.
    (2) For sources with multiple emission units ducted to a common control device and stack, compliance testing must be performed either by conducting a single compliance test with all affected emissions units in operation or by conducting a separate compliance test on each emissions unit. Alternatively, the owner or operator may request approval from the permit authority for an alternative testing approach. If the units are tested separately, any emissions unit that is not tested initially must be tested as soon as is practicable.

Citations to §63.7825(h)(1)

  • (h) To demonstrate compliance with the emission limit for carbonyl sulfide in table 1 to this subpart through performance testing, follow the test methods and procedures in paragraphs (h)(1) through (3) of this section.
    (i) The methods specified in paragraphs (b)(1)(i) through (iv) of this section, and
    (ii) EPA Method 15 in appendix A-5 to part 60 of this chapter to determine the concentration of carbonyl sulfide from the exhaust stream stack of each unit; or
    (iii) EPA Method 320 in appendix A to this part to determine the concentration of carbon disulfide and carbonyl sulfide from the exhaust stream stack of each unit. Alternatively, ASTM D6348-12 (R2020), (incorporated by reference, see § 63.14) may be used with the following conditions:
    (A) The test plan preparation and implementation in the Annexes to ASTM D 6348-12 (R2020), Annexes A1 through A8 are mandatory; and
    (B) In ASTM D6348-12 (R2020) Annex A5 (Analyte Spiking Technique), the percent (%) R must be determined for each target analyte (Equation A5.5). In order for the test data to be acceptable for a compound, %R must be 70% ≥ R ≤ 130%. If the %R value does not meet this criterion for a target compound, the test data is not acceptable for that compound and the test must be repeated for that analyte (i.e., the sampling and/or analytical procedure should be adjusted before a retest). The %R value for each compound must be reported in the test report, and all field measurements must be corrected with the calculated %R value for that compound by using the Equation 2 of this section.
    (2) Three valid test runs at least one hour in duration are needed to comprise a performance test of each unit in table 1 to this subpart. If the performance testing results for any of the emission points yields a non-detect value, then the MDL must be used to calculate the mass emissions (lb) for that unit and, in turn, for calculating the emissions rate (lb/ton of product sinter).
    (3) Calculate the emissions from each new and existing affected source in pounds of carbonyl sulfide per ton of product sinter to determine initial compliance with the emission limits in table 1 to this subpart .
    (i) To demonstrate compliance with the emission limit for total hydrocarbons in table 1 to this subpart through performance testing, follow the test methods and procedures in paragraphs (i)(1) through (5) of this section.
    (i) The methods specified in paragraphs (b)(1)(i) through (iv) of this section, and
    (ii) EPA Method 25A in appendix A-7 to part 60 of this chapter to determine the concentration of total hydrocarbons as propane from the exhaust stream stack of each unit.
    (2) Three valid test runs at least one hour in duration are needed to comprise a performance test of each unit in table 1 to this subpart. If the performance testing results for any of the emission points yields a non-detect value, then the MDL must be used to calculate the mass emissions (lb) for that unit and, in turn, for calculating the emissions rate (lb/ton of iron or lb/ton of steel).
    (3) For BOPF tests, the test runs must include at least one full production cycle (from scrap charge to 3 minutes after slag is emptied from the vessel) for each run, except for BOPF with closed hood systems, where sampling should be performed only during the primary oxygen blow and only for 20 heat cycles.
    (4) For blast furnaces, each test run duration must be a minimum of 1 hour.
    (5) Calculate the emissions from each new and existing affected source in pounds of total hydrocarbons as propane per ton of throughput processed or unit of energy (tons of iron, tons of steel, or MMBtu) to determine initial compliance with the emission limits in table 1 to this subpart.

Citations to §63.7825(h)(2)

