§63.525. Compliance and performance testing. — Inbound Citations

40 C.F.R. § 63.525

Cited by 12 regulations in release Current.

Citations to §63.525(a)

  • (c) All affected sources that commenced construction or reconstruction on or before April 25, 2023, must be in compliance with the requirements in § 63.523(d), § 63.524(a)(3), (b)(3), and (c), § 63.525(a), (e), (j), (k), and (l), § 63.527(f) and (g), and § 63.528(a)(4) upon initial startup or on July 15, 2027, whichever is later. All affected sources that commenced construction or reconstruction after April 25, 2023, must be in compliance with the requirements in § 63.523(d), § 63.524(a)(3), (b)(3), and (c), § 63.525(a), (e), (j), (k), and (l), § 63.527(f) and (g), and § 63.528(a)(4) upon initial startup, or on July 15, 2024, whichever is later.
  • (1) For affected BLR sources, uncontrolled emission points emitting less than one pound per year of HAP are not subject to the monitoring requirements of paragraphs (a) (2) through (6) of this section. The owner or operator shall use the methods specified in § 63.525(a), as applicable, or as specified in paragraph (a)(1)(i) of this section, to demonstrate which emission points satisfy the de minimis criteria, to the satisfaction of the Administrator.
    (i) For the purpose of determining de minimis status for emission points, engineering assessment may be used to determine process vent stream flow rate and/or concentration for the representative operating conditions expected to yield the highest flow rate and concentration. Engineering assessment includes, but is not limited to, the following:
    (A) Previous test results provided the tests are representative of current operating practices at the process unit.
    (B) Bench-scale or pilot-scale test data representative of the process under representative operating conditions.
    (C) Maximum flow rate, HAP emission rate, concentration, or other relevant parameter specified or implied within a permit limit applicable to the process vent.
    (D) Design analysis based on accepted chemical engineering principles, measurable process parameters, or physical or chemical laws or properties. Examples of analytical methods include, but are not limited to:
    (1) Use of material balances based on process stoichiometry to estimate maximum organic HAP concentrations,
    (2) Estimation of maximum flow rate based on physical equipment design such as pump or blower capacities,
    (3) Estimation of HAP concentrations based on saturation conditions.
    (ii) All data, assumptions, and procedures used in the engineering assessment shall be documented in accordance with § 63.527(c).

Citations to §63.525(e)

Citations to §63.525(j)

Citations to §63.525(k)

Citations to §63.525(l)

Citations to §63.525(m)(1)

  • (m) Except as specified in paragraph (m)(7) of this section, to demonstrate compliance with the process vent dioxins and furans emission limit, the owner or operator must conduct a performance test using the procedures in paragraphs (m)(1) through (m)(6) of this section. Conduct subsequent performance tests no later than 60 calendar months after the previous performance test.
    (1) The performance test must consist of three test runs. Collect at least 3 dry standard cubic meters of gas per test run.
    (2) Use Method 1 or 1A of 40 CFR part 60, appendix A-1 to select the sampling sites at the sampling location. The sampling location must be at the outlet of the final control device.
    (5) Measure the concentration of each tetra- through octa-chlorinated dioxin and furan congener emitted using Method 23 at 40 CFR part 60, appendix A-7.
    (i) For each dioxin and furan congener, multiply the congener concentration by its corresponding toxic equivalency factor specified in table 2 to this subpart. For determination of toxic equivalency, zero may be used for congeners with a concentration less than the estimated detection limit (EDL). For congeners with estimated maximum pollutant concentration (EMPC) results, if the value is less than the EDL, zero may be used. Otherwise, the EMPC value must be used in the calculation of toxic equivalency.
    (ii) Sum the products calculated in accordance with paragraph (m)(5)(i) of this section to obtain the total concentration of dioxins and furans emitted in terms of toxic equivalency.
    (6) The concentration of dioxins and furans shall be corrected to 3 percent oxygen. Use Method 3A of 40 CFR part 60, appendix A to determine the oxygen concentration (%O2d). Method 3A of 40 CFR part 60, appendix A must be run concurrently with Method 23 of 40 CFR part 60, appendix A-7. The concentration corrected to 3 percent oxygen (Cc) shall be computed using the following equation:
    (7) An owner or operator is not required to conduct a performance test when either a boiler or process heater burning hazardous waste, or hazardous waste incinerator, is used for which the owner or operator:
    (A) Has been issued a final permit under part 270 of this chapter and complies with the requirements of 40 CFR part 266, subpart H;
    (B) Has certified compliance with the interim status requirements of part 266, subpart H, of this chapter;
    (C) Meets the requirement specified in paragraph (g)(7)(i)(E) of this section, and has submitted a Notification of Compliance under § 63.1207(j) and complies with the requirements of subpart EEE of this part; or
    (D) Meets the requirement specified in paragraph (g)(7)(i)(E) of this section, complies with subpart EEE of this part, and will submit a Notification of Compliance under § 63.1207(j) by the date the owner or operator would have been required to submit the initial performance test report for this subpart.
    (E) The owner and operator may not waive performance testing pursuant to § 63.1207(d)(4) and each performance test required by § 63.1207(d) must show compliance with the dioxins and furans emission limit specified in § 63.523(e) and § 63.524(a)(3) and (b)(3), as applicable.

