US Codex
C.F.R.
Browse by date
Notes

§63.52. Approval process for new and existing affected sources. — Inbound Citations

40 C.F.R. § 63.52

Cited by 18 regulations in release Current.

Citations to 40 C.F.R. § 63.52 as a whole

  • (b) Nothing in §§ 63.50 through 63.56 shall prevent a State or local regulatory agency from imposing more stringent requirements, as a matter of State or local law, than those contained in §§ 63.50 through 63.56.
  • Terms used in §§ 63.50 through 63.56 that are not defined in this section have the meaning given to them in the Act, or in subpart A of this part.
  • (1) Each owner or operator who is required to submit to the permitting authority a Part 1 MACT application which meets the requirements of § 63.53(a) for one or more sources in a category or subcategory subject to section 112(j) must also submit to the permitting authority a timely Part 2 MACT application for the same sources which meets the requirements of § 63.53(b). Each owner or operator shall submit the Part 2 MACT application for the sources in a particular category or subcategory no later than the applicable date specified in table 1 to this subpart. The submission date specified in table 1 to this subpart for Miscellaneous Organic Chemical Manufacturing shall apply to sources in each of the source categories listed in table 2 to this subpart. When the owner or operator is required by §§ 63.50 through 63.56 to submit an application meeting the requirements of § 63.53(a) by a date which is after the date for a Part 2 MACT application for sources in the category or subcategory in question established by table 1 to this subpart, the owner or operator shall submit a Part 2 MACT application meeting the requirements of § 63.53(b) within 60 additional days after the applicable deadline for submission of the Part 1 MACT application. Part 2 MACT applications must be reviewed by the permitting authority according to procedures established in § 63.55. The resulting MACT determination must be incorporated into the source's title V permit according to procedures established under title V, and any other regulations approved under title V in the jurisdiction in which the affected source is located.
  • (a) If the Administrator promulgates a relevant emission standard that is applicable to one or more affected sources within a major source before the date a permit application under this paragraph (a) is approved, the title V permit must contain the promulgated standard rather than the emission limitation determined under § 63.52, and the owner or operator must comply with the promulgated standard by the compliance date in the promulgated standard.

Citations to §63.52(a)(3)(i)

  • (3) The requirements in paragraphs (a)(3)(i) through (ii) of this section apply when the owner or operator has obtained a title V permit that incorporates a case-by-case MACT determination by the permitting authority under section 112(g) or has submitted a title V permit application for a revision that incorporates a case-by-case MACT determination under section 112(g), but has not submitted an application for a title V permit revision that addresses the emission limitation requirements of section 112(j).
    (i) When the owner or operator has a title V permit that incorporates a case-by-case MACT determination by the permitting authority under section 112(g), the owner or operator must submit an application meeting the requirements of § 63.53(a) for a title V permit revision within 30 days of the section 112(j) deadline or within 30 days of being notified in writing by the permitting authority that one or more sources at the major source belong in such category or subcategory. Using the procedures established in paragraph (e) of this section, the permitting authority must determine whether the emission limitations adopted pursuant to the prior case-by-case MACT determination under section 112(g) are substantially as effective as the emission limitations which the permitting authority would otherwise adopt pursuant to section 112(j) for the source in question. If the permitting authority determines that the emission limitations previously adopted to effectuate section 112(g) are substantially as effective as the emission limitations which the permitting authority would otherwise adopt to effectuate section 112(j) for the source, then the permitting authority must retain the existing emission limitations in the permit as the emission limitations to effectuate section 112(j). The title V permit applicable to that source must be revised accordingly. If the permitting authority does not retain the existing emission limitations in the permit as the emission limitations to effectuate section 112(j), the MACT requirements of this subpart are satisfied upon issuance of a revised title V permit incorporating any additional section 112(j) requirements.
    (ii) When the owner or operator has submitted a title V permit application that incorporates a case-by-case MACT determination by the permitting authority under section 112(g), but has not received the permit incorporating the section 112(g) requirements, the owner or operator must continue to pursue a title V permit that addresses the emission limitation requirements of section 112(g). Within 30 days of issuance of that title V permit, the owner or operator must submit an application meeting the requirements of § 63.53(a) for a change to the existing title V permit. Using the procedures established in paragraph (e) of this section, the permitting authority must determine whether the emission limitations adopted pursuant to the prior case-by-case MACT determination under section 112(g) are substantially as effective as the emission limitations which the permitting authority would otherwise adopt pursuant to section 112(j) for the source in question. If the permitting authority determines that the emission limitations previously adopted to effectuate section 112(g) are substantially as effective as the emission limitations which the permitting authority would otherwise adopt to effectuate section 112(j) for the source, then the permitting authority must retain the existing emission limitations in the permit as the emission limitations to effectuate section 112(j). The title V permit applicable to that source must be revised accordingly. If the permitting authority does not retain the existing emission limitations in the permit as the emission limitations to effectuate section 112(j), the MACT requirements of this subpart are satisfied upon issuance of a revised title V permit incorporating any additional section 112(j) requirements.