  • (h) To demonstrate compliance with the emission limit for carbonyl sulfide in table 1 to this subpart through performance testing, follow the test methods and procedures in paragraphs (h)(1) through (3) of this section.
    (i) The methods specified in paragraphs (b)(1)(i) through (iv) of this section, and
    (ii) EPA Method 15 in appendix A-5 to part 60 of this chapter to determine the concentration of carbonyl sulfide from the exhaust stream stack of each unit; or
    (iii) EPA Method 320 in appendix A to this part to determine the concentration of carbon disulfide and carbonyl sulfide from the exhaust stream stack of each unit. Alternatively, ASTM D6348-12 (R2020), (incorporated by reference, see § 63.14) may be used with the following conditions:
    (A) The test plan preparation and implementation in the Annexes to ASTM D 6348-12 (R2020), Annexes A1 through A8 are mandatory; and
    (B) In ASTM D6348-12 (R2020) Annex A5 (Analyte Spiking Technique), the percent (%) R must be determined for each target analyte (Equation A5.5). In order for the test data to be acceptable for a compound, %R must be 70% ≥ R ≤ 130%. If the %R value does not meet this criterion for a target compound, the test data is not acceptable for that compound and the test must be repeated for that analyte (i.e., the sampling and/or analytical procedure should be adjusted before a retest). The %R value for each compound must be reported in the test report, and all field measurements must be corrected with the calculated %R value for that compound by using the Equation 2 of this section.
    (2) Three valid test runs at least one hour in duration are needed to comprise a performance test of each unit in table 1 to this subpart. If the performance testing results for any of the emission points yields a non-detect value, then the MDL must be used to calculate the mass emissions (lb) for that unit and, in turn, for calculating the emissions rate (lb/ton of product sinter).
    (3) Calculate the emissions from each new and existing affected source in pounds of carbonyl sulfide per ton of product sinter to determine initial compliance with the emission limits in table 1 to this subpart .
    (i) To demonstrate compliance with the emission limit for total hydrocarbons in table 1 to this subpart through performance testing, follow the test methods and procedures in paragraphs (i)(1) through (5) of this section.
    (i) The methods specified in paragraphs (b)(1)(i) through (iv) of this section, and
    (ii) EPA Method 25A in appendix A-7 to part 60 of this chapter to determine the concentration of total hydrocarbons as propane from the exhaust stream stack of each unit.
    (2) Three valid test runs at least one hour in duration are needed to comprise a performance test of each unit in table 1 to this subpart. If the performance testing results for any of the emission points yields a non-detect value, then the MDL must be used to calculate the mass emissions (lb) for that unit and, in turn, for calculating the emissions rate (lb/ton of iron or lb/ton of steel).
    (3) For BOPF tests, the test runs must include at least one full production cycle (from scrap charge to 3 minutes after slag is emptied from the vessel) for each run, except for BOPF with closed hood systems, where sampling should be performed only during the primary oxygen blow and only for 20 heat cycles.
    (4) For blast furnaces, each test run duration must be a minimum of 1 hour.
    (5) Calculate the emissions from each new and existing affected source in pounds of total hydrocarbons as propane per ton of throughput processed or unit of energy (tons of iron, tons of steel, or MMBtu) to determine initial compliance with the emission limits in table 1 to this subpart.

Citations to §63.7825(h)(3)

  • (h) To demonstrate compliance with the emission limit for carbonyl sulfide in table 1 to this subpart through performance testing, follow the test methods and procedures in paragraphs (h)(1) through (3) of this section.
    (i) The methods specified in paragraphs (b)(1)(i) through (iv) of this section, and
    (ii) EPA Method 15 in appendix A-5 to part 60 of this chapter to determine the concentration of carbonyl sulfide from the exhaust stream stack of each unit; or
    (iii) EPA Method 320 in appendix A to this part to determine the concentration of carbon disulfide and carbonyl sulfide from the exhaust stream stack of each unit. Alternatively, ASTM D6348-12 (R2020), (incorporated by reference, see § 63.14) may be used with the following conditions:
    (A) The test plan preparation and implementation in the Annexes to ASTM D 6348-12 (R2020), Annexes A1 through A8 are mandatory; and
    (B) In ASTM D6348-12 (R2020) Annex A5 (Analyte Spiking Technique), the percent (%) R must be determined for each target analyte (Equation A5.5). In order for the test data to be acceptable for a compound, %R must be 70% ≥ R ≤ 130%. If the %R value does not meet this criterion for a target compound, the test data is not acceptable for that compound and the test must be repeated for that analyte (i.e., the sampling and/or analytical procedure should be adjusted before a retest). The %R value for each compound must be reported in the test report, and all field measurements must be corrected with the calculated %R value for that compound by using the Equation 2 of this section.
    (2) Three valid test runs at least one hour in duration are needed to comprise a performance test of each unit in table 1 to this subpart. If the performance testing results for any of the emission points yields a non-detect value, then the MDL must be used to calculate the mass emissions (lb) for that unit and, in turn, for calculating the emissions rate (lb/ton of product sinter).
    (3) Calculate the emissions from each new and existing affected source in pounds of carbonyl sulfide per ton of product sinter to determine initial compliance with the emission limits in table 1 to this subpart .
    (i) To demonstrate compliance with the emission limit for total hydrocarbons in table 1 to this subpart through performance testing, follow the test methods and procedures in paragraphs (i)(1) through (5) of this section.
    (i) The methods specified in paragraphs (b)(1)(i) through (iv) of this section, and
    (ii) EPA Method 25A in appendix A-7 to part 60 of this chapter to determine the concentration of total hydrocarbons as propane from the exhaust stream stack of each unit.
    (2) Three valid test runs at least one hour in duration are needed to comprise a performance test of each unit in table 1 to this subpart. If the performance testing results for any of the emission points yields a non-detect value, then the MDL must be used to calculate the mass emissions (lb) for that unit and, in turn, for calculating the emissions rate (lb/ton of iron or lb/ton of steel).
    (3) For BOPF tests, the test runs must include at least one full production cycle (from scrap charge to 3 minutes after slag is emptied from the vessel) for each run, except for BOPF with closed hood systems, where sampling should be performed only during the primary oxygen blow and only for 20 heat cycles.
    (4) For blast furnaces, each test run duration must be a minimum of 1 hour.
    (5) Calculate the emissions from each new and existing affected source in pounds of total hydrocarbons as propane per ton of throughput processed or unit of energy (tons of iron, tons of steel, or MMBtu) to determine initial compliance with the emission limits in table 1 to this subpart.