Citations to §63.525(m)(2)

  • (m) Except as specified in paragraph (m)(7) of this section, to demonstrate compliance with the process vent dioxins and furans emission limit, the owner or operator must conduct a performance test using the procedures in paragraphs (m)(1) through (m)(6) of this section. Conduct subsequent performance tests no later than 60 calendar months after the previous performance test.
    (1) The performance test must consist of three test runs. Collect at least 3 dry standard cubic meters of gas per test run.
    (2) Use Method 1 or 1A of 40 CFR part 60, appendix A-1 to select the sampling sites at the sampling location. The sampling location must be at the outlet of the final control device.
    (5) Measure the concentration of each tetra- through octa-chlorinated dioxin and furan congener emitted using Method 23 at 40 CFR part 60, appendix A-7.
    (i) For each dioxin and furan congener, multiply the congener concentration by its corresponding toxic equivalency factor specified in table 2 to this subpart. For determination of toxic equivalency, zero may be used for congeners with a concentration less than the estimated detection limit (EDL). For congeners with estimated maximum pollutant concentration (EMPC) results, if the value is less than the EDL, zero may be used. Otherwise, the EMPC value must be used in the calculation of toxic equivalency.
    (ii) Sum the products calculated in accordance with paragraph (m)(5)(i) of this section to obtain the total concentration of dioxins and furans emitted in terms of toxic equivalency.
    (6) The concentration of dioxins and furans shall be corrected to 3 percent oxygen. Use Method 3A of 40 CFR part 60, appendix A to determine the oxygen concentration (%O2d). Method 3A of 40 CFR part 60, appendix A must be run concurrently with Method 23 of 40 CFR part 60, appendix A-7. The concentration corrected to 3 percent oxygen (Cc) shall be computed using the following equation:
    (7) An owner or operator is not required to conduct a performance test when either a boiler or process heater burning hazardous waste, or hazardous waste incinerator, is used for which the owner or operator:
    (A) Has been issued a final permit under part 270 of this chapter and complies with the requirements of 40 CFR part 266, subpart H;
    (B) Has certified compliance with the interim status requirements of part 266, subpart H, of this chapter;
    (C) Meets the requirement specified in paragraph (g)(7)(i)(E) of this section, and has submitted a Notification of Compliance under § 63.1207(j) and complies with the requirements of subpart EEE of this part; or
    (D) Meets the requirement specified in paragraph (g)(7)(i)(E) of this section, complies with subpart EEE of this part, and will submit a Notification of Compliance under § 63.1207(j) by the date the owner or operator would have been required to submit the initial performance test report for this subpart.
    (E) The owner and operator may not waive performance testing pursuant to § 63.1207(d)(4) and each performance test required by § 63.1207(d) must show compliance with the dioxins and furans emission limit specified in § 63.523(e) and § 63.524(a)(3) and (b)(3), as applicable.

