§63.7083. When do I have to comply with this subpart? — Inbound Citations
40 C.F.R. § 63.7083
Statutory Authority
Cited by 9 regulations in release Current.
Citations to 40 U.S.C. § 63.7083 as a whole
-
(1) The first compliance report must cover the period beginning on the compliance date that is specified for your affected source in § 63.7083 and ending on June 30 or December 31, whichever date is the first date following the end of the first half calendar year after the compliance date that is specified for your source in § 63.7083.
Citations to §63.7083(g)
-
(c) On or after the relevant compliance date for your source as specified in § 63.7083(g), you must meet each startup and shutdown period emission limit in table 2 to this subpart that applies to you.
-
(a) Prior to the relevant compliance date for your source as specified in § 63.7083(g), you must be in compliance with the emission limitations (including operating limits) in this subpart at all times, except during periods of startup, shutdown, and malfunction. On and after the relevant compliance date for your source as specified in § 63.7083(g), you must be in compliance with the applicable emission limitations (including operating limits) at all times. You may operate outside of the established operating parameter limit(s) during performance tests in order to establish new operating limits.
-
(b) Prior to the relevant compliance date for your source as specified in § 63.7083(g), each performance test must be conducted according to the requirements in § 63.7(e)(1) and under the specific conditions specified in table 5 to this subpart. Beginning July 16, 2024, each performance test must include the methods specified in rows 19-24 of table 5 to this subpart. On and after the relevant compliance date for your source as specified in § 63.7083(g), each performance test must be conducted based on representative performance (i.e., performance based on normal operating conditions) of the affected source and under the specific conditions in table 5 to this subpart. Representative conditions exclude periods of startup and shutdown. The owner or operator may not conduct performance tests during periods of malfunction. The owner or operator must record the process information that is necessary to document operating conditions during the test and include in such record an explanation to support that such conditions represent normal operation. Upon request, the owner or operator shall make available to the Administrator such records as may be necessary to determine the conditions of performance tests.
-
(d) Prior to the relevant compliance date for your source as specified in § 63.7083(g), consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you demonstrate to the Administrator's satisfaction that you were operating in accordance with § 63.6(e)(1). The Administrator will determine whether deviations that occur during a period of startup, shutdown, or malfunction are violations, according to the provisions in § 63.6(e).
-
(e) If you are required to conduct a performance test, design evaluation, opacity observation, VE observation, or other initial compliance demonstration as specified in table 4 or 5 to this subpart, you must submit a Notification of Compliance Status according to § 63.9(h)(2)(ii). Beginning on the relevant compliance date for your source as specified in § 63.7083(g), submit all subsequent Notification of Compliance Status following the procedure specified in § 63.7131(h).(1) For each initial compliance demonstration required in Table 4 to this subpart that does not include a performance test, you must submit the Notification of Compliance Status before the close of business on the 30th calendar day following the completion of the initial compliance demonstration.(2) For each compliance demonstration required in Table 6 to this subpart that includes a performance test conducted according to the requirements in Table 5 to this subpart, you must submit the Notification of Compliance Status, including the performance test results, before the close of business on the 60th calendar day following the completion of the performance test according to § 63.10(d)(2).
-
(6) Beginning on the relevant compliance date for your source as specified in § 63.7083(g), submit all subsequent compliance reports following the procedure specified in paragraph (h) of this section.
-
(2) Prior to the relevant compliance date for your source as specified in § 63.7083(g), the records in § 63.6(e)(3)(iii) through (v) related to startup, shutdown, and malfunction. On and after the relevant compliance date for your source as specified in § 63.7083(g), the records in paragraphs (a)(2)(i) and (ii) of this section.(i) You must keep records for each startup period of the date, the time startup began, the time began producing on-specification lime product, and the time discharge from the kiln began for any affected source that is subject to a standard during startup that differs from the standard applicable at other times.(ii) You must keep records of the date, time, cause and duration of each malfunction (as defined in 40 CFR 63.2) that causes an affected source to fail to meet an applicable standard; if there was also a monitoring malfunction, the date, time, cause, and duration of the monitoring malfunction; the record must list the affected source or equipment; if there was a failure to meet a particulate matter emissions limit, an estimate of the volume of each regulated pollutant emitted over the limit, and a description of the method used to estimate the emissions.