Citations to §63.52(a)(3)(ii)

  • (3) The requirements in paragraphs (a)(3)(i) through (ii) of this section apply when the owner or operator has obtained a title V permit that incorporates a case-by-case MACT determination by the permitting authority under section 112(g) or has submitted a title V permit application for a revision that incorporates a case-by-case MACT determination under section 112(g), but has not submitted an application for a title V permit revision that addresses the emission limitation requirements of section 112(j).
    (i) When the owner or operator has a title V permit that incorporates a case-by-case MACT determination by the permitting authority under section 112(g), the owner or operator must submit an application meeting the requirements of § 63.53(a) for a title V permit revision within 30 days of the section 112(j) deadline or within 30 days of being notified in writing by the permitting authority that one or more sources at the major source belong in such category or subcategory. Using the procedures established in paragraph (e) of this section, the permitting authority must determine whether the emission limitations adopted pursuant to the prior case-by-case MACT determination under section 112(g) are substantially as effective as the emission limitations which the permitting authority would otherwise adopt pursuant to section 112(j) for the source in question. If the permitting authority determines that the emission limitations previously adopted to effectuate section 112(g) are substantially as effective as the emission limitations which the permitting authority would otherwise adopt to effectuate section 112(j) for the source, then the permitting authority must retain the existing emission limitations in the permit as the emission limitations to effectuate section 112(j). The title V permit applicable to that source must be revised accordingly. If the permitting authority does not retain the existing emission limitations in the permit as the emission limitations to effectuate section 112(j), the MACT requirements of this subpart are satisfied upon issuance of a revised title V permit incorporating any additional section 112(j) requirements.
    (ii) When the owner or operator has submitted a title V permit application that incorporates a case-by-case MACT determination by the permitting authority under section 112(g), but has not received the permit incorporating the section 112(g) requirements, the owner or operator must continue to pursue a title V permit that addresses the emission limitation requirements of section 112(g). Within 30 days of issuance of that title V permit, the owner or operator must submit an application meeting the requirements of § 63.53(a) for a change to the existing title V permit. Using the procedures established in paragraph (e) of this section, the permitting authority must determine whether the emission limitations adopted pursuant to the prior case-by-case MACT determination under section 112(g) are substantially as effective as the emission limitations which the permitting authority would otherwise adopt pursuant to section 112(j) for the source in question. If the permitting authority determines that the emission limitations previously adopted to effectuate section 112(g) are substantially as effective as the emission limitations which the permitting authority would otherwise adopt to effectuate section 112(j) for the source, then the permitting authority must retain the existing emission limitations in the permit as the emission limitations to effectuate section 112(j). The title V permit applicable to that source must be revised accordingly. If the permitting authority does not retain the existing emission limitations in the permit as the emission limitations to effectuate section 112(j), the MACT requirements of this subpart are satisfied upon issuance of a revised title V permit incorporating any additional section 112(j) requirements.

