§63.481. Compliance dates and relationship of this subpart to existing applicable rules. — Inbound Citations
40 C.F.R. § 63.481
Statutory Authority
Cited by 78 regulations in release Current.
Citations to 40 C.F.R. § 63.481 as a whole
-
(ii) If any components are replaced at an existing affected source such that the criteria specified in paragraphs (i)(2)(i)(A) and (i)(2)(i)(B) of this section are not met and that replacement of components creates one or more emission points (i.e., either newly created Group 1 emission points or emission points that change from Group 2 to Group 1) or causes any other emission point to be added (i.e., Group 2 emission points, back-end process operations subject to §§ 63.493 and 63.500, and heat exchange systems and equipment leak components subject to § 63.502), the resulting emission point(s) shall be subject to the applicable requirements for an existing affected source. The resulting emission point(s) shall be in compliance by 120 days after the date of initial start-up or by the appropriate compliance date specified in § 63.481 (i.e., July 31, 1997 for most equipment leak components subject to § 63.502, and June 19, 2001 for emission points other than equipment leaks), whichever is later.
-
(r) When § 63.119(a) requires compliance according to the schedule provisions in § 63.100, owners and operators of affected sources shall instead comply with the requirements in §§ 63.119(a)(1) through 63.119(a)(4) by the compliance date for storage vessels, which is specified in § 63.481.
-
(2) Whenever a process change, as defined in § 63.115(e), is made that causes a Group 2 continuous front-end process vent with a TRE greater than 4.0 to become a Group 2 continuous front-end process vent with a TRE less than 4.0, the owner or operator shall submit a report within 180 days after the process change is made or with the next Periodic Report, whichever is later. A description of the process change shall be submitted with the report of the process change, and the owner or operator shall comply with the provisions in § 63.113(d) by the dates specified in § 63.481.
-
-
(1) Approval of alternatives to the requirements in §§ 63.480 through 63.481, 63.483(a) through (c), 63.484, 63.485(a) through (k), (m) through (s), (u), 63.486 through 63.487, 63.488(a), (b)(1) through (4), (5)(iv) through (v), (6) through (7), (c) through (i), 63.493 through 63.494, 63.500(a)(1) through (3), (b), 63.501, 63.502(a) through (f), (i), (k) through (m), and 63.503. Where these standards reference another subpart, the cited provisions will be delegated according to the delegation provisions of the referenced subpart. Where these standards reference another subpart and modify the requirements, the requirements shall be modified as described in this subpart. Delegation of the modified requirements will also occur according to the delegation provisions of the referenced subpart.
Citations to §63.481(b)
-
(a) Affected sources are required to achieve compliance on or before the dates specified in paragraphs (b) through (d) of this section and paragraphs (n) and (o) of this section. Paragraph (e) of this section provides information on requesting compliance extensions. Paragraphs (f) through (l) of this section discuss the relationship of this subpart to subpart A and to other applicable rules. Where an override of another authority of the Act is indicated in this subpart, only compliance with the provisions of this subpart is required. Paragraph (m) of this section specifies the meaning of time periods.
Citations to §63.481(c)
-
(a) Affected sources are required to achieve compliance on or before the dates specified in paragraphs (b) through (d) of this section and paragraphs (n) and (o) of this section. Paragraph (e) of this section provides information on requesting compliance extensions. Paragraphs (f) through (l) of this section discuss the relationship of this subpart to subpart A and to other applicable rules. Where an override of another authority of the Act is indicated in this subpart, only compliance with the provisions of this subpart is required. Paragraph (m) of this section specifies the meaning of time periods.
Citations to §63.481(c)(1)
-
(c) With the exceptions provided in paragraphs (c)(1) through (3) of this section and paragraphs (n) and (o) of this section, existing affected sources shall be in compliance with this subpart no later than June 19, 2001, as provided in § 63.6(c), unless an extension has been granted as specified in paragraph (e) of this section.(1) Existing affected sources producing epichlorohydrin elastomer, butyl rubber, neoprene rubber, and nitrile butadiene rubber shall be in compliance with the applicable emission limitation in § 63.494(a)(4) no later than April 23, 2012.(2) Existing affected sources producing butyl rubber and ethylene propylene rubber shall be in compliance with § 63.485(q)(1) no later than April 23, 2012.(3) Compliance with § 63.502 is covered by paragraph (d) of this section.
Citations to §63.481(c)(2)
-
(c) With the exceptions provided in paragraphs (c)(1) through (3) of this section and paragraphs (n) and (o) of this section, existing affected sources shall be in compliance with this subpart no later than June 19, 2001, as provided in § 63.6(c), unless an extension has been granted as specified in paragraph (e) of this section.(1) Existing affected sources producing epichlorohydrin elastomer, butyl rubber, neoprene rubber, and nitrile butadiene rubber shall be in compliance with the applicable emission limitation in § 63.494(a)(4) no later than April 23, 2012.(2) Existing affected sources producing butyl rubber and ethylene propylene rubber shall be in compliance with § 63.485(q)(1) no later than April 23, 2012.(3) Compliance with § 63.502 is covered by paragraph (d) of this section.
Citations to §63.481(c)(3)
-
(c) With the exceptions provided in paragraphs (c)(1) through (3) of this section and paragraphs (n) and (o) of this section, existing affected sources shall be in compliance with this subpart no later than June 19, 2001, as provided in § 63.6(c), unless an extension has been granted as specified in paragraph (e) of this section.(1) Existing affected sources producing epichlorohydrin elastomer, butyl rubber, neoprene rubber, and nitrile butadiene rubber shall be in compliance with the applicable emission limitation in § 63.494(a)(4) no later than April 23, 2012.(2) Existing affected sources producing butyl rubber and ethylene propylene rubber shall be in compliance with § 63.485(q)(1) no later than April 23, 2012.(3) Compliance with § 63.502 is covered by paragraph (d) of this section.
Citations to §63.481(d)
-
(4) If predominant use cannot be determined for recovery operations equipment that is shared among process units and if one of those process units is an EPPU subject to this subpart, the recovery operations equipment shall be assigned to the EPPU subject to this subpart.
-
(a) Affected sources are required to achieve compliance on or before the dates specified in paragraphs (b) through (d) of this section and paragraphs (n) and (o) of this section. Paragraph (e) of this section provides information on requesting compliance extensions. Paragraphs (f) through (l) of this section discuss the relationship of this subpart to subpart A and to other applicable rules. Where an override of another authority of the Act is indicated in this subpart, only compliance with the provisions of this subpart is required. Paragraph (m) of this section specifies the meaning of time periods.