Citations to §63.7825(j)

  • (a) If demonstrating compliance with the emission limits in Table 1 to this subpart through performance testing, you must conduct a performance test to demonstrate initial compliance with the emission limit. If demonstrating compliance with the emission limit through performance testing, you must conduct each performance test that applies to your affected source based on representative performance (i.e., performance based on normal operating conditions) of the affected source for the period being tested, according to the conditions detailed in paragraphs (b) through (k) of this section. Representative conditions exclude periods of startup and shutdown. You shall not conduct performance tests during periods of malfunction. Initial compliance tests must be conducted by the deadlines in § 63.7820(e).
    (1) You must record the process information that is necessary to document operating conditions during the test and include in such record an explanation to support that such conditions represent normal operation. Upon request, you shall make available to the Administrator such records as may be necessary to determine the conditions of performance tests.
    (2) For sources with multiple emission units ducted to a common control device and stack, compliance testing must be performed either by conducting a single compliance test with all affected emissions units in operation or by conducting a separate compliance test on each emissions unit. Alternatively, the owner or operator may request approval from the permit authority for an alternative testing approach. If the units are tested separately, any emissions unit that is not tested initially must be tested as soon as is practicable.

Citations to §63.7825(j)(1)

  • (j) To demonstrate compliance with the emission limit for D/F TEQ in table 1 to this subpart through performance testing, follow the test methods and procedures in paragraphs (j)(1) through (4) of this section.
    (1) Determine the concentration of each dioxin and furan listed in table 5 to this subpart according to the following test methods:
    (i) The methods specified in paragraphs (b)(1)(i) through (iv) of this section, and
    (ii) EPA Method 23 in appendix A-7 to part 60 of this chapter to determine the concentration of each dioxin and furan listed in table 5 to this subpart from the exhaust stream stack of each unit. You must collect a minimum sample volume of 105 dscf (3 dscm) of gas during each test run.
    (2) Three valid test runs are needed to comprise a performance test of each unit in table 1 to this subpart. For determination of TEQ, zero may be used in subsequent calculations for values less than the estimated detection limit (EDL). For estimated maximum pollutant concentration (EMPC) results, when the value is greater than the EDL, the EMPC value must be used in determination of TEQ, when the EMPC is less than the EDL, zero may be used.
    (3) For BOPF tests, the test runs must include at least one full production cycle (from scrap charge to 3 minutes after slag is emptied from the vessel) for each run, except for BOPF with closed hood systems, where sampling should be performed only during the primary oxygen blow and only for 20 heat cycles or the collection of 105 dscf (3 dscm) sample volume, whichever is less.
    (4) Calculate the sum of the D/F TEQ per ton of throughput processed (tons of product sinter or tons of steel) to determine initial compliance with the emission limits in table 1 using equation 3 to this paragraph (j)(4) as follows:

Citations to §63.7825(j)(2)