Citations to §63.52(b)(1)

  • (b) The requirements of paragraphs (b)(1) through (4) of this section apply to sources that do not meet the criteria in paragraph (a) of this section on the section 112(j) deadline and are, therefore, not subject to section 112(j) on that date, but where events occur subsequent to the section 112(j) deadline that would bring the source under the requirements of this subpart, and the source does not have a title V permit that addresses the requirements of section 112(j).
    (1) When one or more sources in a category or subcategory subject to the requirements of this subpart are installed at a major source, or result in the source becoming a major source due to the installation, and the installation does not invoke section 112(g) requirements, the owner or operator must submit an application meeting the requirements of § 63.53(a) within 30 days of startup of the source. This application shall be reviewed using the procedures established in paragraph (e) of this section. Existing source MACT requirements (including relevant compliance deadlines), as specified in a title V permit issued pursuant to the requirements of this subpart, shall apply to such sources.
    (2) The requirements in this paragraph apply when one or more sources in a category or subcategory subject to this subpart are installed at a major source, or result in the source becoming a major source due to the installation, and the installation does require emission limitations to be established and permitted under section 112(g), and the owner or operator has not submitted an application for a title V permit revision that addresses the emission limitation requirements of section 112(j). In this case, the owner or operator must apply for and obtain a title V permit that addresses the emission limitation requirements of section 112(g). Within 30 days of issuance of that title V permit, the owner or operator must submit an application meeting the requirements of § 63.53(a) for a revision to the existing title V permit. Using the procedures established in paragraph (e) of this section, the permitting authority must determine whether the emission limitations adopted pursuant to the prior case-by-case MACT determination under section 112(g) are substantially as effective as the emission limitations which the permitting authority would otherwise adopt pursuant to section 112(j) for the source in question. If the permitting authority determines that the emission limitations previously adopted to effectuate section 112(g) are substantially as effective as the emission limitations which the permitting authority would otherwise adopt to effectuate section 112(j) for the source, then the permitting authority must retain the existing emission limitations in the permit as the emission limitations to effectuate section 112(j). The title V permit applicable to that source must be revised accordingly. If the permitting authority does not retain the existing emission limitations in the permit as the emission limitations to effectuate section 112(j), the MACT requirements of this subpart are satisfied upon issuance of a revised title V permit incorporating any additional section 112(j) requirements.
    (3) The owner or operator of an area source that, due to a relaxation in any federally enforceable emission limitation (such as a restriction on hours of operation), increases its potential to emit hazardous air pollutants such that the source becomes a major source that is subject to this subpart, must submit an application meeting the requirements of § 63.53(a) for a title V permit or for an application for a title V permit revision within 30 days after the date that such source becomes a major source. This application must be reviewed using the procedures established in paragraph (e) of this section. Existing source MACT requirements (including relevant compliance deadlines), as specified in a title V permit issued pursuant to the requirements of this subpart, must apply to such sources.
    (4) On or after April 5, 2002, if the Administrator establishes a lesser quantity emission rate under section 112(a)(1) of the Act that results in an area source becoming a major source that is subject to this subpart, then the owner or operator of such a major source must submit an application meeting the requirements of § 63.53(a) for a title V permit or for a change to an existing title V permit or pending title V permit on or before the date 6 months after the date that such source becomes a major source. Existing source MACT requirements (including relevant compliance deadlines), as specified in a title V permit issued pursuant to the requirements of this subpart, shall apply to such sources.