-
(c) The compliance date for the equipment leak provisions in this section is provided in § 63.481(d). Whenever subpart H of this part refers to the compliance dates specified in any paragraph contained in § 63.100, the compliance dates listed in § 63.481(d) shall instead apply, for the purposes of this subpart. When § 63.182(c)(4) refers to “sources subject to subpart F,” the phrase “sources subject to this subpart” shall apply, for the purposes of this subpart. In addition, extensions of compliance dates are addressed by § 63.481(e) instead of by § 63.182(a)(6), for the purposes of this subpart.
Citations to §63.481(d)(1)
-
(d) Except as provided for in paragraphs (d)(1) through (d)(6) of this section, and paragraphs (n) and (o) of this section, existing affected sources shall be in compliance with § 63.502 no later than July 31, 1997, unless an extension has been granted pursuant to paragraph (e) of this section.(1) Compliance with the compressor provisions of § 63.164 shall occur no later than September 5, 1997 for any compressor meeting one or more of the criteria in paragraphs (d)(1)(i) through (d)(1)(iv) of this section, if the work can be accomplished without a process unit shutdown, as defined in § 63.161.(i) The seal system will be replaced;(ii) A barrier fluid system will be installed;(iii) A new barrier fluid will be utilized which requires changes to the existing barrier fluid system; or(iv) The compressor will be modified to permit connecting the compressor to a fuel gas system or closed vent system, or be modified so that emissions from the compressor can be routed to a process.(2) Compliance with the compressor provisions of § 63.164 shall occur no later than March 5, 1998, for any compressor meeting all the criteria in paragraphs (d)(2)(i) through (d)(2)(iv) of this section.(i) The compressor meets one or more of the criteria specified in paragraphs (d)(1)(i) through (d)(1)(iv) of this section;(ii) The work can be accomplished without a process unit shutdown as defined in § 63.161;(iii) The additional time is actually necessary, due to the unavailability of parts beyond the control of the owner or operator; and(iv) The owner or operator submits the request for a compliance extension to the appropriate U.S. Environmental Protection Agency (EPA) Regional Office at the address listed in § 63.13 no later than 45 days before the compliance date. The request for a compliance extension shall contain the information specified in § 63.6(i)(6)(i)(A), (B), and (D). Unless the EPA Regional Office objects to the request for a compliance extension within 30 days after receipt of the request, the request shall be deemed approved.(3) If compliance with the compressor provisions of § 63.164 cannot reasonably be achieved without a process unit shutdown, the owner or operator shall achieve compliance no later than September 5, 1998. The owner or operator who elects to use this provision shall submit a request for an extension of compliance in accordance with the requirements of paragraph (d)(2)(iv) of this section.(4) Compliance with the compressor provisions of § 63.164 shall occur no later than September 5, 1999 for any compressor meeting one or more of the criteria in paragraphs (d)(4)(i) through (d)(4)(iii) of this section. The owner or operator who elects to use these provisions shall submit a request for an extension of compliance in accordance with the requirements of paragraph (d)(2)(iv) of this section.(i) Compliance cannot be achieved without replacing the compressor;(ii) Compliance cannot be achieved without recasting the distance piece; or(5) Compliance with the surge control vessel and bottoms receiver provisions of § 63.170 shall occur no later than June 19, 2001.(6) Compliance with the heat exchange system provisions of § 63.104 shall occur no later than June 19, 2001.
Citations to §63.481(d)(1)(i)
-
(1) Compliance with the compressor provisions of § 63.164 shall occur no later than September 5, 1997 for any compressor meeting one or more of the criteria in paragraphs (d)(1)(i) through (d)(1)(iv) of this section, if the work can be accomplished without a process unit shutdown, as defined in § 63.161.(i) The seal system will be replaced;(ii) A barrier fluid system will be installed;(iii) A new barrier fluid will be utilized which requires changes to the existing barrier fluid system; or(iv) The compressor will be modified to permit connecting the compressor to a fuel gas system or closed vent system, or be modified so that emissions from the compressor can be routed to a process.
Citations to §63.481(d)(1)(ii)
-
(1) Compliance with the compressor provisions of § 63.164 shall occur no later than September 5, 1997 for any compressor meeting one or more of the criteria in paragraphs (d)(1)(i) through (d)(1)(iv) of this section, if the work can be accomplished without a process unit shutdown, as defined in § 63.161.(i) The seal system will be replaced;(ii) A barrier fluid system will be installed;(iii) A new barrier fluid will be utilized which requires changes to the existing barrier fluid system; or(iv) The compressor will be modified to permit connecting the compressor to a fuel gas system or closed vent system, or be modified so that emissions from the compressor can be routed to a process.
Citations to §63.481(d)(1)(iii)
-
(1) Compliance with the compressor provisions of § 63.164 shall occur no later than September 5, 1997 for any compressor meeting one or more of the criteria in paragraphs (d)(1)(i) through (d)(1)(iv) of this section, if the work can be accomplished without a process unit shutdown, as defined in § 63.161.(i) The seal system will be replaced;(ii) A barrier fluid system will be installed;(iii) A new barrier fluid will be utilized which requires changes to the existing barrier fluid system; or(iv) The compressor will be modified to permit connecting the compressor to a fuel gas system or closed vent system, or be modified so that emissions from the compressor can be routed to a process.
Citations to §63.481(d)(1)(iv)
-
(1) Compliance with the compressor provisions of § 63.164 shall occur no later than September 5, 1997 for any compressor meeting one or more of the criteria in paragraphs (d)(1)(i) through (d)(1)(iv) of this section, if the work can be accomplished without a process unit shutdown, as defined in § 63.161.(i) The seal system will be replaced;(ii) A barrier fluid system will be installed;(iii) A new barrier fluid will be utilized which requires changes to the existing barrier fluid system; or(iv) The compressor will be modified to permit connecting the compressor to a fuel gas system or closed vent system, or be modified so that emissions from the compressor can be routed to a process.
