Citations to §63.548(a)

  • (b) You must submit the fugitive dust control standard operating procedures manual required under § 63.545(a) and the standard operating procedures manual for baghouses required under § 63.548(a) to the Administrator or delegated authority along with a notification that the smelter is seeking review and approval of these plans and procedures. You must submit this notification no later than January 7, 2013. For sources that commenced construction or reconstruction after January 5, 2012, you must submit this notification no later than 180 days before startup of the constructed or reconstructed secondary lead smelter, but no sooner than January 5, 2012. For an affected source that has received a construction permit from the Administrator or delegated authority on or before January 5, 2012, you must submit this notification no later than January 7, 2014.
  • (b) The standard operating procedures manuals required in §§ 63.545(a) and 63.548(a) must be submitted to the Administrator in electronic format for review and approval of the initial submittal and whenever an update is made to the procedure.

Citations to §63.548(c)

Citations to §63.548(c)(1)

  • (c) The procedures that you specify in the standard operating procedures manual for inspections and routine maintenance must, at a minimum, include the requirements of paragraphs (c)(1) through (9) of this section.
    (2) Weekly confirmation that dust is being removed from hoppers through visual inspection, or equivalent means of ensuring the proper functioning of removal mechanisms.
    (5) Monthly check of bag cleaning mechanisms for proper functioning through visual inspection or equivalent means.
    (6) Such checks are not required for shaker-type baghouses using self-tensioning (spring loaded) devices.
    (7) Quarterly confirmation of the physical integrity of the baghouse through visual inspection of the baghouse interior for air leaks.
    (8) Quarterly inspection of fans for wear, material buildup, and corrosion through visual inspection, vibration detectors, or equivalent means.
    (9) Except as provided in paragraphs (g) and (h) of this section, continuous operation of a bag leak detection system, unless a system meeting the requirements of paragraph (m) of this section for a continuous emissions monitoring system is installed for monitoring the concentration of lead.

Citations to §63.548(c)(2)

  • (c) The procedures that you specify in the standard operating procedures manual for inspections and routine maintenance must, at a minimum, include the requirements of paragraphs (c)(1) through (9) of this section.
    (2) Weekly confirmation that dust is being removed from hoppers through visual inspection, or equivalent means of ensuring the proper functioning of removal mechanisms.
    (5) Monthly check of bag cleaning mechanisms for proper functioning through visual inspection or equivalent means.
    (6) Such checks are not required for shaker-type baghouses using self-tensioning (spring loaded) devices.
    (7) Quarterly confirmation of the physical integrity of the baghouse through visual inspection of the baghouse interior for air leaks.
    (8) Quarterly inspection of fans for wear, material buildup, and corrosion through visual inspection, vibration detectors, or equivalent means.
    (9) Except as provided in paragraphs (g) and (h) of this section, continuous operation of a bag leak detection system, unless a system meeting the requirements of paragraph (m) of this section for a continuous emissions monitoring system is installed for monitoring the concentration of lead.

Citations to §63.548(c)(3)

  • (c) The procedures that you specify in the standard operating procedures manual for inspections and routine maintenance must, at a minimum, include the requirements of paragraphs (c)(1) through (9) of this section.
    (2) Weekly confirmation that dust is being removed from hoppers through visual inspection, or equivalent means of ensuring the proper functioning of removal mechanisms.
    (5) Monthly check of bag cleaning mechanisms for proper functioning through visual inspection or equivalent means.
    (6) Such checks are not required for shaker-type baghouses using self-tensioning (spring loaded) devices.
    (7) Quarterly confirmation of the physical integrity of the baghouse through visual inspection of the baghouse interior for air leaks.
    (8) Quarterly inspection of fans for wear, material buildup, and corrosion through visual inspection, vibration detectors, or equivalent means.
    (9) Except as provided in paragraphs (g) and (h) of this section, continuous operation of a bag leak detection system, unless a system meeting the requirements of paragraph (m) of this section for a continuous emissions monitoring system is installed for monitoring the concentration of lead.

Citations to §63.548(c)(4)

  • (c) The procedures that you specify in the standard operating procedures manual for inspections and routine maintenance must, at a minimum, include the requirements of paragraphs (c)(1) through (9) of this section.
    (2) Weekly confirmation that dust is being removed from hoppers through visual inspection, or equivalent means of ensuring the proper functioning of removal mechanisms.
    (5) Monthly check of bag cleaning mechanisms for proper functioning through visual inspection or equivalent means.
    (6) Such checks are not required for shaker-type baghouses using self-tensioning (spring loaded) devices.
    (7) Quarterly confirmation of the physical integrity of the baghouse through visual inspection of the baghouse interior for air leaks.
    (8) Quarterly inspection of fans for wear, material buildup, and corrosion through visual inspection, vibration detectors, or equivalent means.
    (9) Except as provided in paragraphs (g) and (h) of this section, continuous operation of a bag leak detection system, unless a system meeting the requirements of paragraph (m) of this section for a continuous emissions monitoring system is installed for monitoring the concentration of lead.

Citations to §63.548(c)(5)

  • (c) The procedures that you specify in the standard operating procedures manual for inspections and routine maintenance must, at a minimum, include the requirements of paragraphs (c)(1) through (9) of this section.
    (2) Weekly confirmation that dust is being removed from hoppers through visual inspection, or equivalent means of ensuring the proper functioning of removal mechanisms.
    (5) Monthly check of bag cleaning mechanisms for proper functioning through visual inspection or equivalent means.
    (6) Such checks are not required for shaker-type baghouses using self-tensioning (spring loaded) devices.
    (7) Quarterly confirmation of the physical integrity of the baghouse through visual inspection of the baghouse interior for air leaks.
    (8) Quarterly inspection of fans for wear, material buildup, and corrosion through visual inspection, vibration detectors, or equivalent means.
    (9) Except as provided in paragraphs (g) and (h) of this section, continuous operation of a bag leak detection system, unless a system meeting the requirements of paragraph (m) of this section for a continuous emissions monitoring system is installed for monitoring the concentration of lead.

