§63.7823. What test methods and other procedures must I use to demonstrate initial compliance with the opacity limits? — Inbound Citations
40 C.F.R. § 63.7823
Statutory Authority
Cited by 13 regulations in release Current.
Citations to 40 C.F.R. § 63.7823 as a whole
-
(d) You must keep the records required in §§ 63.7823, 63.7833, and 63.7834 to show continuous compliance with each emission limitation and operation and maintenance requirement that applies to you. This includes a record of each large and small bell repair and replacement, a record of the date on which the large bell opacity has exceeded 20 percent, and the most current time period or throughput over which no opacity was observed from the small bell. The requirements of this paragraph for records for large and small bells are stayed from April 2, 2025 to July 1, 2025.
Citations to §63.7823(b)
-
(a) For each discharge end of a sinter plant, sinter plant cooler, blast furnace casthouse, BOPF shop, and large bell on a blast furnace, you must conduct each performance test that applies to your affected source based on representative performance (i.e., performance based on normal operating conditions) of the affected source for the period being tested, according to the conditions detailed in paragraphs (b) through (d) of this section. Representative conditions exclude periods of startup and shutdown. You shall not conduct performance tests during periods of malfunction. You must record the process information that is necessary to document operating conditions during the test and include in such record an explanation to support that such conditions represent normal operation. Upon request, you shall make available to the Administrator such records as may be necessary to determine the conditions of performance tests.
Citations to §63.7823(c)
-
(111) ASTM D7520-16, Standard Test Method for Determining the Opacity of a Plume in the Outdoor Ambient Atmosphere, approved April 1, 2016; IBR approved for §§ 63.1450(c), (e), and (g); 63.1453(h); 63.1625(b); table 3 to subpart LLLLL; §§ 63.7823(c) through (f), 63.7833(g); 63.11423(c).
-
(a) For each discharge end of a sinter plant, sinter plant cooler, blast furnace casthouse, BOPF shop, and large bell on a blast furnace, you must conduct each performance test that applies to your affected source based on representative performance (i.e., performance based on normal operating conditions) of the affected source for the period being tested, according to the conditions detailed in paragraphs (b) through (d) of this section. Representative conditions exclude periods of startup and shutdown. You shall not conduct performance tests during periods of malfunction. You must record the process information that is necessary to document operating conditions during the test and include in such record an explanation to support that such conditions represent normal operation. Upon request, you shall make available to the Administrator such records as may be necessary to determine the conditions of performance tests.
Citations to §63.7823(d)
-
(111) ASTM D7520-16, Standard Test Method for Determining the Opacity of a Plume in the Outdoor Ambient Atmosphere, approved April 1, 2016; IBR approved for §§ 63.1450(c), (e), and (g); 63.1453(h); 63.1625(b); table 3 to subpart LLLLL; §§ 63.7823(c) through (f), 63.7833(g); 63.11423(c).
-
(a) For each discharge end of a sinter plant, sinter plant cooler, blast furnace casthouse, BOPF shop, and large bell on a blast furnace, you must conduct each performance test that applies to your affected source based on representative performance (i.e., performance based on normal operating conditions) of the affected source for the period being tested, according to the conditions detailed in paragraphs (b) through (d) of this section. Representative conditions exclude periods of startup and shutdown. You shall not conduct performance tests during periods of malfunction. You must record the process information that is necessary to document operating conditions during the test and include in such record an explanation to support that such conditions represent normal operation. Upon request, you shall make available to the Administrator such records as may be necessary to determine the conditions of performance tests.
Citations to §63.7823(d)(1)(i)
-
(i) Determine the opacity of emissions according to the requirements for an existing BOPF shop in paragraphs (d)(1)(i) through (iii) of this section.
Citations to §63.7823(d)(1)(ii)
-
(i) Determine the opacity of emissions according to the requirements for an existing BOPF shop in paragraphs (d)(1)(i) through (iii) of this section.
Citations to §63.7823(d)(1)(iii)
-
(i) Determine the opacity of emissions according to the requirements for an existing BOPF shop in paragraphs (d)(1)(i) through (iii) of this section.
Citations to §63.7823(d)(iii)
-
(i) Determine the opacity of emissions according to the requirements for an existing BOPF shop in paragraphs (d)(1)(i) through (iii) of this section.
Citations to §63.7823(e)
-
(111) ASTM D7520-16, Standard Test Method for Determining the Opacity of a Plume in the Outdoor Ambient Atmosphere, approved April 1, 2016; IBR approved for §§ 63.1450(c), (e), and (g); 63.1453(h); 63.1625(b); table 3 to subpart LLLLL; §§ 63.7823(c) through (f), 63.7833(g); 63.11423(c).
Citations to §63.7823(f)
-
(111) ASTM D7520-16, Standard Test Method for Determining the Opacity of a Plume in the Outdoor Ambient Atmosphere, approved April 1, 2016; IBR approved for §§ 63.1450(c), (e), and (g); 63.1453(h); 63.1625(b); table 3 to subpart LLLLL; §§ 63.7823(c) through (f), 63.7833(g); 63.11423(c).
-
(i) For planned bleeder valve openings on each blast furnace, you must conduct opacity tests according to § 63.7823(f) for each planned opening.