Citations to §63.481(d)(2)
-
(d) Except as provided for in paragraphs (d)(1) through (d)(6) of this section, and paragraphs (n) and (o) of this section, existing affected sources shall be in compliance with § 63.502 no later than July 31, 1997, unless an extension has been granted pursuant to paragraph (e) of this section.(1) Compliance with the compressor provisions of § 63.164 shall occur no later than September 5, 1997 for any compressor meeting one or more of the criteria in paragraphs (d)(1)(i) through (d)(1)(iv) of this section, if the work can be accomplished without a process unit shutdown, as defined in § 63.161.(i) The seal system will be replaced;(ii) A barrier fluid system will be installed;(iii) A new barrier fluid will be utilized which requires changes to the existing barrier fluid system; or(iv) The compressor will be modified to permit connecting the compressor to a fuel gas system or closed vent system, or be modified so that emissions from the compressor can be routed to a process.(2) Compliance with the compressor provisions of § 63.164 shall occur no later than March 5, 1998, for any compressor meeting all the criteria in paragraphs (d)(2)(i) through (d)(2)(iv) of this section.(i) The compressor meets one or more of the criteria specified in paragraphs (d)(1)(i) through (d)(1)(iv) of this section;(ii) The work can be accomplished without a process unit shutdown as defined in § 63.161;(iii) The additional time is actually necessary, due to the unavailability of parts beyond the control of the owner or operator; and(iv) The owner or operator submits the request for a compliance extension to the appropriate U.S. Environmental Protection Agency (EPA) Regional Office at the address listed in § 63.13 no later than 45 days before the compliance date. The request for a compliance extension shall contain the information specified in § 63.6(i)(6)(i)(A), (B), and (D). Unless the EPA Regional Office objects to the request for a compliance extension within 30 days after receipt of the request, the request shall be deemed approved.(3) If compliance with the compressor provisions of § 63.164 cannot reasonably be achieved without a process unit shutdown, the owner or operator shall achieve compliance no later than September 5, 1998. The owner or operator who elects to use this provision shall submit a request for an extension of compliance in accordance with the requirements of paragraph (d)(2)(iv) of this section.(4) Compliance with the compressor provisions of § 63.164 shall occur no later than September 5, 1999 for any compressor meeting one or more of the criteria in paragraphs (d)(4)(i) through (d)(4)(iii) of this section. The owner or operator who elects to use these provisions shall submit a request for an extension of compliance in accordance with the requirements of paragraph (d)(2)(iv) of this section.(i) Compliance cannot be achieved without replacing the compressor;(ii) Compliance cannot be achieved without recasting the distance piece; or(5) Compliance with the surge control vessel and bottoms receiver provisions of § 63.170 shall occur no later than June 19, 2001.(6) Compliance with the heat exchange system provisions of § 63.104 shall occur no later than June 19, 2001.
Citations to §63.481(d)(2)(i)
-
(2) Compliance with the compressor provisions of § 63.164 shall occur no later than March 5, 1998, for any compressor meeting all the criteria in paragraphs (d)(2)(i) through (d)(2)(iv) of this section.(i) The compressor meets one or more of the criteria specified in paragraphs (d)(1)(i) through (d)(1)(iv) of this section;(ii) The work can be accomplished without a process unit shutdown as defined in § 63.161;(iii) The additional time is actually necessary, due to the unavailability of parts beyond the control of the owner or operator; and(iv) The owner or operator submits the request for a compliance extension to the appropriate U.S. Environmental Protection Agency (EPA) Regional Office at the address listed in § 63.13 no later than 45 days before the compliance date. The request for a compliance extension shall contain the information specified in § 63.6(i)(6)(i)(A), (B), and (D). Unless the EPA Regional Office objects to the request for a compliance extension within 30 days after receipt of the request, the request shall be deemed approved.
Citations to §63.481(d)(2)(ii)
-
(2) Compliance with the compressor provisions of § 63.164 shall occur no later than March 5, 1998, for any compressor meeting all the criteria in paragraphs (d)(2)(i) through (d)(2)(iv) of this section.(i) The compressor meets one or more of the criteria specified in paragraphs (d)(1)(i) through (d)(1)(iv) of this section;(ii) The work can be accomplished without a process unit shutdown as defined in § 63.161;(iii) The additional time is actually necessary, due to the unavailability of parts beyond the control of the owner or operator; and(iv) The owner or operator submits the request for a compliance extension to the appropriate U.S. Environmental Protection Agency (EPA) Regional Office at the address listed in § 63.13 no later than 45 days before the compliance date. The request for a compliance extension shall contain the information specified in § 63.6(i)(6)(i)(A), (B), and (D). Unless the EPA Regional Office objects to the request for a compliance extension within 30 days after receipt of the request, the request shall be deemed approved.
Citations to §63.481(d)(2)(iii)
-
(2) Compliance with the compressor provisions of § 63.164 shall occur no later than March 5, 1998, for any compressor meeting all the criteria in paragraphs (d)(2)(i) through (d)(2)(iv) of this section.(i) The compressor meets one or more of the criteria specified in paragraphs (d)(1)(i) through (d)(1)(iv) of this section;(ii) The work can be accomplished without a process unit shutdown as defined in § 63.161;(iii) The additional time is actually necessary, due to the unavailability of parts beyond the control of the owner or operator; and(iv) The owner or operator submits the request for a compliance extension to the appropriate U.S. Environmental Protection Agency (EPA) Regional Office at the address listed in § 63.13 no later than 45 days before the compliance date. The request for a compliance extension shall contain the information specified in § 63.6(i)(6)(i)(A), (B), and (D). Unless the EPA Regional Office objects to the request for a compliance extension within 30 days after receipt of the request, the request shall be deemed approved.
Citations to §63.481(d)(2)(iv)
-
(2) Compliance with the compressor provisions of § 63.164 shall occur no later than March 5, 1998, for any compressor meeting all the criteria in paragraphs (d)(2)(i) through (d)(2)(iv) of this section.(i) The compressor meets one or more of the criteria specified in paragraphs (d)(1)(i) through (d)(1)(iv) of this section;(ii) The work can be accomplished without a process unit shutdown as defined in § 63.161;(iii) The additional time is actually necessary, due to the unavailability of parts beyond the control of the owner or operator; and(iv) The owner or operator submits the request for a compliance extension to the appropriate U.S. Environmental Protection Agency (EPA) Regional Office at the address listed in § 63.13 no later than 45 days before the compliance date. The request for a compliance extension shall contain the information specified in § 63.6(i)(6)(i)(A), (B), and (D). Unless the EPA Regional Office objects to the request for a compliance extension within 30 days after receipt of the request, the request shall be deemed approved.