Citations to §63.548(c)(6)

  • (c) The procedures that you specify in the standard operating procedures manual for inspections and routine maintenance must, at a minimum, include the requirements of paragraphs (c)(1) through (9) of this section.
    (2) Weekly confirmation that dust is being removed from hoppers through visual inspection, or equivalent means of ensuring the proper functioning of removal mechanisms.
    (5) Monthly check of bag cleaning mechanisms for proper functioning through visual inspection or equivalent means.
    (6) Such checks are not required for shaker-type baghouses using self-tensioning (spring loaded) devices.
    (7) Quarterly confirmation of the physical integrity of the baghouse through visual inspection of the baghouse interior for air leaks.
    (8) Quarterly inspection of fans for wear, material buildup, and corrosion through visual inspection, vibration detectors, or equivalent means.
    (9) Except as provided in paragraphs (g) and (h) of this section, continuous operation of a bag leak detection system, unless a system meeting the requirements of paragraph (m) of this section for a continuous emissions monitoring system is installed for monitoring the concentration of lead.

Citations to §63.548(c)(7)

  • (c) The procedures that you specify in the standard operating procedures manual for inspections and routine maintenance must, at a minimum, include the requirements of paragraphs (c)(1) through (9) of this section.
    (2) Weekly confirmation that dust is being removed from hoppers through visual inspection, or equivalent means of ensuring the proper functioning of removal mechanisms.
    (5) Monthly check of bag cleaning mechanisms for proper functioning through visual inspection or equivalent means.
    (6) Such checks are not required for shaker-type baghouses using self-tensioning (spring loaded) devices.
    (7) Quarterly confirmation of the physical integrity of the baghouse through visual inspection of the baghouse interior for air leaks.
    (8) Quarterly inspection of fans for wear, material buildup, and corrosion through visual inspection, vibration detectors, or equivalent means.
    (9) Except as provided in paragraphs (g) and (h) of this section, continuous operation of a bag leak detection system, unless a system meeting the requirements of paragraph (m) of this section for a continuous emissions monitoring system is installed for monitoring the concentration of lead.

Citations to §63.548(c)(8)

  • (c) The procedures that you specify in the standard operating procedures manual for inspections and routine maintenance must, at a minimum, include the requirements of paragraphs (c)(1) through (9) of this section.
    (2) Weekly confirmation that dust is being removed from hoppers through visual inspection, or equivalent means of ensuring the proper functioning of removal mechanisms.
    (5) Monthly check of bag cleaning mechanisms for proper functioning through visual inspection or equivalent means.
    (6) Such checks are not required for shaker-type baghouses using self-tensioning (spring loaded) devices.
    (7) Quarterly confirmation of the physical integrity of the baghouse through visual inspection of the baghouse interior for air leaks.
    (8) Quarterly inspection of fans for wear, material buildup, and corrosion through visual inspection, vibration detectors, or equivalent means.
    (9) Except as provided in paragraphs (g) and (h) of this section, continuous operation of a bag leak detection system, unless a system meeting the requirements of paragraph (m) of this section for a continuous emissions monitoring system is installed for monitoring the concentration of lead.

Citations to §63.548(c)(9)

  • (c) The procedures that you specify in the standard operating procedures manual for inspections and routine maintenance must, at a minimum, include the requirements of paragraphs (c)(1) through (9) of this section.
    (2) Weekly confirmation that dust is being removed from hoppers through visual inspection, or equivalent means of ensuring the proper functioning of removal mechanisms.
    (5) Monthly check of bag cleaning mechanisms for proper functioning through visual inspection or equivalent means.
    (6) Such checks are not required for shaker-type baghouses using self-tensioning (spring loaded) devices.
    (7) Quarterly confirmation of the physical integrity of the baghouse through visual inspection of the baghouse interior for air leaks.
    (8) Quarterly inspection of fans for wear, material buildup, and corrosion through visual inspection, vibration detectors, or equivalent means.
    (9) Except as provided in paragraphs (g) and (h) of this section, continuous operation of a bag leak detection system, unless a system meeting the requirements of paragraph (m) of this section for a continuous emissions monitoring system is installed for monitoring the concentration of lead.

Citations to §63.548(e)

  • (4) EPA-454/R-98-015, Fabric Filter Bag Leak Detection Guidance, September 1997; IBR approved for §§ 63.548(e); 63.864(e); 63.7525(j); 63.8450(e); 63.8600(e); 63.9632(a); 63.9804(f); 63.11224(f); 63.11423(e). (Available at: https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=2000D5T6.pdf.)

Citations to §63.548(e)(1)

  • (e) The bag leak detection system required by paragraph (c)(9) of this section, must meet the specification and requirements of paragraphs (e)(1) through (8) of this section.
    (1) The bag leak detection system must be certified by the manufacturer to be capable of detecting particulate matter emissions at concentrations of 1.0 milligram per actual cubic meter (0.00044 grains per actual cubic foot) or less.
    (2) The bag leak detection system sensor must provide output of relative particulate matter loadings.
    (3) The bag leak detection system must be equipped with an alarm system that will alarm when an increase in relative particulate loadings is detected over a preset level.
    (4) You must install and operate the bag leak detection system in a manner consistent with the guidance provided in “Office of Air quality Planning and Standards (OAQPS) Fabric Filter Bag Leak Detection Guidance” EPA-454/R-98-015, September 1997 (incorporated by reference, see § 63.14) and the manufacturer's written specifications and recommendations for installation, operation, and adjustment of the system.
    (5) The initial adjustment of the system must, at a minimum, consist of establishing the baseline output by adjusting the sensitivity (range) and the averaging period of the device, and establishing the alarm set points and the alarm delay time.
    (6) Following initial adjustment, you must not adjust the sensitivity or range, averaging period, alarm set points, or alarm delay time, except as detailed in the approved standard operating procedures manual required under paragraph (a) of this section. You cannot increase the sensitivity by more than 100 percent or decrease the sensitivity by more than 50 percent over a 365 day period unless such adjustment follows a complete baghouse inspection that demonstrates that the baghouse is in good operating condition.
    (7) For negative pressure, induced air baghouses, and positive pressure baghouses that are discharged to the atmosphere through a stack, you must install the bag leak detector downstream of the baghouse and upstream of any wet acid gas scrubber.
    (8) Where multiple detectors are required, the system's instrumentation and alarm may be shared among detectors.