Citations to §63.525(m)(3)

  • (m) Except as specified in paragraph (m)(7) of this section, to demonstrate compliance with the process vent dioxins and furans emission limit, the owner or operator must conduct a performance test using the procedures in paragraphs (m)(1) through (m)(6) of this section. Conduct subsequent performance tests no later than 60 calendar months after the previous performance test.
    (1) The performance test must consist of three test runs. Collect at least 3 dry standard cubic meters of gas per test run.
    (2) Use Method 1 or 1A of 40 CFR part 60, appendix A-1 to select the sampling sites at the sampling location. The sampling location must be at the outlet of the final control device.
    (5) Measure the concentration of each tetra- through octa-chlorinated dioxin and furan congener emitted using Method 23 at 40 CFR part 60, appendix A-7.
    (i) For each dioxin and furan congener, multiply the congener concentration by its corresponding toxic equivalency factor specified in table 2 to this subpart. For determination of toxic equivalency, zero may be used for congeners with a concentration less than the estimated detection limit (EDL). For congeners with estimated maximum pollutant concentration (EMPC) results, if the value is less than the EDL, zero may be used. Otherwise, the EMPC value must be used in the calculation of toxic equivalency.
    (ii) Sum the products calculated in accordance with paragraph (m)(5)(i) of this section to obtain the total concentration of dioxins and furans emitted in terms of toxic equivalency.
    (6) The concentration of dioxins and furans shall be corrected to 3 percent oxygen. Use Method 3A of 40 CFR part 60, appendix A to determine the oxygen concentration (%O2d). Method 3A of 40 CFR part 60, appendix A must be run concurrently with Method 23 of 40 CFR part 60, appendix A-7. The concentration corrected to 3 percent oxygen (Cc) shall be computed using the following equation:
    (7) An owner or operator is not required to conduct a performance test when either a boiler or process heater burning hazardous waste, or hazardous waste incinerator, is used for which the owner or operator:
    (A) Has been issued a final permit under part 270 of this chapter and complies with the requirements of 40 CFR part 266, subpart H;
    (B) Has certified compliance with the interim status requirements of part 266, subpart H, of this chapter;
    (C) Meets the requirement specified in paragraph (g)(7)(i)(E) of this section, and has submitted a Notification of Compliance under § 63.1207(j) and complies with the requirements of subpart EEE of this part; or
    (D) Meets the requirement specified in paragraph (g)(7)(i)(E) of this section, complies with subpart EEE of this part, and will submit a Notification of Compliance under § 63.1207(j) by the date the owner or operator would have been required to submit the initial performance test report for this subpart.
    (E) The owner and operator may not waive performance testing pursuant to § 63.1207(d)(4) and each performance test required by § 63.1207(d) must show compliance with the dioxins and furans emission limit specified in § 63.523(e) and § 63.524(a)(3) and (b)(3), as applicable.

Citations to §63.525(m)(4)

