(c) When the term “storage vessel” is used in §§ 63.119 through 63.123, the definition of this term in § 63.482 shall apply for the purposes of this subpart.
-
(b) When the term “process vent” is used in §§ 63.113 through 63.118, the term “continuous front-end process vent,” and the definition of this term in § 63.482 shall apply for the purposes of this subpart.
-
(b) Aggregate batch vent streams, as defined in § 63.482, are subject to the control requirements specified in § 63.487(b), as well as the monitoring, testing, recordkeeping, and reporting requirements specified in §§ 63.489 through 63.492 for aggregate batch vent streams.
-
(ii) Halogenated batch front-end process vents, as defined in § 63.482, shall not be vented to a flare.
-
(2) The annual uncontrolled organic HAP or TOC emissions and annual average batch vent flow rate shall be determined at the exit from the batch unit operation. For the purposes of these determinations, the primary condenser operating as a reflux condenser on a reactor or distillation column, the primary condenser recovering monomer, reaction products, by-products, or solvent from a stripper operated in batch mode, and the primary condenser recovering monomer, reaction products, by-products, or solvent from a distillation operation operated in batch mode shall be considered part of the batch unit operation. All other devices that recover or oxidize organic HAP or TOC vapors shall be considered control devices as defined in § 63.482.
-
(A) The first adsorber in series must be replaced immediately when breakthrough, as defined in § 63.482, is detected between the first and second adsorber. The original second adsorber (or a fresh canister) will become the new first adsorber and a fresh adsorber will become the second adsorber. For purposes of this paragraph, “immediately” means within 8 hours of the detection of a breakthrough for adsorbers of 55 gallons or less, and within 24 hours of the detection of a breakthrough for adsorbers greater than 55 gallons. The owner or operator must monitor at the outlet of the first adsorber within 3 days of replacement to confirm it is performing properly.
-
(7) For each affected source as described in § 63.480, beginning no later than the compliance dates specified in § 63.481(o), if the back-end process vent contains chloroprene such that it is considered to be in chloroprene service, as defined in § 63.482, then the owner or operator must comply with the requirements of paragraphs (a)(7)(i) through (iii) of this section in addition to all other applicable requirements specified in § 63.483 and elsewhere in this section.(i) Reduce emissions of chloroprene by venting emissions through a closed vent system to a non-flare control device that reduces chloroprene by greater than or equal to 98 percent by weight, or to a concentration less than 1 ppmv for each process vent or to less than 5 pounds per year for all combined process vents within the process. If a combustion device is used, the chloroprene concentration of 1 ppmv must be corrected to 3 percent oxygen.(ii) To demonstrate compliance with the emission limits specified in paragraph (a)(7)(i) of this section for back-end process vents in chloroprene service, owners and operators must meet the requirements specified in § 63.510.(iii) An owner or operator may designate a back-end process vent in chloroprene service as a maintenance vent if the vent is only used as a result of startup, shutdown, maintenance, or inspection of equipment where equipment is emptied, depressurized, degassed, or placed into service; however, owners and operators may not release more than 1.0 tons of chloroprene from all maintenance vents combined (i.e., including maintenance vents subject to this paragraph (a)(7)(iii), § 63.485(z), or § 63.487(i)(4)) per any consecutive 12-month period. The owner or operator must keep monthly records of the quantity in tons of chloroprene released from each maintenance vent and include a description of the method used to estimate this quantity.
-
(A) The first adsorber in series must be replaced immediately when breakthrough, as defined in § 63.482, is detected between the first and second adsorber. The original second adsorber (or a fresh canister) will become the new first adsorber and a fresh adsorber will become the second adsorber. For purposes of this paragraph, “immediately” means within 8 hours of the detection of a breakthrough for adsorbers of 55 gallons or less, and within 24 hours of the detection of a breakthrough for adsorbers greater than 55 gallons. The owner or operator must monitor at the outlet of the first adsorber within 3 days of replacement to confirm it is performing properly.
-
(ii) When §§ 63.132 through 63.149 refer to table 9 compounds, the owner or operator is only required to consider compounds that meet the definition of organic HAP in § 63.482 and that are listed in table 9 to 40 CFR part 63, subpart G, for the purposes of this subpart.
-
(8) § 63.104(k) of subpart F of this part does not apply. Instead for each source as described in § 63.480, beginning no later than the compliance dates specified in § 63.481(n), owners and operators must not inject water into or dispose of water through any heat exchange system in an EPPU if the water contains any amount of chloroprene, has been in contact with any process stream containing chloroprene, or the water is considered wastewater as defined in § 63.482.
-
(A) The required information shall include the identification of all emission points and process back-end operations in the planned emissions average and, where applicable, notation of whether each storage vessel, continuous front-end process vent, batch front-end process vent, aggregate batch vents stream, and process wastewater stream is a Group 1 or Group 2 emission point, as defined in § 63.482 or as designated under § 63.503(c)(2).
-
This section applies beginning no later than the compliance dates specified in § 63.481(o). To determine if process vents, storage vessels, or wastewater in a process at affected sources producing neoprene are in chloroprene service, as defined in § 63.482, owners and operators must comply with the requirements in paragraphs (a) through (c) of this section, as applicable.
-
(a) For all affected sources complying with the batch process vent testing provisions in § 63.490(c) and the operating limit provisions in § 63.505(c), the terms used in this subpart and in subpart U of this part are defined in § 63.482 and paragraph (g) of this section.
Citations to §63.482(b)
-
(A) The replacement of components meets the definition of reconstruction in § 63.482(b); and
-
(8) Whenever §§ 63.132 through 63.149 refer to a “chemical manufacturing process unit,” the term “elastomer product process unit,” (or EPPU) as defined in § 63.482, shall apply for the purposes of this subpart. In addition, when § 63.149 refers to “a chemical manufacturing process unit that meets the criteria of § 63.100(b) of subpart F of this part,” the term “an EPPU as defined in § 63.482(b)” shall apply for the purposes of this subpart.
-
(l) When the term “equipment” is used in subpart H of this part, the definition of this term in § 63.482(b) shall apply for the purposes of this subpart.