Citations to §63.548(e)(2)

  • (e) The bag leak detection system required by paragraph (c)(9) of this section, must meet the specification and requirements of paragraphs (e)(1) through (8) of this section.
    (1) The bag leak detection system must be certified by the manufacturer to be capable of detecting particulate matter emissions at concentrations of 1.0 milligram per actual cubic meter (0.00044 grains per actual cubic foot) or less.
    (2) The bag leak detection system sensor must provide output of relative particulate matter loadings.
    (3) The bag leak detection system must be equipped with an alarm system that will alarm when an increase in relative particulate loadings is detected over a preset level.
    (4) You must install and operate the bag leak detection system in a manner consistent with the guidance provided in “Office of Air quality Planning and Standards (OAQPS) Fabric Filter Bag Leak Detection Guidance” EPA-454/R-98-015, September 1997 (incorporated by reference, see § 63.14) and the manufacturer's written specifications and recommendations for installation, operation, and adjustment of the system.
    (5) The initial adjustment of the system must, at a minimum, consist of establishing the baseline output by adjusting the sensitivity (range) and the averaging period of the device, and establishing the alarm set points and the alarm delay time.
    (6) Following initial adjustment, you must not adjust the sensitivity or range, averaging period, alarm set points, or alarm delay time, except as detailed in the approved standard operating procedures manual required under paragraph (a) of this section. You cannot increase the sensitivity by more than 100 percent or decrease the sensitivity by more than 50 percent over a 365 day period unless such adjustment follows a complete baghouse inspection that demonstrates that the baghouse is in good operating condition.
    (7) For negative pressure, induced air baghouses, and positive pressure baghouses that are discharged to the atmosphere through a stack, you must install the bag leak detector downstream of the baghouse and upstream of any wet acid gas scrubber.
    (8) Where multiple detectors are required, the system's instrumentation and alarm may be shared among detectors.

Citations to §63.548(e)(3)

  • (e) The bag leak detection system required by paragraph (c)(9) of this section, must meet the specification and requirements of paragraphs (e)(1) through (8) of this section.
    (1) The bag leak detection system must be certified by the manufacturer to be capable of detecting particulate matter emissions at concentrations of 1.0 milligram per actual cubic meter (0.00044 grains per actual cubic foot) or less.
    (2) The bag leak detection system sensor must provide output of relative particulate matter loadings.
    (3) The bag leak detection system must be equipped with an alarm system that will alarm when an increase in relative particulate loadings is detected over a preset level.
    (4) You must install and operate the bag leak detection system in a manner consistent with the guidance provided in “Office of Air quality Planning and Standards (OAQPS) Fabric Filter Bag Leak Detection Guidance” EPA-454/R-98-015, September 1997 (incorporated by reference, see § 63.14) and the manufacturer's written specifications and recommendations for installation, operation, and adjustment of the system.
    (5) The initial adjustment of the system must, at a minimum, consist of establishing the baseline output by adjusting the sensitivity (range) and the averaging period of the device, and establishing the alarm set points and the alarm delay time.
    (6) Following initial adjustment, you must not adjust the sensitivity or range, averaging period, alarm set points, or alarm delay time, except as detailed in the approved standard operating procedures manual required under paragraph (a) of this section. You cannot increase the sensitivity by more than 100 percent or decrease the sensitivity by more than 50 percent over a 365 day period unless such adjustment follows a complete baghouse inspection that demonstrates that the baghouse is in good operating condition.
    (7) For negative pressure, induced air baghouses, and positive pressure baghouses that are discharged to the atmosphere through a stack, you must install the bag leak detector downstream of the baghouse and upstream of any wet acid gas scrubber.
    (8) Where multiple detectors are required, the system's instrumentation and alarm may be shared among detectors.

Citations to §63.548(e)(4)

  • (e) The bag leak detection system required by paragraph (c)(9) of this section, must meet the specification and requirements of paragraphs (e)(1) through (8) of this section.
    (1) The bag leak detection system must be certified by the manufacturer to be capable of detecting particulate matter emissions at concentrations of 1.0 milligram per actual cubic meter (0.00044 grains per actual cubic foot) or less.
    (2) The bag leak detection system sensor must provide output of relative particulate matter loadings.
    (3) The bag leak detection system must be equipped with an alarm system that will alarm when an increase in relative particulate loadings is detected over a preset level.
    (4) You must install and operate the bag leak detection system in a manner consistent with the guidance provided in “Office of Air quality Planning and Standards (OAQPS) Fabric Filter Bag Leak Detection Guidance” EPA-454/R-98-015, September 1997 (incorporated by reference, see § 63.14) and the manufacturer's written specifications and recommendations for installation, operation, and adjustment of the system.
    (5) The initial adjustment of the system must, at a minimum, consist of establishing the baseline output by adjusting the sensitivity (range) and the averaging period of the device, and establishing the alarm set points and the alarm delay time.
    (6) Following initial adjustment, you must not adjust the sensitivity or range, averaging period, alarm set points, or alarm delay time, except as detailed in the approved standard operating procedures manual required under paragraph (a) of this section. You cannot increase the sensitivity by more than 100 percent or decrease the sensitivity by more than 50 percent over a 365 day period unless such adjustment follows a complete baghouse inspection that demonstrates that the baghouse is in good operating condition.
    (7) For negative pressure, induced air baghouses, and positive pressure baghouses that are discharged to the atmosphere through a stack, you must install the bag leak detector downstream of the baghouse and upstream of any wet acid gas scrubber.
    (8) Where multiple detectors are required, the system's instrumentation and alarm may be shared among detectors.