Citations to §63.481(d)(3)
-
(d) Except as provided for in paragraphs (d)(1) through (d)(6) of this section, and paragraphs (n) and (o) of this section, existing affected sources shall be in compliance with § 63.502 no later than July 31, 1997, unless an extension has been granted pursuant to paragraph (e) of this section.(1) Compliance with the compressor provisions of § 63.164 shall occur no later than September 5, 1997 for any compressor meeting one or more of the criteria in paragraphs (d)(1)(i) through (d)(1)(iv) of this section, if the work can be accomplished without a process unit shutdown, as defined in § 63.161.(i) The seal system will be replaced;(ii) A barrier fluid system will be installed;(iii) A new barrier fluid will be utilized which requires changes to the existing barrier fluid system; or(iv) The compressor will be modified to permit connecting the compressor to a fuel gas system or closed vent system, or be modified so that emissions from the compressor can be routed to a process.(2) Compliance with the compressor provisions of § 63.164 shall occur no later than March 5, 1998, for any compressor meeting all the criteria in paragraphs (d)(2)(i) through (d)(2)(iv) of this section.(i) The compressor meets one or more of the criteria specified in paragraphs (d)(1)(i) through (d)(1)(iv) of this section;(ii) The work can be accomplished without a process unit shutdown as defined in § 63.161;(iii) The additional time is actually necessary, due to the unavailability of parts beyond the control of the owner or operator; and(iv) The owner or operator submits the request for a compliance extension to the appropriate U.S. Environmental Protection Agency (EPA) Regional Office at the address listed in § 63.13 no later than 45 days before the compliance date. The request for a compliance extension shall contain the information specified in § 63.6(i)(6)(i)(A), (B), and (D). Unless the EPA Regional Office objects to the request for a compliance extension within 30 days after receipt of the request, the request shall be deemed approved.(3) If compliance with the compressor provisions of § 63.164 cannot reasonably be achieved without a process unit shutdown, the owner or operator shall achieve compliance no later than September 5, 1998. The owner or operator who elects to use this provision shall submit a request for an extension of compliance in accordance with the requirements of paragraph (d)(2)(iv) of this section.(4) Compliance with the compressor provisions of § 63.164 shall occur no later than September 5, 1999 for any compressor meeting one or more of the criteria in paragraphs (d)(4)(i) through (d)(4)(iii) of this section. The owner or operator who elects to use these provisions shall submit a request for an extension of compliance in accordance with the requirements of paragraph (d)(2)(iv) of this section.(i) Compliance cannot be achieved without replacing the compressor;(ii) Compliance cannot be achieved without recasting the distance piece; or(5) Compliance with the surge control vessel and bottoms receiver provisions of § 63.170 shall occur no later than June 19, 2001.(6) Compliance with the heat exchange system provisions of § 63.104 shall occur no later than June 19, 2001.
Citations to §63.481(d)(4)
-
(d) Except as provided for in paragraphs (d)(1) through (d)(6) of this section, and paragraphs (n) and (o) of this section, existing affected sources shall be in compliance with § 63.502 no later than July 31, 1997, unless an extension has been granted pursuant to paragraph (e) of this section.(1) Compliance with the compressor provisions of § 63.164 shall occur no later than September 5, 1997 for any compressor meeting one or more of the criteria in paragraphs (d)(1)(i) through (d)(1)(iv) of this section, if the work can be accomplished without a process unit shutdown, as defined in § 63.161.(i) The seal system will be replaced;(ii) A barrier fluid system will be installed;(iii) A new barrier fluid will be utilized which requires changes to the existing barrier fluid system; or(iv) The compressor will be modified to permit connecting the compressor to a fuel gas system or closed vent system, or be modified so that emissions from the compressor can be routed to a process.(2) Compliance with the compressor provisions of § 63.164 shall occur no later than March 5, 1998, for any compressor meeting all the criteria in paragraphs (d)(2)(i) through (d)(2)(iv) of this section.(i) The compressor meets one or more of the criteria specified in paragraphs (d)(1)(i) through (d)(1)(iv) of this section;(ii) The work can be accomplished without a process unit shutdown as defined in § 63.161;(iii) The additional time is actually necessary, due to the unavailability of parts beyond the control of the owner or operator; and(iv) The owner or operator submits the request for a compliance extension to the appropriate U.S. Environmental Protection Agency (EPA) Regional Office at the address listed in § 63.13 no later than 45 days before the compliance date. The request for a compliance extension shall contain the information specified in § 63.6(i)(6)(i)(A), (B), and (D). Unless the EPA Regional Office objects to the request for a compliance extension within 30 days after receipt of the request, the request shall be deemed approved.(3) If compliance with the compressor provisions of § 63.164 cannot reasonably be achieved without a process unit shutdown, the owner or operator shall achieve compliance no later than September 5, 1998. The owner or operator who elects to use this provision shall submit a request for an extension of compliance in accordance with the requirements of paragraph (d)(2)(iv) of this section.(4) Compliance with the compressor provisions of § 63.164 shall occur no later than September 5, 1999 for any compressor meeting one or more of the criteria in paragraphs (d)(4)(i) through (d)(4)(iii) of this section. The owner or operator who elects to use these provisions shall submit a request for an extension of compliance in accordance with the requirements of paragraph (d)(2)(iv) of this section.(i) Compliance cannot be achieved without replacing the compressor;(ii) Compliance cannot be achieved without recasting the distance piece; or(5) Compliance with the surge control vessel and bottoms receiver provisions of § 63.170 shall occur no later than June 19, 2001.(6) Compliance with the heat exchange system provisions of § 63.104 shall occur no later than June 19, 2001.