-
(3) Prior to the relevant compliance date for your source as specified in § 63.7083(g), fails to meet any emission limitation (including any operating limit) in this subpart during startup, shutdown, or malfunction, regardless of whether or not such failure is allowed by this subpart.Dry sorbent injection (DSI) means an add-on air pollution control system in which sorbent (e.g., conventional activated carbon, brominated activated carbon, Trona, hydrated lime, sodium carbonate, etc.) is injected into the flue gas steam upstream of a PM control device to react with and neutralize acid gases (such as SO2 and HCl) or mercury in the exhaust stream forming a dry powder material that may be removed in a primary or secondary PM control device.Emission limitation means any emission limit, opacity limit, operating limit, or VE limit.Emission unit means a lime kiln, lime cooler, storage bin, conveying system transfer point, bulk loading or unloading operation, bucket elevator or belt conveyor at an LMP.Fugitive emission means PM that is not collected by a capture system.Hydrator means the device used to produce hydrated lime or calcium hydroxide via the chemical reaction of the lime product with water.Lime cooler means the device external to the lime kiln (or part of the lime kiln itself) used to reduce the temperature of the lime produced by the kiln.Lime kiln means the device, including any associated preheater, used to produce a lime product from stone feed by calcination. Kiln types include, but are not limited to, rotary kiln, vertical kiln, rotary hearth kiln, double-shaft vertical kiln, and fluidized bed kiln.Lime manufacturing plant (LMP) means any plant which uses a lime kiln to produce lime product from limestone or other calcareous material by calcination.Lime produced refers to the production of lime from the lime kiln consisting of high-calcium quick lime, dolomitic quick lime and/or dead burned dolomitic lime.Limestone means the material comprised primarily of calcium carbonate (referred to sometimes as calcitic or high calcium limestone), magnesium carbonate, and/or the double carbonate of both calcium and magnesium (referred to sometimes as dolomitic limestone or dolomite).Monovent means an exhaust configuration of a building or emission control device (e.g., positive pressure FF) that extends the length of the structure and has a width very small in relation to its length (i.e., length-to-width ratio is typically greater than 5:1). The exhaust may be an open vent with or without a roof, louvered vents, or a combination of such features.On-specification Lime Product means lime product that has been sufficiently calcined to meet end use requirements.Particulate matter (PM) detector means a system that is continuously capable of monitoring PM loading in the exhaust of FF or ESP in order to detect bag leaks, upset conditions, or control device malfunctions and sounds an alarm at a preset level. A PM detector system includes, but is not limited to, an instrument that operates on triboelectric, light scattering, light transmittance, or other effects to continuously monitor relative particulate loadings. A BLDS is a type of PM detector.Positive pressure FF or ESP means a FF or ESP with the fan(s) on the upstream side of the control device.Process stone handling operations means the equipment and transfer points between the equipment used to transport processed stone, and includes, storage bins, conveying system transfer points, bulk loading or unloading systems, screening operations, bucket elevators, and belt conveyors.Processed stone means limestone or other calcareous material that has been processed to a size suitable for feeding into a lime kiln.Screening operation means a device for separating material according to size by passing undersize material through one or more mesh surfaces (screens) in series and retaining oversize material on the mesh surfaces (screens).Shutdown means the cessation of kiln operation. Shutdown begins when feed to the kiln is reduced below planned production quantities and ends when stone feed is halted and fuel combustion from the main burner ceases.Stack emissions means the PM that is released to the atmosphere from a capture system or control device.Startup means the beginning of kiln operation. Startup begins when a shutdown kiln begins firing fuel in the main burner. Startup ends when the lime kiln first generates on-specification lime product or 12 hours following first discharge from the kiln, whichever is earlier.Storage bin means a manmade enclosure for storage (including surge bins) of processed stone prior to the lime kiln.TEQ means the international method of expressing toxicity equivalents for dioxins and furans as defined in EPA/100/R-10/005, December 2010 (incorporated by reference—see § 63.14). The TEFs used to determine the dioxin and furan TEQs are listed in table 11 to this subpart.Total Organic HAP means, for the purposes of this subpart, the sum of the concentrations of compounds of formaldehyde, acetaldehyde, toluene, benzene, m-xylene, p-xylene, o-xylene, styrene, ethyl benzene, and naphthalene as measured by EPA Test Method 320 or Method 18 of appendix A to this part or a combination of these methods, as appropriate. If measurement results for any pollutant are reported as below the method detection level (e.g., laboratory analytical results for one or more sample components are below the method defined analytical detection level), you must use the method detection level as the measured emissions level for that pollutant in calculating the total organic HAP value. The measured result for a multiple component analysis (e.g., analytical values for multiple Method 18 fractions) may include a combination of method detection level data and analytical data reported above the method detection level. The owner or operator of an affected source may request the use of other test methods to make this determination under § 63.7(e)(2)(ii) and (f).Transfer point means a point in a conveying operation where the material is transferred to or from a belt conveyor.Vent means an opening through which there is mechanically induced air flow for the purpose of exhausting from a building air carrying PM emissions from one or more emission units.