Citations to §63.548(e)(5)

  • (e) The bag leak detection system required by paragraph (c)(9) of this section, must meet the specification and requirements of paragraphs (e)(1) through (8) of this section.
    (1) The bag leak detection system must be certified by the manufacturer to be capable of detecting particulate matter emissions at concentrations of 1.0 milligram per actual cubic meter (0.00044 grains per actual cubic foot) or less.
    (2) The bag leak detection system sensor must provide output of relative particulate matter loadings.
    (3) The bag leak detection system must be equipped with an alarm system that will alarm when an increase in relative particulate loadings is detected over a preset level.
    (4) You must install and operate the bag leak detection system in a manner consistent with the guidance provided in “Office of Air quality Planning and Standards (OAQPS) Fabric Filter Bag Leak Detection Guidance” EPA-454/R-98-015, September 1997 (incorporated by reference, see § 63.14) and the manufacturer's written specifications and recommendations for installation, operation, and adjustment of the system.
    (5) The initial adjustment of the system must, at a minimum, consist of establishing the baseline output by adjusting the sensitivity (range) and the averaging period of the device, and establishing the alarm set points and the alarm delay time.
    (6) Following initial adjustment, you must not adjust the sensitivity or range, averaging period, alarm set points, or alarm delay time, except as detailed in the approved standard operating procedures manual required under paragraph (a) of this section. You cannot increase the sensitivity by more than 100 percent or decrease the sensitivity by more than 50 percent over a 365 day period unless such adjustment follows a complete baghouse inspection that demonstrates that the baghouse is in good operating condition.
    (7) For negative pressure, induced air baghouses, and positive pressure baghouses that are discharged to the atmosphere through a stack, you must install the bag leak detector downstream of the baghouse and upstream of any wet acid gas scrubber.
    (8) Where multiple detectors are required, the system's instrumentation and alarm may be shared among detectors.

Citations to §63.548(e)(6)

  • (e) The bag leak detection system required by paragraph (c)(9) of this section, must meet the specification and requirements of paragraphs (e)(1) through (8) of this section.
    (1) The bag leak detection system must be certified by the manufacturer to be capable of detecting particulate matter emissions at concentrations of 1.0 milligram per actual cubic meter (0.00044 grains per actual cubic foot) or less.
    (2) The bag leak detection system sensor must provide output of relative particulate matter loadings.
    (3) The bag leak detection system must be equipped with an alarm system that will alarm when an increase in relative particulate loadings is detected over a preset level.
    (4) You must install and operate the bag leak detection system in a manner consistent with the guidance provided in “Office of Air quality Planning and Standards (OAQPS) Fabric Filter Bag Leak Detection Guidance” EPA-454/R-98-015, September 1997 (incorporated by reference, see § 63.14) and the manufacturer's written specifications and recommendations for installation, operation, and adjustment of the system.
    (5) The initial adjustment of the system must, at a minimum, consist of establishing the baseline output by adjusting the sensitivity (range) and the averaging period of the device, and establishing the alarm set points and the alarm delay time.
    (6) Following initial adjustment, you must not adjust the sensitivity or range, averaging period, alarm set points, or alarm delay time, except as detailed in the approved standard operating procedures manual required under paragraph (a) of this section. You cannot increase the sensitivity by more than 100 percent or decrease the sensitivity by more than 50 percent over a 365 day period unless such adjustment follows a complete baghouse inspection that demonstrates that the baghouse is in good operating condition.
    (7) For negative pressure, induced air baghouses, and positive pressure baghouses that are discharged to the atmosphere through a stack, you must install the bag leak detector downstream of the baghouse and upstream of any wet acid gas scrubber.
    (8) Where multiple detectors are required, the system's instrumentation and alarm may be shared among detectors.

Citations to §63.548(e)(7)

  • (e) The bag leak detection system required by paragraph (c)(9) of this section, must meet the specification and requirements of paragraphs (e)(1) through (8) of this section.
    (1) The bag leak detection system must be certified by the manufacturer to be capable of detecting particulate matter emissions at concentrations of 1.0 milligram per actual cubic meter (0.00044 grains per actual cubic foot) or less.
    (2) The bag leak detection system sensor must provide output of relative particulate matter loadings.
    (3) The bag leak detection system must be equipped with an alarm system that will alarm when an increase in relative particulate loadings is detected over a preset level.
    (4) You must install and operate the bag leak detection system in a manner consistent with the guidance provided in “Office of Air quality Planning and Standards (OAQPS) Fabric Filter Bag Leak Detection Guidance” EPA-454/R-98-015, September 1997 (incorporated by reference, see § 63.14) and the manufacturer's written specifications and recommendations for installation, operation, and adjustment of the system.
    (5) The initial adjustment of the system must, at a minimum, consist of establishing the baseline output by adjusting the sensitivity (range) and the averaging period of the device, and establishing the alarm set points and the alarm delay time.
    (6) Following initial adjustment, you must not adjust the sensitivity or range, averaging period, alarm set points, or alarm delay time, except as detailed in the approved standard operating procedures manual required under paragraph (a) of this section. You cannot increase the sensitivity by more than 100 percent or decrease the sensitivity by more than 50 percent over a 365 day period unless such adjustment follows a complete baghouse inspection that demonstrates that the baghouse is in good operating condition.
    (7) For negative pressure, induced air baghouses, and positive pressure baghouses that are discharged to the atmosphere through a stack, you must install the bag leak detector downstream of the baghouse and upstream of any wet acid gas scrubber.
    (8) Where multiple detectors are required, the system's instrumentation and alarm may be shared among detectors.