Citations to §63.481(d)(4)(i)
-
(4) Compliance with the compressor provisions of § 63.164 shall occur no later than September 5, 1999 for any compressor meeting one or more of the criteria in paragraphs (d)(4)(i) through (d)(4)(iii) of this section. The owner or operator who elects to use these provisions shall submit a request for an extension of compliance in accordance with the requirements of paragraph (d)(2)(iv) of this section.(i) Compliance cannot be achieved without replacing the compressor;(ii) Compliance cannot be achieved without recasting the distance piece; or
Citations to §63.481(d)(4)(ii)
-
(4) Compliance with the compressor provisions of § 63.164 shall occur no later than September 5, 1999 for any compressor meeting one or more of the criteria in paragraphs (d)(4)(i) through (d)(4)(iii) of this section. The owner or operator who elects to use these provisions shall submit a request for an extension of compliance in accordance with the requirements of paragraph (d)(2)(iv) of this section.(i) Compliance cannot be achieved without replacing the compressor;(ii) Compliance cannot be achieved without recasting the distance piece; or
Citations to §63.481(d)(4)(iii)
-
(4) Compliance with the compressor provisions of § 63.164 shall occur no later than September 5, 1999 for any compressor meeting one or more of the criteria in paragraphs (d)(4)(i) through (d)(4)(iii) of this section. The owner or operator who elects to use these provisions shall submit a request for an extension of compliance in accordance with the requirements of paragraph (d)(2)(iv) of this section.(i) Compliance cannot be achieved without replacing the compressor;(ii) Compliance cannot be achieved without recasting the distance piece; or
Citations to §63.481(d)(5)
-
(d) Except as provided for in paragraphs (d)(1) through (d)(6) of this section, and paragraphs (n) and (o) of this section, existing affected sources shall be in compliance with § 63.502 no later than July 31, 1997, unless an extension has been granted pursuant to paragraph (e) of this section.(1) Compliance with the compressor provisions of § 63.164 shall occur no later than September 5, 1997 for any compressor meeting one or more of the criteria in paragraphs (d)(1)(i) through (d)(1)(iv) of this section, if the work can be accomplished without a process unit shutdown, as defined in § 63.161.(i) The seal system will be replaced;(ii) A barrier fluid system will be installed;(iii) A new barrier fluid will be utilized which requires changes to the existing barrier fluid system; or(iv) The compressor will be modified to permit connecting the compressor to a fuel gas system or closed vent system, or be modified so that emissions from the compressor can be routed to a process.(2) Compliance with the compressor provisions of § 63.164 shall occur no later than March 5, 1998, for any compressor meeting all the criteria in paragraphs (d)(2)(i) through (d)(2)(iv) of this section.(i) The compressor meets one or more of the criteria specified in paragraphs (d)(1)(i) through (d)(1)(iv) of this section;(ii) The work can be accomplished without a process unit shutdown as defined in § 63.161;(iii) The additional time is actually necessary, due to the unavailability of parts beyond the control of the owner or operator; and(iv) The owner or operator submits the request for a compliance extension to the appropriate U.S. Environmental Protection Agency (EPA) Regional Office at the address listed in § 63.13 no later than 45 days before the compliance date. The request for a compliance extension shall contain the information specified in § 63.6(i)(6)(i)(A), (B), and (D). Unless the EPA Regional Office objects to the request for a compliance extension within 30 days after receipt of the request, the request shall be deemed approved.(3) If compliance with the compressor provisions of § 63.164 cannot reasonably be achieved without a process unit shutdown, the owner or operator shall achieve compliance no later than September 5, 1998. The owner or operator who elects to use this provision shall submit a request for an extension of compliance in accordance with the requirements of paragraph (d)(2)(iv) of this section.(4) Compliance with the compressor provisions of § 63.164 shall occur no later than September 5, 1999 for any compressor meeting one or more of the criteria in paragraphs (d)(4)(i) through (d)(4)(iii) of this section. The owner or operator who elects to use these provisions shall submit a request for an extension of compliance in accordance with the requirements of paragraph (d)(2)(iv) of this section.(i) Compliance cannot be achieved without replacing the compressor;(ii) Compliance cannot be achieved without recasting the distance piece; or(5) Compliance with the surge control vessel and bottoms receiver provisions of § 63.170 shall occur no later than June 19, 2001.(6) Compliance with the heat exchange system provisions of § 63.104 shall occur no later than June 19, 2001.
Citations to §63.481(d)(6)
-
(d) Except as provided for in paragraphs (d)(1) through (d)(6) of this section, and paragraphs (n) and (o) of this section, existing affected sources shall be in compliance with § 63.502 no later than July 31, 1997, unless an extension has been granted pursuant to paragraph (e) of this section.(1) Compliance with the compressor provisions of § 63.164 shall occur no later than September 5, 1997 for any compressor meeting one or more of the criteria in paragraphs (d)(1)(i) through (d)(1)(iv) of this section, if the work can be accomplished without a process unit shutdown, as defined in § 63.161.(i) The seal system will be replaced;(ii) A barrier fluid system will be installed;(iii) A new barrier fluid will be utilized which requires changes to the existing barrier fluid system; or(iv) The compressor will be modified to permit connecting the compressor to a fuel gas system or closed vent system, or be modified so that emissions from the compressor can be routed to a process.(2) Compliance with the compressor provisions of § 63.164 shall occur no later than March 5, 1998, for any compressor meeting all the criteria in paragraphs (d)(2)(i) through (d)(2)(iv) of this section.(i) The compressor meets one or more of the criteria specified in paragraphs (d)(1)(i) through (d)(1)(iv) of this section;(ii) The work can be accomplished without a process unit shutdown as defined in § 63.161;(iii) The additional time is actually necessary, due to the unavailability of parts beyond the control of the owner or operator; and(iv) The owner or operator submits the request for a compliance extension to the appropriate U.S. Environmental Protection Agency (EPA) Regional Office at the address listed in § 63.13 no later than 45 days before the compliance date. The request for a compliance extension shall contain the information specified in § 63.6(i)(6)(i)(A), (B), and (D). Unless the EPA Regional Office objects to the request for a compliance extension within 30 days after receipt of the request, the request shall be deemed approved.(3) If compliance with the compressor provisions of § 63.164 cannot reasonably be achieved without a process unit shutdown, the owner or operator shall achieve compliance no later than September 5, 1998. The owner or operator who elects to use this provision shall submit a request for an extension of compliance in accordance with the requirements of paragraph (d)(2)(iv) of this section.(4) Compliance with the compressor provisions of § 63.164 shall occur no later than September 5, 1999 for any compressor meeting one or more of the criteria in paragraphs (d)(4)(i) through (d)(4)(iii) of this section. The owner or operator who elects to use these provisions shall submit a request for an extension of compliance in accordance with the requirements of paragraph (d)(2)(iv) of this section.(i) Compliance cannot be achieved without replacing the compressor;(ii) Compliance cannot be achieved without recasting the distance piece; or(5) Compliance with the surge control vessel and bottoms receiver provisions of § 63.170 shall occur no later than June 19, 2001.(6) Compliance with the heat exchange system provisions of § 63.104 shall occur no later than June 19, 2001.