  • (j) To demonstrate compliance with the emission limit for D/F TEQ in table 1 to this subpart through performance testing, follow the test methods and procedures in paragraphs (j)(1) through (4) of this section.
    (1) Determine the concentration of each dioxin and furan listed in table 5 to this subpart according to the following test methods:
    (i) The methods specified in paragraphs (b)(1)(i) through (iv) of this section, and
    (ii) EPA Method 23 in appendix A-7 to part 60 of this chapter to determine the concentration of each dioxin and furan listed in table 5 to this subpart from the exhaust stream stack of each unit. You must collect a minimum sample volume of 105 dscf (3 dscm) of gas during each test run.
    (2) Three valid test runs are needed to comprise a performance test of each unit in table 1 to this subpart. For determination of TEQ, zero may be used in subsequent calculations for values less than the estimated detection limit (EDL). For estimated maximum pollutant concentration (EMPC) results, when the value is greater than the EDL, the EMPC value must be used in determination of TEQ, when the EMPC is less than the EDL, zero may be used.
    (3) For BOPF tests, the test runs must include at least one full production cycle (from scrap charge to 3 minutes after slag is emptied from the vessel) for each run, except for BOPF with closed hood systems, where sampling should be performed only during the primary oxygen blow and only for 20 heat cycles or the collection of 105 dscf (3 dscm) sample volume, whichever is less.
    (4) Calculate the sum of the D/F TEQ per ton of throughput processed (tons of product sinter or tons of steel) to determine initial compliance with the emission limits in table 1 using equation 3 to this paragraph (j)(4) as follows:

Citations to §63.7825(j)(3)

  • (j) To demonstrate compliance with the emission limit for D/F TEQ in table 1 to this subpart through performance testing, follow the test methods and procedures in paragraphs (j)(1) through (4) of this section.
    (1) Determine the concentration of each dioxin and furan listed in table 5 to this subpart according to the following test methods:
    (i) The methods specified in paragraphs (b)(1)(i) through (iv) of this section, and
    (ii) EPA Method 23 in appendix A-7 to part 60 of this chapter to determine the concentration of each dioxin and furan listed in table 5 to this subpart from the exhaust stream stack of each unit. You must collect a minimum sample volume of 105 dscf (3 dscm) of gas during each test run.
    (2) Three valid test runs are needed to comprise a performance test of each unit in table 1 to this subpart. For determination of TEQ, zero may be used in subsequent calculations for values less than the estimated detection limit (EDL). For estimated maximum pollutant concentration (EMPC) results, when the value is greater than the EDL, the EMPC value must be used in determination of TEQ, when the EMPC is less than the EDL, zero may be used.
    (3) For BOPF tests, the test runs must include at least one full production cycle (from scrap charge to 3 minutes after slag is emptied from the vessel) for each run, except for BOPF with closed hood systems, where sampling should be performed only during the primary oxygen blow and only for 20 heat cycles or the collection of 105 dscf (3 dscm) sample volume, whichever is less.
    (4) Calculate the sum of the D/F TEQ per ton of throughput processed (tons of product sinter or tons of steel) to determine initial compliance with the emission limits in table 1 using equation 3 to this paragraph (j)(4) as follows:

Citations to §63.7825(j)(4)

  • (j) To demonstrate compliance with the emission limit for D/F TEQ in table 1 to this subpart through performance testing, follow the test methods and procedures in paragraphs (j)(1) through (4) of this section.
    (1) Determine the concentration of each dioxin and furan listed in table 5 to this subpart according to the following test methods:
    (i) The methods specified in paragraphs (b)(1)(i) through (iv) of this section, and
    (ii) EPA Method 23 in appendix A-7 to part 60 of this chapter to determine the concentration of each dioxin and furan listed in table 5 to this subpart from the exhaust stream stack of each unit. You must collect a minimum sample volume of 105 dscf (3 dscm) of gas during each test run.
    (2) Three valid test runs are needed to comprise a performance test of each unit in table 1 to this subpart. For determination of TEQ, zero may be used in subsequent calculations for values less than the estimated detection limit (EDL). For estimated maximum pollutant concentration (EMPC) results, when the value is greater than the EDL, the EMPC value must be used in determination of TEQ, when the EMPC is less than the EDL, zero may be used.
    (3) For BOPF tests, the test runs must include at least one full production cycle (from scrap charge to 3 minutes after slag is emptied from the vessel) for each run, except for BOPF with closed hood systems, where sampling should be performed only during the primary oxygen blow and only for 20 heat cycles or the collection of 105 dscf (3 dscm) sample volume, whichever is less.
    (4) Calculate the sum of the D/F TEQ per ton of throughput processed (tons of product sinter or tons of steel) to determine initial compliance with the emission limits in table 1 using equation 3 to this paragraph (j)(4) as follows:

Citations to §63.7825(k)