Citations to §63.548(e)(8)

  • (e) The bag leak detection system required by paragraph (c)(9) of this section, must meet the specification and requirements of paragraphs (e)(1) through (8) of this section.
    (1) The bag leak detection system must be certified by the manufacturer to be capable of detecting particulate matter emissions at concentrations of 1.0 milligram per actual cubic meter (0.00044 grains per actual cubic foot) or less.
    (2) The bag leak detection system sensor must provide output of relative particulate matter loadings.
    (3) The bag leak detection system must be equipped with an alarm system that will alarm when an increase in relative particulate loadings is detected over a preset level.
    (4) You must install and operate the bag leak detection system in a manner consistent with the guidance provided in “Office of Air quality Planning and Standards (OAQPS) Fabric Filter Bag Leak Detection Guidance” EPA-454/R-98-015, September 1997 (incorporated by reference, see § 63.14) and the manufacturer's written specifications and recommendations for installation, operation, and adjustment of the system.
    (5) The initial adjustment of the system must, at a minimum, consist of establishing the baseline output by adjusting the sensitivity (range) and the averaging period of the device, and establishing the alarm set points and the alarm delay time.
    (6) Following initial adjustment, you must not adjust the sensitivity or range, averaging period, alarm set points, or alarm delay time, except as detailed in the approved standard operating procedures manual required under paragraph (a) of this section. You cannot increase the sensitivity by more than 100 percent or decrease the sensitivity by more than 50 percent over a 365 day period unless such adjustment follows a complete baghouse inspection that demonstrates that the baghouse is in good operating condition.
    (7) For negative pressure, induced air baghouses, and positive pressure baghouses that are discharged to the atmosphere through a stack, you must install the bag leak detector downstream of the baghouse and upstream of any wet acid gas scrubber.
    (8) Where multiple detectors are required, the system's instrumentation and alarm may be shared among detectors.

Citations to §63.548(f)(1)

Citations to §63.548(f)(2)

Citations to §63.548(f)(2)(i)

  • (2) The cause of the alarm must be alleviated by taking the necessary corrective action(s) that may include, but not be limited to, those listed in paragraphs (f)(2)(i) through (vi) of this section.
    (i) Inspecting the baghouse for air leaks, torn or broken filter elements, or any other malfunction that may cause an increase in emissions.

Citations to §63.548(f)(2)(ii)

  • (2) The cause of the alarm must be alleviated by taking the necessary corrective action(s) that may include, but not be limited to, those listed in paragraphs (f)(2)(i) through (vi) of this section.
    (i) Inspecting the baghouse for air leaks, torn or broken filter elements, or any other malfunction that may cause an increase in emissions.

Citations to §63.548(f)(2)(iii)

  • (2) The cause of the alarm must be alleviated by taking the necessary corrective action(s) that may include, but not be limited to, those listed in paragraphs (f)(2)(i) through (vi) of this section.
    (i) Inspecting the baghouse for air leaks, torn or broken filter elements, or any other malfunction that may cause an increase in emissions.

Citations to §63.548(f)(2)(iv)

  • (2) The cause of the alarm must be alleviated by taking the necessary corrective action(s) that may include, but not be limited to, those listed in paragraphs (f)(2)(i) through (vi) of this section.
    (i) Inspecting the baghouse for air leaks, torn or broken filter elements, or any other malfunction that may cause an increase in emissions.

Citations to §63.548(f)(2)(v)

  • (2) The cause of the alarm must be alleviated by taking the necessary corrective action(s) that may include, but not be limited to, those listed in paragraphs (f)(2)(i) through (vi) of this section.
    (i) Inspecting the baghouse for air leaks, torn or broken filter elements, or any other malfunction that may cause an increase in emissions.

Citations to §63.548(f)(2)(vi)

  • (2) The cause of the alarm must be alleviated by taking the necessary corrective action(s) that may include, but not be limited to, those listed in paragraphs (f)(2)(i) through (vi) of this section.
    (i) Inspecting the baghouse for air leaks, torn or broken filter elements, or any other malfunction that may cause an increase in emissions.

Citations to §63.548(g)(1)

  • (g) Baghouses equipped with high efficiency particulate air (or HEPA) filters as a secondary filter used to control emissions from any source subject to the lead emission standards in § 65.543(a) or (b), are exempt from the requirement to be equipped with a bag leak detection system. You must monitor and record the pressure drop across each HEPA filter system daily. If the pressure drop is outside the limit(s) specified by the filter manufacturer, you must take appropriate corrective measures, which may include but not be limited to those given in paragraphs (g)(1) through (4) of this section.
    (3) Sealing off a defective control device by routing air to other control devices

Citations to §63.548(g)(2)

  • (g) Baghouses equipped with high efficiency particulate air (or HEPA) filters as a secondary filter used to control emissions from any source subject to the lead emission standards in § 65.543(a) or (b), are exempt from the requirement to be equipped with a bag leak detection system. You must monitor and record the pressure drop across each HEPA filter system daily. If the pressure drop is outside the limit(s) specified by the filter manufacturer, you must take appropriate corrective measures, which may include but not be limited to those given in paragraphs (g)(1) through (4) of this section.
    (3) Sealing off a defective control device by routing air to other control devices

Citations to §63.548(g)(3)

  • (g) Baghouses equipped with high efficiency particulate air (or HEPA) filters as a secondary filter used to control emissions from any source subject to the lead emission standards in § 65.543(a) or (b), are exempt from the requirement to be equipped with a bag leak detection system. You must monitor and record the pressure drop across each HEPA filter system daily. If the pressure drop is outside the limit(s) specified by the filter manufacturer, you must take appropriate corrective measures, which may include but not be limited to those given in paragraphs (g)(1) through (4) of this section.
    (3) Sealing off a defective control device by routing air to other control devices

Citations to §63.548(g)(4)

  • (g) Baghouses equipped with high efficiency particulate air (or HEPA) filters as a secondary filter used to control emissions from any source subject to the lead emission standards in § 65.543(a) or (b), are exempt from the requirement to be equipped with a bag leak detection system. You must monitor and record the pressure drop across each HEPA filter system daily. If the pressure drop is outside the limit(s) specified by the filter manufacturer, you must take appropriate corrective measures, which may include but not be limited to those given in paragraphs (g)(1) through (4) of this section.
    (3) Sealing off a defective control device by routing air to other control devices