-
(6) The compliance date for heat exchange systems subject to the provisions of this section is specified in § 63.481(d)(6).
Citations to §63.481(e)
-
(c) The compliance date for the equipment leak provisions in this section is provided in § 63.481(d). Whenever subpart H of this part refers to the compliance dates specified in any paragraph contained in § 63.100, the compliance dates listed in § 63.481(d) shall instead apply, for the purposes of this subpart. When § 63.182(c)(4) refers to “sources subject to subpart F,” the phrase “sources subject to this subpart” shall apply, for the purposes of this subpart. In addition, extensions of compliance dates are addressed by § 63.481(e) instead of by § 63.182(a)(6), for the purposes of this subpart.
-
(ii) A request for an extension for compliance, as specified in § 63.481(e), may be submitted in the Precompliance Report. The request for a compliance extension shall include the data outlined in § 63.6(i)(6)(i)(A), (B), and (D), as required in § 63.481(e)(1).
Citations to §63.481(e)(1)
-
(ii) A request for an extension for compliance, as specified in § 63.481(e), may be submitted in the Precompliance Report. The request for a compliance extension shall include the data outlined in § 63.6(i)(6)(i)(A), (B), and (D), as required in § 63.481(e)(1).
Citations to §63.481(f)
-
(a) Affected sources are required to achieve compliance on or before the dates specified in paragraphs (b) through (d) of this section and paragraphs (n) and (o) of this section. Paragraph (e) of this section provides information on requesting compliance extensions. Paragraphs (f) through (l) of this section discuss the relationship of this subpart to subpart A and to other applicable rules. Where an override of another authority of the Act is indicated in this subpart, only compliance with the provisions of this subpart is required. Paragraph (m) of this section specifies the meaning of time periods.
Citations to §63.481(g)
-
(a) Affected sources are required to achieve compliance on or before the dates specified in paragraphs (b) through (d) of this section and paragraphs (n) and (o) of this section. Paragraph (e) of this section provides information on requesting compliance extensions. Paragraphs (f) through (l) of this section discuss the relationship of this subpart to subpart A and to other applicable rules. Where an override of another authority of the Act is indicated in this subpart, only compliance with the provisions of this subpart is required. Paragraph (m) of this section specifies the meaning of time periods.
Citations to §63.481(h)
-
(a) Affected sources are required to achieve compliance on or before the dates specified in paragraphs (b) through (d) of this section and paragraphs (n) and (o) of this section. Paragraph (e) of this section provides information on requesting compliance extensions. Paragraphs (f) through (l) of this section discuss the relationship of this subpart to subpart A and to other applicable rules. Where an override of another authority of the Act is indicated in this subpart, only compliance with the provisions of this subpart is required. Paragraph (m) of this section specifies the meaning of time periods.
Citations to §63.481(j)
-
(a) Affected sources are required to achieve compliance on or before the dates specified in paragraphs (b) through (d) of this section and paragraphs (n) and (o) of this section. Paragraph (e) of this section provides information on requesting compliance extensions. Paragraphs (f) through (l) of this section discuss the relationship of this subpart to subpart A and to other applicable rules. Where an override of another authority of the Act is indicated in this subpart, only compliance with the provisions of this subpart is required. Paragraph (m) of this section specifies the meaning of time periods.
Citations to §63.481(k)
-
(a) Affected sources are required to achieve compliance on or before the dates specified in paragraphs (b) through (d) of this section and paragraphs (n) and (o) of this section. Paragraph (e) of this section provides information on requesting compliance extensions. Paragraphs (f) through (l) of this section discuss the relationship of this subpart to subpart A and to other applicable rules. Where an override of another authority of the Act is indicated in this subpart, only compliance with the provisions of this subpart is required. Paragraph (m) of this section specifies the meaning of time periods.
-
(x) If any emission point is subject to this subpart and to other standards as specified in § 63.481(k), and if the provisions of § 63.481(k) allow the owner or operator to choose which testing, monitoring, reporting, and recordkeeping provisions will be followed, then the Notification of Compliance Status shall indicate which rule's requirements will be followed for testing, monitoring, reporting, and recordkeeping.
Citations to §63.481(k)(2)
-
(a) For any flare that is used to reduce organic HAP emissions from an EPPU, the owner or operator may elect to comply with the requirements in this section in lieu of the requirements of § 63.11(b) and the requirements referenced therein. The owner or operator may also elect to comply with the requirements in this section pursuant to the overlap provisions provided in § 63.481(k)(2). However, beginning no later than the compliance dates specified in § 63.481(n), the provisions specified in paragraphs (a)(1) through (32) of this section no longer apply. Instead, if an owner or operator reduces organic HAP emissions from an EPPU by venting emissions through a closed-vent system to a steam-assisted, air-assisted, or non-assisted flare, then the owner or operator must meet the applicable requirements for flares as specified in §§ 63.670 and 63.671, including the provisions in tables 12 and 13 to subpart CC of this part, except as specified in paragraph (b) of this section. This requirement also applies to any flare using fuel gas from a fuel gas system, of which 50 percent or more of the fuel gas is derived from a EPPU, as determined on an annual average basis. For purposes of compliance with this paragraph, the following terms are defined in § 63.641 of subpart CC of this part: Assist air, assist steam, center steam, combustion zone, combustion zone gas, flare, flare purge gas, flare supplemental gas, flare sweep gas, flare vent gas, lower steam, net heating value, perimeter assist air, pilot gas, premix assist air, total steam, and upper steam.(1) §§ 63.487(a)(1)(i) and (b)(1)(i);(2) § 63.489(b)(2);(3) § 63.490(a)(1);(5) § 63.494(d);(6) § 63.496(b)(7)(i)(A);(7) § 63.497(a)(2);(9) § 63.502(k)(1);(11) § 63.107(h)(9)(i) related to criteria in § 63.11(b);(12) § 63.113(a)(1);(13) § 63.114(a)(2);(16) § 63.118(f)(5);(17) The last sentence in § 63.119(e)(1);(19) §§ 63.122(c)(2) and (g)(3);(20) § 63.126(b)(2)(i);(21) § 63.127(a)(2);(24) §§ 63.130(a)(2)(i), (c), and (d)(5);(25) §§ 63.139(c)(3) and (d)(3);(28) § 63.147(d)(1);(29) §§ 63.172(d);(31) § 63.181(g)(1)(iii); and(32) The phrase “including periods when a flare pilot light system does not have a flame” in § 63.181(g)(2)(i).