Citations to §63.52(b)(2)

  • (b) The requirements of paragraphs (b)(1) through (4) of this section apply to sources that do not meet the criteria in paragraph (a) of this section on the section 112(j) deadline and are, therefore, not subject to section 112(j) on that date, but where events occur subsequent to the section 112(j) deadline that would bring the source under the requirements of this subpart, and the source does not have a title V permit that addresses the requirements of section 112(j).
    (1) When one or more sources in a category or subcategory subject to the requirements of this subpart are installed at a major source, or result in the source becoming a major source due to the installation, and the installation does not invoke section 112(g) requirements, the owner or operator must submit an application meeting the requirements of § 63.53(a) within 30 days of startup of the source. This application shall be reviewed using the procedures established in paragraph (e) of this section. Existing source MACT requirements (including relevant compliance deadlines), as specified in a title V permit issued pursuant to the requirements of this subpart, shall apply to such sources.
    (2) The requirements in this paragraph apply when one or more sources in a category or subcategory subject to this subpart are installed at a major source, or result in the source becoming a major source due to the installation, and the installation does require emission limitations to be established and permitted under section 112(g), and the owner or operator has not submitted an application for a title V permit revision that addresses the emission limitation requirements of section 112(j). In this case, the owner or operator must apply for and obtain a title V permit that addresses the emission limitation requirements of section 112(g). Within 30 days of issuance of that title V permit, the owner or operator must submit an application meeting the requirements of § 63.53(a) for a revision to the existing title V permit. Using the procedures established in paragraph (e) of this section, the permitting authority must determine whether the emission limitations adopted pursuant to the prior case-by-case MACT determination under section 112(g) are substantially as effective as the emission limitations which the permitting authority would otherwise adopt pursuant to section 112(j) for the source in question. If the permitting authority determines that the emission limitations previously adopted to effectuate section 112(g) are substantially as effective as the emission limitations which the permitting authority would otherwise adopt to effectuate section 112(j) for the source, then the permitting authority must retain the existing emission limitations in the permit as the emission limitations to effectuate section 112(j). The title V permit applicable to that source must be revised accordingly. If the permitting authority does not retain the existing emission limitations in the permit as the emission limitations to effectuate section 112(j), the MACT requirements of this subpart are satisfied upon issuance of a revised title V permit incorporating any additional section 112(j) requirements.
    (3) The owner or operator of an area source that, due to a relaxation in any federally enforceable emission limitation (such as a restriction on hours of operation), increases its potential to emit hazardous air pollutants such that the source becomes a major source that is subject to this subpart, must submit an application meeting the requirements of § 63.53(a) for a title V permit or for an application for a title V permit revision within 30 days after the date that such source becomes a major source. This application must be reviewed using the procedures established in paragraph (e) of this section. Existing source MACT requirements (including relevant compliance deadlines), as specified in a title V permit issued pursuant to the requirements of this subpart, must apply to such sources.
    (4) On or after April 5, 2002, if the Administrator establishes a lesser quantity emission rate under section 112(a)(1) of the Act that results in an area source becoming a major source that is subject to this subpart, then the owner or operator of such a major source must submit an application meeting the requirements of § 63.53(a) for a title V permit or for a change to an existing title V permit or pending title V permit on or before the date 6 months after the date that such source becomes a major source. Existing source MACT requirements (including relevant compliance deadlines), as specified in a title V permit issued pursuant to the requirements of this subpart, shall apply to such sources.

Citations to §63.52(b)(3)