Citations to §63.548(i)

Citations to §63.548(j)

Citations to §63.548(j)(1)

  • (j) You must comply with the requirements specified in paragraphs (j)(1) through (4) of this section to demonstrate continuous compliance with the total hydrocarbons and dioxins and furans emissions standards. During periods of startup and shutdown, the requirements of paragraph (j)(4) of this section do not apply. Instead, you must demonstrate compliance with the standard for total hydrocarbon by meeting the requirements of § 63.543(l).
    (1) You must install, calibrate, maintain, and continuously operate a device to monitor and record the temperature of the afterburner or furnace exhaust streams consistent with the requirements for continuous monitoring systems in § 63.8.
    (2) Prior to or in conjunction with the initial performance or compliance test to determine compliance with § 63.543(c), you must conduct a performance evaluation for the temperature monitoring device according to § 63.8(e). The definitions, installation specifications, test procedures, and data reduction procedures for determining calibration drift, relative accuracy, and reporting described in Performance Specification 2, 40 CFR part 60, appendix B, sections 2, 3, 5, 7, 8, 9, and 10 must be used to conduct the evaluation. The temperature monitoring device must meet the following performance and equipment specifications:
    (i) The recorder response range must include zero and 1.5 times the average temperature identified in paragraph (j)(3) of this section.
    (ii) The monitoring system calibration drift must not exceed 2 percent of 1.5 times the average temperature identified in paragraph (j)(3) of this section.
    (iii) The monitoring system relative accuracy must not exceed 20 percent.
    (iv) The reference method must be a National Institute of Standards and Technology calibrated reference thermocouple-potentiometer system or an alternate reference, subject to the approval of the Administrator.
    (3) You must monitor and record the temperature of the afterburner or the furnace exhaust streams every 15 minutes during the initial performance or compliance test for total hydrocarbons and dioxins and furans and determine an arithmetic average for the recorded temperature measurements.
    (4) To demonstrate continuous compliance with the standards for total hydrocarbons and dioxins and furans, you must maintain an afterburner or exhaust temperature such that the average temperature in any 3-hour period does not fall more than 28 °Celsius (50 °Fahrenheit) below the average established in paragraph (j)(3) of this section.
  • (5) Electronic records of the output from the continuous temperature monitor required in § 63.548(j)(1), and an identification of periods when the 3-hour average temperature fell below the minimum established under § 63.548(j)(4), and an explanation of the corrective actions taken.

Citations to §63.548(j)(2)

  • (j) You must comply with the requirements specified in paragraphs (j)(1) through (4) of this section to demonstrate continuous compliance with the total hydrocarbons and dioxins and furans emissions standards. During periods of startup and shutdown, the requirements of paragraph (j)(4) of this section do not apply. Instead, you must demonstrate compliance with the standard for total hydrocarbon by meeting the requirements of § 63.543(l).
    (1) You must install, calibrate, maintain, and continuously operate a device to monitor and record the temperature of the afterburner or furnace exhaust streams consistent with the requirements for continuous monitoring systems in § 63.8.
    (2) Prior to or in conjunction with the initial performance or compliance test to determine compliance with § 63.543(c), you must conduct a performance evaluation for the temperature monitoring device according to § 63.8(e). The definitions, installation specifications, test procedures, and data reduction procedures for determining calibration drift, relative accuracy, and reporting described in Performance Specification 2, 40 CFR part 60, appendix B, sections 2, 3, 5, 7, 8, 9, and 10 must be used to conduct the evaluation. The temperature monitoring device must meet the following performance and equipment specifications:
    (i) The recorder response range must include zero and 1.5 times the average temperature identified in paragraph (j)(3) of this section.
    (ii) The monitoring system calibration drift must not exceed 2 percent of 1.5 times the average temperature identified in paragraph (j)(3) of this section.
    (iii) The monitoring system relative accuracy must not exceed 20 percent.
    (iv) The reference method must be a National Institute of Standards and Technology calibrated reference thermocouple-potentiometer system or an alternate reference, subject to the approval of the Administrator.
    (3) You must monitor and record the temperature of the afterburner or the furnace exhaust streams every 15 minutes during the initial performance or compliance test for total hydrocarbons and dioxins and furans and determine an arithmetic average for the recorded temperature measurements.
    (4) To demonstrate continuous compliance with the standards for total hydrocarbons and dioxins and furans, you must maintain an afterburner or exhaust temperature such that the average temperature in any 3-hour period does not fall more than 28 °Celsius (50 °Fahrenheit) below the average established in paragraph (j)(3) of this section.

Citations to §63.548(j)(3)

  • (j) You must comply with the requirements specified in paragraphs (j)(1) through (4) of this section to demonstrate continuous compliance with the total hydrocarbons and dioxins and furans emissions standards. During periods of startup and shutdown, the requirements of paragraph (j)(4) of this section do not apply. Instead, you must demonstrate compliance with the standard for total hydrocarbon by meeting the requirements of § 63.543(l).
    (1) You must install, calibrate, maintain, and continuously operate a device to monitor and record the temperature of the afterburner or furnace exhaust streams consistent with the requirements for continuous monitoring systems in § 63.8.
    (2) Prior to or in conjunction with the initial performance or compliance test to determine compliance with § 63.543(c), you must conduct a performance evaluation for the temperature monitoring device according to § 63.8(e). The definitions, installation specifications, test procedures, and data reduction procedures for determining calibration drift, relative accuracy, and reporting described in Performance Specification 2, 40 CFR part 60, appendix B, sections 2, 3, 5, 7, 8, 9, and 10 must be used to conduct the evaluation. The temperature monitoring device must meet the following performance and equipment specifications:
    (i) The recorder response range must include zero and 1.5 times the average temperature identified in paragraph (j)(3) of this section.
    (ii) The monitoring system calibration drift must not exceed 2 percent of 1.5 times the average temperature identified in paragraph (j)(3) of this section.
    (iii) The monitoring system relative accuracy must not exceed 20 percent.
    (iv) The reference method must be a National Institute of Standards and Technology calibrated reference thermocouple-potentiometer system or an alternate reference, subject to the approval of the Administrator.
    (3) You must monitor and record the temperature of the afterburner or the furnace exhaust streams every 15 minutes during the initial performance or compliance test for total hydrocarbons and dioxins and furans and determine an arithmetic average for the recorded temperature measurements.
    (4) To demonstrate continuous compliance with the standards for total hydrocarbons and dioxins and furans, you must maintain an afterburner or exhaust temperature such that the average temperature in any 3-hour period does not fall more than 28 °Celsius (50 °Fahrenheit) below the average established in paragraph (j)(3) of this section.