Citations to §63.481(l)
-
(a) Affected sources are required to achieve compliance on or before the dates specified in paragraphs (b) through (d) of this section and paragraphs (n) and (o) of this section. Paragraph (e) of this section provides information on requesting compliance extensions. Paragraphs (f) through (l) of this section discuss the relationship of this subpart to subpart A and to other applicable rules. Where an override of another authority of the Act is indicated in this subpart, only compliance with the provisions of this subpart is required. Paragraph (m) of this section specifies the meaning of time periods.
Citations to §63.481(n)
-
(e) For each affected source as described in § 63.480, beginning no later than the compliance dates specified in § 63.481(n), owners and operators of sources as defined in § 63.480 shall comply with the requirements of this subpart at all times, except during periods of nonoperation of the source (or specific portion thereof) resulting in cessation of the emissions to which this subpart applies.
-
(2) Substitute “beginning no later than the compliance dates specified in § 63.481(n)” for each occurrence of the phrase “beginning no later than the compliance dates specified in § 63.100(k)(10)”.
-
(5) For each affected source as described in § 63.480, beginning no later than the compliance dates specified in § 63.481(n), the last sentence in paragraph (p)(3) of this section: “This exit concentration of total organic HAP or TOC shall then be used to perform the calculations outlined in § 63.115(d)(2)(iii) and § 63.115(d)(2)(iv), for the combined vent stream exiting the final recovery device.” no longer applies.
-
(iii) For each affected source as described in § 63.480, beginning no later than the compliance dates specified in § 63.481(n), paragraph (a)(1)(i) of this section no longer applies and instead the owner or operator of the affected sources must comply with § 63.508 for the flare.
-
(2) For each affected source as described in § 63.480, beginning no later than the compliance dates specified in § 63.481(n), paragraph (d)(1) of this section no longer applies and instead the collection of all batch front-end process vents with combined total annual emissions of TOC or organic HAP less than 4,536 kg/yr (10,000 lb/yr) are considered Group 2 batch front-end process vents. Annual emissions of TOC or organic HAP are determined at the exit of each batch unit operation, as described in paragraph (a)(2) of this section, and are determined as specified in paragraph (b) of this section.
-
(10) Beginning no later than the compliance dates specified in § 63.481(n), if the owner or operator vents emissions through a closed vent system to an adsorber(s) that cannot be regenerated or a regenerative adsorber(s) that is regenerated offsite, then the owner or operator must install a system of two or more adsorber units in series and comply with the requirements specified in paragraphs (b)(10)(i) through (b)(10)(iii) of this section.(i) Conduct an initial performance test or design evaluation of the adsorber and establish the breakthrough limit and adsorber bed life.(ii) Monitor the HAP or total organic compound (TOC) concentration through a sample port at the outlet of the first adsorber bed in series according to the schedule in paragraph (b)(10)(iii)(B) of this section. The owner or operator must measure the concentration of HAP or TOC using either a portable analyzer, in accordance with Method 21 of 40 CFR part 60, appendix A-7 using methane, propane, isobutylene, or the primary HAP being controlled as the calibration gas or Method 25A of 40 CFR part 60, appendix A-7 using methane, propane, or the primary HAP being controlled as the calibration gas.(iii) Comply with paragraph (b)(10)(iii)(A) of this section, and comply with the monitoring frequency according to paragraph (b)(10)(iii)(B) of this section.(A) The first adsorber in series must be replaced immediately when breakthrough, as defined in § 63.482, is detected between the first and second adsorber. The original second adsorber (or a fresh canister) will become the new first adsorber and a fresh adsorber will become the second adsorber. For purposes of this paragraph, “immediately” means within 8 hours of the detection of a breakthrough for adsorbers of 55 gallons or less, and within 24 hours of the detection of a breakthrough for adsorbers greater than 55 gallons. The owner or operator must monitor at the outlet of the first adsorber within 3 days of replacement to confirm it is performing properly.(B) Based on the adsorber bed life established according to paragraph (b)(10)(i) of this section and the date the adsorbent was last replaced, conduct monitoring to detect breakthrough at least monthly if the adsorbent has more than 2 months of life remaining, at least weekly if the adsorbent has between 2 months and 2 weeks of life remaining, and at least daily if the adsorbent has 2 weeks or less of life remaining.
-
(2) For each affected source as described in § 63.480, beginning no later than the compliance dates specified in § 63.481(n), paragraph (a)(1) of this section no longer applies and instead the owner or operator of the affected source must comply with § 63.508 for the flare.
-
(iv) For each affected source as described in § 63.480, beginning no later than the compliance dates specified in § 63.481(n), paragraphs (b)(3)(i) through (b)(3)(iii) of this section no longer apply and instead the owner or operator of the affected source must keep the records specified in § 63.108(m) of subpart F of this part and § 63.508, readily accessible when using a flare to comply with § 63.487(a)(1).
-
(e) For each affected source as described in § 63.480, beginning no later than the compliance dates specified in § 63.481(n), paragraph (d) of this section no longer applies and instead if the owner or operator complies with the residual organic HAP limitations in paragraph (a)(1) through (3) of this section using a flare, the owner or operator of the affected source must comply with § 63.508 for the flare.
-
(B) For each affected source as described in § 63.480, beginning no later than the compliance dates specified in § 63.481(n), paragraph (b)(7)(i)(A) of this section no longer applies and instead the owner or operator of the affected source must comply with § 63.508 for the flare.
-
(7) For each affected source as described in § 63.480, beginning no later than the compliance dates specified in § 63.481(n), paragraph (a)(2) of this section no longer applies and instead the owner or operator of the affected source must comply with § 63.508 for the flare.
-
(F) For each affected source as described in § 63.480, beginning no later than the compliance dates specified in § 63.481(n), paragraph (d)(5)(ii)(E) of this section no longer applies and instead the owner or operator of the affected source must keep the records specified in § 63.108(m) of subpart F of this part and § 63.508.