  • (a) If demonstrating compliance with the emission limits in Table 1 to this subpart through performance testing, you must conduct a performance test to demonstrate initial compliance with the emission limit. If demonstrating compliance with the emission limit through performance testing, you must conduct each performance test that applies to your affected source based on representative performance (i.e., performance based on normal operating conditions) of the affected source for the period being tested, according to the conditions detailed in paragraphs (b) through (k) of this section. Representative conditions exclude periods of startup and shutdown. You shall not conduct performance tests during periods of malfunction. Initial compliance tests must be conducted by the deadlines in § 63.7820(e).
    (1) You must record the process information that is necessary to document operating conditions during the test and include in such record an explanation to support that such conditions represent normal operation. Upon request, you shall make available to the Administrator such records as may be necessary to determine the conditions of performance tests.
    (2) For sources with multiple emission units ducted to a common control device and stack, compliance testing must be performed either by conducting a single compliance test with all affected emissions units in operation or by conducting a separate compliance test on each emissions unit. Alternatively, the owner or operator may request approval from the permit authority for an alternative testing approach. If the units are tested separately, any emissions unit that is not tested initially must be tested as soon as is practicable.

Citations to §63.7825(k)(1)

  • (k) To demonstrate compliance with the emission limit for polycyclic aromatic hydrocarbons in table 1 to this subpart through performance testing, follow the test methods and procedures in paragraphs (k)(1) through (3) of this section.
    (1) Determine the concentration of each polycyclic aromatic hydrocarbon listed in table 6 to this subpart according to the following test methods:
    (i) The methods specified in paragraphs (b)(1)(i) through (iv) of this section, and
    (ii) EPA Method 23 in appendix A-7 to part 60 of this chapter to determine the concentration of each polycyclic aromatic hydrocarbon listed in table 6 to this subpart from the exhaust stream stack of each unit. You must collect a minimum sample volume of 105 dscf (3 dscm) of gas during each test run.
    (2) Three valid test runs are needed to comprise a performance test of each unit in table 1 to this subpart. If the performance testing results for any of the emission points yields a non-detect value, then the EDL must be used to calculate the mass emissions (lb) for that unit and, in turn, for calculating the emissions rate (lb/ton of product sinter).
    (3) Calculate the sum of polycyclic aromatic hydrocarbons per ton of product sinter to determine initial compliance with the emission limits in table 1 to this subpart using equation 4 to this paragraph (k)(3) as follows:

Citations to §63.7825(k)(2)

  • (k) To demonstrate compliance with the emission limit for polycyclic aromatic hydrocarbons in table 1 to this subpart through performance testing, follow the test methods and procedures in paragraphs (k)(1) through (3) of this section.
    (1) Determine the concentration of each polycyclic aromatic hydrocarbon listed in table 6 to this subpart according to the following test methods:
    (i) The methods specified in paragraphs (b)(1)(i) through (iv) of this section, and
    (ii) EPA Method 23 in appendix A-7 to part 60 of this chapter to determine the concentration of each polycyclic aromatic hydrocarbon listed in table 6 to this subpart from the exhaust stream stack of each unit. You must collect a minimum sample volume of 105 dscf (3 dscm) of gas during each test run.
    (2) Three valid test runs are needed to comprise a performance test of each unit in table 1 to this subpart. If the performance testing results for any of the emission points yields a non-detect value, then the EDL must be used to calculate the mass emissions (lb) for that unit and, in turn, for calculating the emissions rate (lb/ton of product sinter).
    (3) Calculate the sum of polycyclic aromatic hydrocarbons per ton of product sinter to determine initial compliance with the emission limits in table 1 to this subpart using equation 4 to this paragraph (k)(3) as follows:

Citations to §63.7825(k)(3)

  • (k) To demonstrate compliance with the emission limit for polycyclic aromatic hydrocarbons in table 1 to this subpart through performance testing, follow the test methods and procedures in paragraphs (k)(1) through (3) of this section.
    (1) Determine the concentration of each polycyclic aromatic hydrocarbon listed in table 6 to this subpart according to the following test methods:
    (i) The methods specified in paragraphs (b)(1)(i) through (iv) of this section, and
    (ii) EPA Method 23 in appendix A-7 to part 60 of this chapter to determine the concentration of each polycyclic aromatic hydrocarbon listed in table 6 to this subpart from the exhaust stream stack of each unit. You must collect a minimum sample volume of 105 dscf (3 dscm) of gas during each test run.
    (2) Three valid test runs are needed to comprise a performance test of each unit in table 1 to this subpart. If the performance testing results for any of the emission points yields a non-detect value, then the EDL must be used to calculate the mass emissions (lb) for that unit and, in turn, for calculating the emissions rate (lb/ton of product sinter).
    (3) Calculate the sum of polycyclic aromatic hydrocarbons per ton of product sinter to determine initial compliance with the emission limits in table 1 to this subpart using equation 4 to this paragraph (k)(3) as follows: