§63.490. Batch front-end process vents—performance test methods and procedures to determine compliance.
40 C.F.R. § 63.490
(1) The control device inlet sampling site shall be located at the exit from the batch unit operation before any control device. Section 63.488(a)(2) describes those recovery devices considered part of the unit operation. Inlet sampling sites would be after these specified recovery devices.
(2) If a batch process vent is introduced with the combustion air or as a secondary fuel into a boiler or process heater with a design capacity less than 44 megawatts, selection of the location of the inlet sampling sites shall ensure the measurement of total organic HAP or TOC (minus methane and ethane) concentrations in all batch front-end process vents and primary and secondary fuels introduced into the boiler or process heater.
(1) The organic HAP used as the calibration gas for Method 25A appendix A-7 to 40 CFR part 60 must be the single organic HAP representing the largest percent by volume of the emissions.
(2) The use of Method 25A appendix A-7 to 40 CFR part 60 is acceptable if the response from the high-level calibration gas is at least 20 times the standard deviation of the response from the zero calibration gas when the instrument is zeroed on the most sensitive scale.
Notes, amendments, and revision history
Amendments
[62 FR 46925, Sept. 5, 1996, as amended at 64 FR 11542, Mar. 9, 1999; 65 FR 38060, June 19, 2000; 89 FR 43248, May 16, 2024]
Source
Source: 62 FR 46925, Sept. 5, 1996, unless otherwise noted.
Authority
Authority: 42 U.S.C. 7401 et seq.
Source
Source: 57 FR 61992, Dec. 29, 1992, unless otherwise noted.
Amendments
[62 FR 46925, Sept. 5, 1996, as amended at 64 FR 11542, Mar. 9, 1999; 65 FR 38060, June 19, 2000; 89 FR 43248, May 16, 2024]