  • (b) The requirements of paragraphs (b)(1) through (4) of this section apply to sources that do not meet the criteria in paragraph (a) of this section on the section 112(j) deadline and are, therefore, not subject to section 112(j) on that date, but where events occur subsequent to the section 112(j) deadline that would bring the source under the requirements of this subpart, and the source does not have a title V permit that addresses the requirements of section 112(j).
    (1) When one or more sources in a category or subcategory subject to the requirements of this subpart are installed at a major source, or result in the source becoming a major source due to the installation, and the installation does not invoke section 112(g) requirements, the owner or operator must submit an application meeting the requirements of § 63.53(a) within 30 days of startup of the source. This application shall be reviewed using the procedures established in paragraph (e) of this section. Existing source MACT requirements (including relevant compliance deadlines), as specified in a title V permit issued pursuant to the requirements of this subpart, shall apply to such sources.
    (2) The requirements in this paragraph apply when one or more sources in a category or subcategory subject to this subpart are installed at a major source, or result in the source becoming a major source due to the installation, and the installation does require emission limitations to be established and permitted under section 112(g), and the owner or operator has not submitted an application for a title V permit revision that addresses the emission limitation requirements of section 112(j). In this case, the owner or operator must apply for and obtain a title V permit that addresses the emission limitation requirements of section 112(g). Within 30 days of issuance of that title V permit, the owner or operator must submit an application meeting the requirements of § 63.53(a) for a revision to the existing title V permit. Using the procedures established in paragraph (e) of this section, the permitting authority must determine whether the emission limitations adopted pursuant to the prior case-by-case MACT determination under section 112(g) are substantially as effective as the emission limitations which the permitting authority would otherwise adopt pursuant to section 112(j) for the source in question. If the permitting authority determines that the emission limitations previously adopted to effectuate section 112(g) are substantially as effective as the emission limitations which the permitting authority would otherwise adopt to effectuate section 112(j) for the source, then the permitting authority must retain the existing emission limitations in the permit as the emission limitations to effectuate section 112(j). The title V permit applicable to that source must be revised accordingly. If the permitting authority does not retain the existing emission limitations in the permit as the emission limitations to effectuate section 112(j), the MACT requirements of this subpart are satisfied upon issuance of a revised title V permit incorporating any additional section 112(j) requirements.
    (3) The owner or operator of an area source that, due to a relaxation in any federally enforceable emission limitation (such as a restriction on hours of operation), increases its potential to emit hazardous air pollutants such that the source becomes a major source that is subject to this subpart, must submit an application meeting the requirements of § 63.53(a) for a title V permit or for an application for a title V permit revision within 30 days after the date that such source becomes a major source. This application must be reviewed using the procedures established in paragraph (e) of this section. Existing source MACT requirements (including relevant compliance deadlines), as specified in a title V permit issued pursuant to the requirements of this subpart, must apply to such sources.
    (4) On or after April 5, 2002, if the Administrator establishes a lesser quantity emission rate under section 112(a)(1) of the Act that results in an area source becoming a major source that is subject to this subpart, then the owner or operator of such a major source must submit an application meeting the requirements of § 63.53(a) for a title V permit or for a change to an existing title V permit or pending title V permit on or before the date 6 months after the date that such source becomes a major source. Existing source MACT requirements (including relevant compliance deadlines), as specified in a title V permit issued pursuant to the requirements of this subpart, shall apply to such sources.

Citations to §63.52(b)(4)