Citations to §63.548(j)(4)

  • (j) You must comply with the requirements specified in paragraphs (j)(1) through (4) of this section to demonstrate continuous compliance with the total hydrocarbons and dioxins and furans emissions standards. During periods of startup and shutdown, the requirements of paragraph (j)(4) of this section do not apply. Instead, you must demonstrate compliance with the standard for total hydrocarbon by meeting the requirements of § 63.543(l).
    (1) You must install, calibrate, maintain, and continuously operate a device to monitor and record the temperature of the afterburner or furnace exhaust streams consistent with the requirements for continuous monitoring systems in § 63.8.
    (2) Prior to or in conjunction with the initial performance or compliance test to determine compliance with § 63.543(c), you must conduct a performance evaluation for the temperature monitoring device according to § 63.8(e). The definitions, installation specifications, test procedures, and data reduction procedures for determining calibration drift, relative accuracy, and reporting described in Performance Specification 2, 40 CFR part 60, appendix B, sections 2, 3, 5, 7, 8, 9, and 10 must be used to conduct the evaluation. The temperature monitoring device must meet the following performance and equipment specifications:
    (i) The recorder response range must include zero and 1.5 times the average temperature identified in paragraph (j)(3) of this section.
    (ii) The monitoring system calibration drift must not exceed 2 percent of 1.5 times the average temperature identified in paragraph (j)(3) of this section.
    (iii) The monitoring system relative accuracy must not exceed 20 percent.
    (iv) The reference method must be a National Institute of Standards and Technology calibrated reference thermocouple-potentiometer system or an alternate reference, subject to the approval of the Administrator.
    (3) You must monitor and record the temperature of the afterburner or the furnace exhaust streams every 15 minutes during the initial performance or compliance test for total hydrocarbons and dioxins and furans and determine an arithmetic average for the recorded temperature measurements.
    (4) To demonstrate continuous compliance with the standards for total hydrocarbons and dioxins and furans, you must maintain an afterburner or exhaust temperature such that the average temperature in any 3-hour period does not fall more than 28 °Celsius (50 °Fahrenheit) below the average established in paragraph (j)(3) of this section.
  • (5) Electronic records of the output from the continuous temperature monitor required in § 63.548(j)(1), and an identification of periods when the 3-hour average temperature fell below the minimum established under § 63.548(j)(4), and an explanation of the corrective actions taken.

Citations to §63.548(k)

Citations to §63.548(k)(1)

  • (k) You must install, operate, and maintain a digital differential pressure monitoring system to continuously monitor each total enclosure as described in paragraphs (k)(1) through (5) of this section.
    (1) You must install and maintain a minimum of one building digital differential pressure monitoring system at each of the following three walls in each total enclosure that has a total ground surface area of 10,000 square feet or more:
    (iii) An exterior wall that connects the leeward and windward wall at a location defined by the intersection of a perpendicular line between a point on the connecting wall and a point on its furthest opposite exterior wall, and intersecting within plus or minus 10 meters of the midpoint of a straight line between the two other monitors specified. The midpoint monitor must not be located on the same wall as either of the other two monitors. If approved by the permitting authority, this third monitor may be placed in an alternative location on the midpoint wall or an exterior wall that is not the windward wall, leeward wall or midpoint wall.
    (2) You must install and maintain a minimum of one building digital differential pressure monitoring system at the leeward wall of each total enclosure that has a total ground surface area of less than 10,000 square feet.
    (3) The digital differential pressure monitoring systems must be certified by the manufacturer to be capable of measuring and displaying negative pressure containing values in the range of 0.01 to 0.2 millimeters mercury (0.005 to 0.11 inches of water) and capable of recording data in increments of 0.002 millimeters of mercury (0.001 inches of water).
    (4) You must equip each digital differential pressure monitoring system with a continuous recorder. To demonstrate compliance with the standard for differential pressure, you must maintain the pressure in total enclosures such that the average pressure in any 15-minute period does not fall below the level specified in § 63.544(c)(1). The 15-minute averages must include at least one reading per minute.
    (5) You must calibrate each digital differential pressure monitoring system in accordance with manufacturer's specifications.

Citations to §63.548(k)(2)

  • (k) You must install, operate, and maintain a digital differential pressure monitoring system to continuously monitor each total enclosure as described in paragraphs (k)(1) through (5) of this section.
    (1) You must install and maintain a minimum of one building digital differential pressure monitoring system at each of the following three walls in each total enclosure that has a total ground surface area of 10,000 square feet or more:
    (iii) An exterior wall that connects the leeward and windward wall at a location defined by the intersection of a perpendicular line between a point on the connecting wall and a point on its furthest opposite exterior wall, and intersecting within plus or minus 10 meters of the midpoint of a straight line between the two other monitors specified. The midpoint monitor must not be located on the same wall as either of the other two monitors. If approved by the permitting authority, this third monitor may be placed in an alternative location on the midpoint wall or an exterior wall that is not the windward wall, leeward wall or midpoint wall.
    (2) You must install and maintain a minimum of one building digital differential pressure monitoring system at the leeward wall of each total enclosure that has a total ground surface area of less than 10,000 square feet.
    (3) The digital differential pressure monitoring systems must be certified by the manufacturer to be capable of measuring and displaying negative pressure containing values in the range of 0.01 to 0.2 millimeters mercury (0.005 to 0.11 inches of water) and capable of recording data in increments of 0.002 millimeters of mercury (0.001 inches of water).
    (4) You must equip each digital differential pressure monitoring system with a continuous recorder. To demonstrate compliance with the standard for differential pressure, you must maintain the pressure in total enclosures such that the average pressure in any 15-minute period does not fall below the level specified in § 63.544(c)(1). The 15-minute averages must include at least one reading per minute.
    (5) You must calibrate each digital differential pressure monitoring system in accordance with manufacturer's specifications.