  • (m) Except as specified in paragraph (m)(7) of this section, to demonstrate compliance with the process vent dioxins and furans emission limit, the owner or operator must conduct a performance test using the procedures in paragraphs (m)(1) through (m)(6) of this section. Conduct subsequent performance tests no later than 60 calendar months after the previous performance test.
    (1) The performance test must consist of three test runs. Collect at least 3 dry standard cubic meters of gas per test run.
    (2) Use Method 1 or 1A of 40 CFR part 60, appendix A-1 to select the sampling sites at the sampling location. The sampling location must be at the outlet of the final control device.
    (5) Measure the concentration of each tetra- through octa-chlorinated dioxin and furan congener emitted using Method 23 at 40 CFR part 60, appendix A-7.
    (i) For each dioxin and furan congener, multiply the congener concentration by its corresponding toxic equivalency factor specified in table 2 to this subpart. For determination of toxic equivalency, zero may be used for congeners with a concentration less than the estimated detection limit (EDL). For congeners with estimated maximum pollutant concentration (EMPC) results, if the value is less than the EDL, zero may be used. Otherwise, the EMPC value must be used in the calculation of toxic equivalency.
    (ii) Sum the products calculated in accordance with paragraph (m)(5)(i) of this section to obtain the total concentration of dioxins and furans emitted in terms of toxic equivalency.
    (6) The concentration of dioxins and furans shall be corrected to 3 percent oxygen. Use Method 3A of 40 CFR part 60, appendix A to determine the oxygen concentration (%O2d). Method 3A of 40 CFR part 60, appendix A must be run concurrently with Method 23 of 40 CFR part 60, appendix A-7. The concentration corrected to 3 percent oxygen (Cc) shall be computed using the following equation:
    (7) An owner or operator is not required to conduct a performance test when either a boiler or process heater burning hazardous waste, or hazardous waste incinerator, is used for which the owner or operator:
    (A) Has been issued a final permit under part 270 of this chapter and complies with the requirements of 40 CFR part 266, subpart H;
    (B) Has certified compliance with the interim status requirements of part 266, subpart H, of this chapter;
    (C) Meets the requirement specified in paragraph (g)(7)(i)(E) of this section, and has submitted a Notification of Compliance under § 63.1207(j) and complies with the requirements of subpart EEE of this part; or
    (D) Meets the requirement specified in paragraph (g)(7)(i)(E) of this section, complies with subpart EEE of this part, and will submit a Notification of Compliance under § 63.1207(j) by the date the owner or operator would have been required to submit the initial performance test report for this subpart.
    (E) The owner and operator may not waive performance testing pursuant to § 63.1207(d)(4) and each performance test required by § 63.1207(d) must show compliance with the dioxins and furans emission limit specified in § 63.523(e) and § 63.524(a)(3) and (b)(3), as applicable.

Citations to §63.525(m)(5)

  • (m) Except as specified in paragraph (m)(7) of this section, to demonstrate compliance with the process vent dioxins and furans emission limit, the owner or operator must conduct a performance test using the procedures in paragraphs (m)(1) through (m)(6) of this section. Conduct subsequent performance tests no later than 60 calendar months after the previous performance test.
    (1) The performance test must consist of three test runs. Collect at least 3 dry standard cubic meters of gas per test run.
    (2) Use Method 1 or 1A of 40 CFR part 60, appendix A-1 to select the sampling sites at the sampling location. The sampling location must be at the outlet of the final control device.
    (5) Measure the concentration of each tetra- through octa-chlorinated dioxin and furan congener emitted using Method 23 at 40 CFR part 60, appendix A-7.
    (i) For each dioxin and furan congener, multiply the congener concentration by its corresponding toxic equivalency factor specified in table 2 to this subpart. For determination of toxic equivalency, zero may be used for congeners with a concentration less than the estimated detection limit (EDL). For congeners with estimated maximum pollutant concentration (EMPC) results, if the value is less than the EDL, zero may be used. Otherwise, the EMPC value must be used in the calculation of toxic equivalency.
    (ii) Sum the products calculated in accordance with paragraph (m)(5)(i) of this section to obtain the total concentration of dioxins and furans emitted in terms of toxic equivalency.
    (6) The concentration of dioxins and furans shall be corrected to 3 percent oxygen. Use Method 3A of 40 CFR part 60, appendix A to determine the oxygen concentration (%O2d). Method 3A of 40 CFR part 60, appendix A must be run concurrently with Method 23 of 40 CFR part 60, appendix A-7. The concentration corrected to 3 percent oxygen (Cc) shall be computed using the following equation:
    (7) An owner or operator is not required to conduct a performance test when either a boiler or process heater burning hazardous waste, or hazardous waste incinerator, is used for which the owner or operator:
    (A) Has been issued a final permit under part 270 of this chapter and complies with the requirements of 40 CFR part 266, subpart H;
    (B) Has certified compliance with the interim status requirements of part 266, subpart H, of this chapter;
    (C) Meets the requirement specified in paragraph (g)(7)(i)(E) of this section, and has submitted a Notification of Compliance under § 63.1207(j) and complies with the requirements of subpart EEE of this part; or
    (D) Meets the requirement specified in paragraph (g)(7)(i)(E) of this section, complies with subpart EEE of this part, and will submit a Notification of Compliance under § 63.1207(j) by the date the owner or operator would have been required to submit the initial performance test report for this subpart.
    (E) The owner and operator may not waive performance testing pursuant to § 63.1207(d)(4) and each performance test required by § 63.1207(d) must show compliance with the dioxins and furans emission limit specified in § 63.523(e) and § 63.524(a)(3) and (b)(3), as applicable.