  • (b) The requirements of paragraphs (b)(1) through (4) of this section apply to sources that do not meet the criteria in paragraph (a) of this section on the section 112(j) deadline and are, therefore, not subject to section 112(j) on that date, but where events occur subsequent to the section 112(j) deadline that would bring the source under the requirements of this subpart, and the source does not have a title V permit that addresses the requirements of section 112(j).
    (1) When one or more sources in a category or subcategory subject to the requirements of this subpart are installed at a major source, or result in the source becoming a major source due to the installation, and the installation does not invoke section 112(g) requirements, the owner or operator must submit an application meeting the requirements of § 63.53(a) within 30 days of startup of the source. This application shall be reviewed using the procedures established in paragraph (e) of this section. Existing source MACT requirements (including relevant compliance deadlines), as specified in a title V permit issued pursuant to the requirements of this subpart, shall apply to such sources.
    (2) The requirements in this paragraph apply when one or more sources in a category or subcategory subject to this subpart are installed at a major source, or result in the source becoming a major source due to the installation, and the installation does require emission limitations to be established and permitted under section 112(g), and the owner or operator has not submitted an application for a title V permit revision that addresses the emission limitation requirements of section 112(j). In this case, the owner or operator must apply for and obtain a title V permit that addresses the emission limitation requirements of section 112(g). Within 30 days of issuance of that title V permit, the owner or operator must submit an application meeting the requirements of § 63.53(a) for a revision to the existing title V permit. Using the procedures established in paragraph (e) of this section, the permitting authority must determine whether the emission limitations adopted pursuant to the prior case-by-case MACT determination under section 112(g) are substantially as effective as the emission limitations which the permitting authority would otherwise adopt pursuant to section 112(j) for the source in question. If the permitting authority determines that the emission limitations previously adopted to effectuate section 112(g) are substantially as effective as the emission limitations which the permitting authority would otherwise adopt to effectuate section 112(j) for the source, then the permitting authority must retain the existing emission limitations in the permit as the emission limitations to effectuate section 112(j). The title V permit applicable to that source must be revised accordingly. If the permitting authority does not retain the existing emission limitations in the permit as the emission limitations to effectuate section 112(j), the MACT requirements of this subpart are satisfied upon issuance of a revised title V permit incorporating any additional section 112(j) requirements.
    (3) The owner or operator of an area source that, due to a relaxation in any federally enforceable emission limitation (such as a restriction on hours of operation), increases its potential to emit hazardous air pollutants such that the source becomes a major source that is subject to this subpart, must submit an application meeting the requirements of § 63.53(a) for a title V permit or for an application for a title V permit revision within 30 days after the date that such source becomes a major source. This application must be reviewed using the procedures established in paragraph (e) of this section. Existing source MACT requirements (including relevant compliance deadlines), as specified in a title V permit issued pursuant to the requirements of this subpart, must apply to such sources.
    (4) On or after April 5, 2002, if the Administrator establishes a lesser quantity emission rate under section 112(a)(1) of the Act that results in an area source becoming a major source that is subject to this subpart, then the owner or operator of such a major source must submit an application meeting the requirements of § 63.53(a) for a title V permit or for a change to an existing title V permit or pending title V permit on or before the date 6 months after the date that such source becomes a major source. Existing source MACT requirements (including relevant compliance deadlines), as specified in a title V permit issued pursuant to the requirements of this subpart, shall apply to such sources.

Citations to §63.52(c)(1)

  • The requirements of this section apply to an owner or operator who constructs a new affected source subject to § 63.52(c)(1). The purpose of this section is to describe alternative review processes that the permitting authority may use to make a MACT determination for the new affected source.

Citations to §63.52(f)

Citations to §63.52(f)(2)

  • (d) Any final equivalent emission limitation for an affected source which is issued by the permitting authority pursuant to §§ 63.50 through 63.56 prior to promulgation of a generally applicable Federal standard governing that source under section 112(d) or 112(h) of the Act shall be deemed an applicable Federal requirement adopted pursuant to section 112(j) of the Act. Each such equivalent emission limitation shall take effect upon issuance of the permit containing that limitation under section 112(j)(5) of the Act, and shall remain applicable to the source until such time as it may be revised or supplanted pursuant to the procedures established by §§ 63.50 through 63.56. Such a final equivalent emission limitation, and all associated requirements adopted pursuant to § 63.52(f)(2), are directly enforceable under Federal law regardless of whether or not any permit in which they may be contained remains in effect.

Citations to §63.52(f)(2)(i)

  • (2) The title V permit must specify any notification, operation and maintenance, performance testing, monitoring, and reporting and recordkeeping requirements. In developing the title V permit, the permitting authority must consider and specify the appropriate provisions of subpart A of this part. The title V permit must also include the information in paragraphs (f)(2)(i) through (iii) of this section.
    (i) In addition to the MACT emission limitation required by paragraph (f)(1) of this section, additional emission limits, production limits, operational limits or other terms and conditions necessary to ensure practicable enforceability of the MACT emission limitation.
    (ii) Compliance certifications, testing, monitoring, reporting and recordkeeping requirements that are consistent with requirements established pursuant to title V and paragraph (h) of this section.
    (iii) Compliance dates by which the owner or operator must be in compliance with the MACT emission limitation and all other applicable terms and conditions of the permit.
    (A) The owner or operator of an affected source subject to the requirements of this subpart must comply with the emission limitation(s) by the date established in the source's title V permit. In no case shall such compliance date be later than 3 years after the issuance of the permit for that source, except where the permitting authority issues a permit that grants an additional year to comply in accordance with section 112(i)(3)(B) of the Act, or unless otherwise specified in section 112(i), or in subpart D of this part.
    (B) The owner or operator of a new affected source, as defined in the title V permit meeting the requirements of section 112(j), that is subject to the requirements of this subpart must comply with a new source MACT level of control immediately upon startup of the new affected source.

