§63.521. Compliance schedule. — Inbound Citations

40 C.F.R. § 63.521

Cited by 6 regulations in release Current.

Citations to 40 C.F.R. § 63.521 as a whole

Citations to §63.521(c)

  • (d) For each existing, new, or reconstructed affected BLR source, beginning no later than the compliance dates specified in § 63.521(c), the owner or operator must comply with the requirements of § 63.104 for heat exchange systems, with the exceptions noted in paragraphs (d)(1) through (8) of this section.
    (1) When the term “chemical manufacturing process unit” is used in § 63.104, the term “existing, new, or reconstructed affected BLR source” shall apply for the purposes of this subpart.
    (2) When the phrase “a chemical manufacturing process unit meeting the conditions of § 63.100(b)(1) through (b)(3), except for chemical manufacturing process units meeting the condition specified in § 63.100(c)” is used in the first sentence of § 63.104(a), the term “an existing, new, or reconstructed affected BLR source” shall apply for the purposes of this subpart. When the phrase “a chemical manufacturing process unit meeting the conditions of § 63.100(b)(1) through (b)(3),” is used in the last sentence of § 63.104(a), the term “an existing, new, or reconstructed affected BLR source” shall apply for purposes of this subpart.
    (3) When § 63.104 refers to table 4 to subpart F of this part or table 9 of subpart G of this part, the owner or operator is required to consider all hazardous air pollutants.
    (4) When § 63.104(c)(3) specifies the monitoring plan retention requirements, and when § 6 3.104(f)(1) refers to the record retention requirements in § 63.103(c)(1) of subpart F of this part, the requirements in § 63.527(d) shall apply, for the purposes of this subpart.
    (5) When § 63.104(f)(2) requires information to be reported in the Periodic Reports required by § 63.152(c), the owner or operator shall instead report the information specified in § 63.104(f)(2) in the Periodic Reports required by § 63.528(a), for the purposes of this subpart.
    (6) The compliance date for heat exchange systems subject to the provisions of this section is specified in § 63.521(c).
    (7) Substitute “Beginning no later than the compliance dates specified in § 63.521(c),” for each occurrence of “Beginning no later than the compliance dates specified in § 63.100(k)(10),”.
    (8) § 63.104(k) does not apply. Instead for each existing, new, or reconstructed affected BLR source, beginning no later than the compliance dates specified in § 63.521(c), owners and operators must not inject water into or dispose of water through any heat exchange system in an affected source if the water is considered wastewater as defined in § 63.522.
  • (3) For each existing affected WSR source, beginning no later than the compliance dates specified in § 63.521(c), the owner or operator shall comply with both paragraphs (a)(1) and (a)(2) of this section and must reduce emissions of dioxins and furans (toxic equivalency basis) from each process vent that contains chlorine, hydrogen chloride, or any other chlorinated compound to a concentration of 0.054 nanograms per standard cubic meter on a dry basis corrected to 3 percent oxygen.
  • (a) The owner or operator of any existing affected BLR source shall, in order to demonstrate compliance with the applicable emission limits, determine the emission rate from all process vent, storage tank, and wastewater system emission points using the methods described below. Except as specified in paragraph (l) of this section, compliance tests shall be performed under normal operating conditions. Beginning no later than the compliance dates specified in § 63.521(c), conduct subsequent performance tests no later than 60 calendar months after the previous performance test.
    (1) Except as specified in paragraph (m) of this section, the owner or operator shall use the EPA test methods from 40 CFR part 60, listed in paragraphs (a)(1) (i) through (iii) of this section, to determine emissions from process vents. Testing of process vents on equipment operating as part of a continuous process will consist of conducting three 1-hour runs. Gas stream volumetric flow rates shall be measured every 15 minutes during each 1-hour run. Organic HAP or TOC concentration shall be determined from samples collected in an integrated sample over the duration of each 1-hour test run, or from grab samples collected simultaneously with the flow rate measurements (every 15 minutes). If an integrated sample is collected for laboratory analysis, the sampling rate shall be adjusted proportionally to reflect variations in flow rate. If the flow of gaseous emissions is intermittent, determination of emissions from process vents shall be performed according to the methods specified in paragraph (e) of this section. For process vents with continuous gas streams, the emission rate used to determine compliance shall be the average emission rate of the 3 test runs. For process vents with intermittent emission streams, the calculated emission rate or the emission rate from a single test run may be used to determine compliance.
    (i) Method 1 or 1A of appendix A-1 to 40 CFR part 60 as appropriate, shall be used for selection of the sampling sites if the flow measuring device is a pitot tube. A traverse shall be conducted before and after each 1-hour sampling period. No traverse is necessary when using Method 2A or 2D of appendix A-2 to 40 CFR part 60 to determine flow rate.
    (ii) Method 2, 2A, 2C or 2D of appendix A-1 to part 60 of this chapter, as appropriate, shall be used for the determination of gas stream volumetric flow rate. If Method 2 or 2C is used, the velocity measurements shall be made at a single point, in conjunction with the traverse, to establish an average velocity across the stack.
    (iii) Method 25A and/or Methods 18 and 25A of appendices A-6 and A-7 to 40 CFR part 60, as appropriate, must be used to determine the concentration of HAP in the streams. ASTM D6420-18 (incorporated by reference, see § 63.14) may also be used in lieu of Method 18, if the target compounds are all known and are all listed in Section 1.1 of ASTM D6420-18 as measurable; ASTM D6420-18 must not be used for methane and ethane; and ASTM D6420-18 may not be used as a total VOC method.
    (iv) Initial determination of de minimis status for process vents may be made by engineering assessment, as specified in § 63.526(a)(1)(iv).
    (2) Emissions from wastewater treatment systems shall be determined in accordance with the methods described in 40 CFR part 63, appendix C.
    (3) Emissions from storage tanks shall be calculated in accordance with the methods specified in § 63.150(g)(3).
  • (f) For each existing, new, or reconstructed affected BLR and WSR source, beginning no later than the compliance dates specified in § 63.521(c), the owner or operator of any affected BLR source, as well the owner or operator of any affected WSR source subject to the emission limit for process vents, storage tanks, and wastewater systems, must keep the records specified in paragraphs (f)(1) through (3) of this section each pressure relief device, as defined in § 63.522.
    (3) Records of any data, assumptions, and calculations used to estimate of the mass quantity of each organic HAP released during the event.
  • (4) For each existing, new, or reconstructed affected BLR and WSR source, beginning no later than the compliance dates specified in § 63.521(c), for each excursion that is not an excused excursion, the report must include a list of the affected sources or equipment, the monitored parameter, an estimate of the quantity in pounds of each regulated pollutant emitted over any emission limit, a description of the method used to estimate the emissions, the cause of the excursion (including unknown cause, if applicable), as applicable, and the corrective action taken. Include the start date, start time, and duration in hours of each excursion.