Citations to §63.525(m)(6)

  • (m) Except as specified in paragraph (m)(7) of this section, to demonstrate compliance with the process vent dioxins and furans emission limit, the owner or operator must conduct a performance test using the procedures in paragraphs (m)(1) through (m)(6) of this section. Conduct subsequent performance tests no later than 60 calendar months after the previous performance test.
    (1) The performance test must consist of three test runs. Collect at least 3 dry standard cubic meters of gas per test run.
    (2) Use Method 1 or 1A of 40 CFR part 60, appendix A-1 to select the sampling sites at the sampling location. The sampling location must be at the outlet of the final control device.
    (5) Measure the concentration of each tetra- through octa-chlorinated dioxin and furan congener emitted using Method 23 at 40 CFR part 60, appendix A-7.
    (i) For each dioxin and furan congener, multiply the congener concentration by its corresponding toxic equivalency factor specified in table 2 to this subpart. For determination of toxic equivalency, zero may be used for congeners with a concentration less than the estimated detection limit (EDL). For congeners with estimated maximum pollutant concentration (EMPC) results, if the value is less than the EDL, zero may be used. Otherwise, the EMPC value must be used in the calculation of toxic equivalency.
    (ii) Sum the products calculated in accordance with paragraph (m)(5)(i) of this section to obtain the total concentration of dioxins and furans emitted in terms of toxic equivalency.
    (6) The concentration of dioxins and furans shall be corrected to 3 percent oxygen. Use Method 3A of 40 CFR part 60, appendix A to determine the oxygen concentration (%O2d). Method 3A of 40 CFR part 60, appendix A must be run concurrently with Method 23 of 40 CFR part 60, appendix A-7. The concentration corrected to 3 percent oxygen (Cc) shall be computed using the following equation:
    (7) An owner or operator is not required to conduct a performance test when either a boiler or process heater burning hazardous waste, or hazardous waste incinerator, is used for which the owner or operator:
    (A) Has been issued a final permit under part 270 of this chapter and complies with the requirements of 40 CFR part 266, subpart H;
    (B) Has certified compliance with the interim status requirements of part 266, subpart H, of this chapter;
    (C) Meets the requirement specified in paragraph (g)(7)(i)(E) of this section, and has submitted a Notification of Compliance under § 63.1207(j) and complies with the requirements of subpart EEE of this part; or
    (D) Meets the requirement specified in paragraph (g)(7)(i)(E) of this section, complies with subpart EEE of this part, and will submit a Notification of Compliance under § 63.1207(j) by the date the owner or operator would have been required to submit the initial performance test report for this subpart.
    (E) The owner and operator may not waive performance testing pursuant to § 63.1207(d)(4) and each performance test required by § 63.1207(d) must show compliance with the dioxins and furans emission limit specified in § 63.523(e) and § 63.524(a)(3) and (b)(3), as applicable.