Citations to §63.52(f)(2)(ii)

  • (2) The title V permit must specify any notification, operation and maintenance, performance testing, monitoring, and reporting and recordkeeping requirements. In developing the title V permit, the permitting authority must consider and specify the appropriate provisions of subpart A of this part. The title V permit must also include the information in paragraphs (f)(2)(i) through (iii) of this section.
    (i) In addition to the MACT emission limitation required by paragraph (f)(1) of this section, additional emission limits, production limits, operational limits or other terms and conditions necessary to ensure practicable enforceability of the MACT emission limitation.
    (ii) Compliance certifications, testing, monitoring, reporting and recordkeeping requirements that are consistent with requirements established pursuant to title V and paragraph (h) of this section.
    (iii) Compliance dates by which the owner or operator must be in compliance with the MACT emission limitation and all other applicable terms and conditions of the permit.
    (A) The owner or operator of an affected source subject to the requirements of this subpart must comply with the emission limitation(s) by the date established in the source's title V permit. In no case shall such compliance date be later than 3 years after the issuance of the permit for that source, except where the permitting authority issues a permit that grants an additional year to comply in accordance with section 112(i)(3)(B) of the Act, or unless otherwise specified in section 112(i), or in subpart D of this part.
    (B) The owner or operator of a new affected source, as defined in the title V permit meeting the requirements of section 112(j), that is subject to the requirements of this subpart must comply with a new source MACT level of control immediately upon startup of the new affected source.

Citations to §63.52(f)(2)(iii)

  • (2) The title V permit must specify any notification, operation and maintenance, performance testing, monitoring, and reporting and recordkeeping requirements. In developing the title V permit, the permitting authority must consider and specify the appropriate provisions of subpart A of this part. The title V permit must also include the information in paragraphs (f)(2)(i) through (iii) of this section.
    (i) In addition to the MACT emission limitation required by paragraph (f)(1) of this section, additional emission limits, production limits, operational limits or other terms and conditions necessary to ensure practicable enforceability of the MACT emission limitation.
    (ii) Compliance certifications, testing, monitoring, reporting and recordkeeping requirements that are consistent with requirements established pursuant to title V and paragraph (h) of this section.
    (iii) Compliance dates by which the owner or operator must be in compliance with the MACT emission limitation and all other applicable terms and conditions of the permit.
    (A) The owner or operator of an affected source subject to the requirements of this subpart must comply with the emission limitation(s) by the date established in the source's title V permit. In no case shall such compliance date be later than 3 years after the issuance of the permit for that source, except where the permitting authority issues a permit that grants an additional year to comply in accordance with section 112(i)(3)(B) of the Act, or unless otherwise specified in section 112(i), or in subpart D of this part.
    (B) The owner or operator of a new affected source, as defined in the title V permit meeting the requirements of section 112(j), that is subject to the requirements of this subpart must comply with a new source MACT level of control immediately upon startup of the new affected source.

Citations to §63.52(h)

  • (e) An owner or operator of a major source that is subject to a MACT determination must comply with notification, operation and maintenance, performance testing, monitoring, reporting, and recordkeeping requirements established under § 63.52(h), under title V, and at the discretion of the permitting authority, under subpart A of this part. The permitting authority must provide the EPA with the opportunity to review compliance requirements for consistency with requirements established pursuant to title V during the review period under paragraph (d) of this section.