Citations to §63.548(k)(3)

  • (k) You must install, operate, and maintain a digital differential pressure monitoring system to continuously monitor each total enclosure as described in paragraphs (k)(1) through (5) of this section.
    (1) You must install and maintain a minimum of one building digital differential pressure monitoring system at each of the following three walls in each total enclosure that has a total ground surface area of 10,000 square feet or more:
    (iii) An exterior wall that connects the leeward and windward wall at a location defined by the intersection of a perpendicular line between a point on the connecting wall and a point on its furthest opposite exterior wall, and intersecting within plus or minus 10 meters of the midpoint of a straight line between the two other monitors specified. The midpoint monitor must not be located on the same wall as either of the other two monitors. If approved by the permitting authority, this third monitor may be placed in an alternative location on the midpoint wall or an exterior wall that is not the windward wall, leeward wall or midpoint wall.
    (2) You must install and maintain a minimum of one building digital differential pressure monitoring system at the leeward wall of each total enclosure that has a total ground surface area of less than 10,000 square feet.
    (3) The digital differential pressure monitoring systems must be certified by the manufacturer to be capable of measuring and displaying negative pressure containing values in the range of 0.01 to 0.2 millimeters mercury (0.005 to 0.11 inches of water) and capable of recording data in increments of 0.002 millimeters of mercury (0.001 inches of water).
    (4) You must equip each digital differential pressure monitoring system with a continuous recorder. To demonstrate compliance with the standard for differential pressure, you must maintain the pressure in total enclosures such that the average pressure in any 15-minute period does not fall below the level specified in § 63.544(c)(1). The 15-minute averages must include at least one reading per minute.
    (5) You must calibrate each digital differential pressure monitoring system in accordance with manufacturer's specifications.

Citations to §63.548(k)(4)

  • (k) You must install, operate, and maintain a digital differential pressure monitoring system to continuously monitor each total enclosure as described in paragraphs (k)(1) through (5) of this section.
    (1) You must install and maintain a minimum of one building digital differential pressure monitoring system at each of the following three walls in each total enclosure that has a total ground surface area of 10,000 square feet or more:
    (iii) An exterior wall that connects the leeward and windward wall at a location defined by the intersection of a perpendicular line between a point on the connecting wall and a point on its furthest opposite exterior wall, and intersecting within plus or minus 10 meters of the midpoint of a straight line between the two other monitors specified. The midpoint monitor must not be located on the same wall as either of the other two monitors. If approved by the permitting authority, this third monitor may be placed in an alternative location on the midpoint wall or an exterior wall that is not the windward wall, leeward wall or midpoint wall.
    (2) You must install and maintain a minimum of one building digital differential pressure monitoring system at the leeward wall of each total enclosure that has a total ground surface area of less than 10,000 square feet.
    (3) The digital differential pressure monitoring systems must be certified by the manufacturer to be capable of measuring and displaying negative pressure containing values in the range of 0.01 to 0.2 millimeters mercury (0.005 to 0.11 inches of water) and capable of recording data in increments of 0.002 millimeters of mercury (0.001 inches of water).
    (4) You must equip each digital differential pressure monitoring system with a continuous recorder. To demonstrate compliance with the standard for differential pressure, you must maintain the pressure in total enclosures such that the average pressure in any 15-minute period does not fall below the level specified in § 63.544(c)(1). The 15-minute averages must include at least one reading per minute.
    (5) You must calibrate each digital differential pressure monitoring system in accordance with manufacturer's specifications.

Citations to §63.548(k)(5)

  • (k) You must install, operate, and maintain a digital differential pressure monitoring system to continuously monitor each total enclosure as described in paragraphs (k)(1) through (5) of this section.
    (1) You must install and maintain a minimum of one building digital differential pressure monitoring system at each of the following three walls in each total enclosure that has a total ground surface area of 10,000 square feet or more:
    (iii) An exterior wall that connects the leeward and windward wall at a location defined by the intersection of a perpendicular line between a point on the connecting wall and a point on its furthest opposite exterior wall, and intersecting within plus or minus 10 meters of the midpoint of a straight line between the two other monitors specified. The midpoint monitor must not be located on the same wall as either of the other two monitors. If approved by the permitting authority, this third monitor may be placed in an alternative location on the midpoint wall or an exterior wall that is not the windward wall, leeward wall or midpoint wall.
    (2) You must install and maintain a minimum of one building digital differential pressure monitoring system at the leeward wall of each total enclosure that has a total ground surface area of less than 10,000 square feet.
    (3) The digital differential pressure monitoring systems must be certified by the manufacturer to be capable of measuring and displaying negative pressure containing values in the range of 0.01 to 0.2 millimeters mercury (0.005 to 0.11 inches of water) and capable of recording data in increments of 0.002 millimeters of mercury (0.001 inches of water).
    (4) You must equip each digital differential pressure monitoring system with a continuous recorder. To demonstrate compliance with the standard for differential pressure, you must maintain the pressure in total enclosures such that the average pressure in any 15-minute period does not fall below the level specified in § 63.544(c)(1). The 15-minute averages must include at least one reading per minute.
    (5) You must calibrate each digital differential pressure monitoring system in accordance with manufacturer's specifications.