-
(e) Substitute “For each affected source as described in § 63.480, beginning no later than the compliance dates specified in § 63.481(n),” for each occurrence of “For each source as defined in § 63.101, beginning no later than the compliance dates specified in § 63.100(k)(10),”.
-
(2) Substitute “For each affected source as described in § 63.480, beginning no later than the compliance dates specified in § 63.481(n),” for each occurrence of “For each source as defined in § 63.101, and for each source as defined in § 63.191, beginning no later than the compliance dates specified in § 63.100(k)(10),”.
-
(B) If the continuous front-end process vent is controlled using a control device or a pollution prevention measure achieving less than 98-percent reduction, ECFEPViACTUAL is calculated using Equation 35.(1) The percent reduction shall be measured according to the procedures in § 63.116 if a combustion control device is used. For a flare meeting the criteria in § 63.116(a), or a boiler or process heater meeting the criteria in § 63.116(b), the percent reduction shall be 98 percent. If a noncombustion control device is used, percent reduction shall be demonstrated by a performance test at the inlet and outlet of the device, or, if testing is not feasible, by a control design evaluation and documented engineering calculations.(2) For determining debits from Group 1 continuous front-end process vents, product recovery devices shall not be considered control devices and shall not be assigned a percent reduction in calculating ECFEPViACTUAL. The sampling site for measurement of uncontrolled emissions shall be after the final uncontrolled recovery device. However, as provided in § 63.113(a)(3), a Group 1 continuous front-end process vent may add sufficient product recovery to raise the TRE index value above 1.0, thereby becoming a Group 2 continuous front-end process vent. Such a continuous front-end process vent is not a Group 1 continuous front-end process vent and should, therefore, not be included in determining debits under this paragraph, except as specified in paragraph (g)(2)(iii)(B)(4) of this section.(3) Procedures for calculating the percent reduction of pollution prevention measures are specified in paragraph (j) of this section.(4) For each affected source as described in § 63.480, beginning no later than the compliance dates specified in § 63.481(n), that last two sentences of paragraph (g)(2)(iii)(B)(2) of this section no longer apply.
-
(a) Performance testing shall be conducted in accordance with § 63.7(a)(1), (a)(3), (d), (e)(1) and (2), (e)(4), (g), and (h), with the exceptions specified in paragraphs (a)(1) through (5) of this section and the additions specified in paragraph (b) of this section. Sections 63.484 through 63.501 also contain specific testing requirements. Beginning no later than the compliance dates specified in § 63.481(n), conduct subsequent performance tests no later than 60 calendar months after the previous performance test.(1) Except as specified in paragraph (a)(1)(iii) of this section, performance tests shall be conducted at maximum representative operating conditions achievable during one of the time periods described in paragraph (a)(1)(i) of this section, without causing any of the situations described in paragraph (a)(1)(ii) of this section to occur. Upon request, the owner or operator shall make available to the Administrator such records as may be necessary to determine the conditions of performance tests.(i) The 6-month period that ends 2 months before the Notification of Compliance Status is due, according to § 63.506(e)(5); or the 6-month period that begins 3 months before the performance test and ends 3 months after the performance test.(ii) Causing damage to equipment; necessitating that the owner or operator make product that does not meet an existing specification for sale to a customer; or necessitating that the owner or operator make product in excess of demand.(iii) Beginning no later than the compliance dates specified in § 63.481(n), paragraphs (a)(1)(i) and (ii) of this section no longer applies and instead the owner or operator must conduct performance tests under such conditions as the Administrator specifies based on representative performance of the affected source for the period being tested. Representative conditions exclude periods of startup and shutdown. You may not conduct performance tests during periods of malfunction. You must record the process information that is necessary to document operating conditions during the test and include in such record an explanation to support that such conditions represent normal operation. Upon request, you must make available to the Administrator such records as may be necessary to determine the conditions of performance tests.(2) References in § 63.7(g) to the Notification of Compliance Status requirements in § 63.9(h) shall refer to the requirements in § 63.506(e)(5).(3) Because the site-specific test plans in § 63.7(c)(3) are not required, § 63.7(h)(4)(ii) is not applicable.(4) The owner or operator shall notify the Administrator of the intent to conduct a performance test at least 30 days before the performance test is scheduled, to allow the Administrator the opportunity to have an observer present during the test. If after 30 days notice for an initially scheduled performance test, there is a delay (due to operational problems, etc.) in conducting the scheduled performance test, the owner or operator of an affected facility shall notify the Administrator as soon as possible of any delay in the original test date, either by providing at least 7 days prior notice of the rescheduled date of the performance test, or by arranging a rescheduled date with the Administrator by mutual agreement.(5) Performance tests shall be performed no later than 150 days after the compliance dates specified in this subpart (i.e., in time for the results to be included in the Notification of Compliance Status), rather than according to the time periods in § 63.7(a)(2).
-
(F) The required information shall include documentation of the data listed in paragraphs (e)(4)(ii)(F)(1) through (e)(4)(ii)(F)(5) of this section for each storage vessel and continuous front-end process vent included in the average.(1) The required documentation shall include the values of the parameters used to determine whether the emission point is Group 1 or Group 2. Except as specified in paragraph (e)(4)(ii)(F)(6) of this section, where a TRE index value is used for continuous front-end process vent group determination, the estimated or measured values of the parameters used in the TRE equation in § 63.115(d) and the resulting TRE index value shall be submitted.(2) The required documentation shall include the estimated values of all parameters needed for input to the emission debit and credit calculations in § 63.503(g) and (h). These parameter values shall be specified in the affected source's Emissions Averaging Plan (or operating permit) as enforceable operating conditions. Changes to these parameters shall be reported in an update to the Emissions Averaging Plan, as required by paragraph (e)(4)(iv)(B)(2) of this section.(3) The required documentation shall include the estimated percent reduction if a control technology achieving a lower percent reduction than the efficiency of the applicable reference control technology or standard is or will be applied to the emission point.(4) The required documentation shall include the anticipated nominal efficiency if a control technology achieving a greater percent emission reduction than the efficiency of the reference control technology is or will be applied to the emission point. The procedures in § 63.503(i) shall be followed to apply for a nominal efficiency, and the report specified in paragraph (e)(7)(ii) of this section shall be submitted with the Emissions Averaging Plan as specified in paragraph (e)(7)(ii)(A) of this section.(5) The required documentation shall include the monitoring plan specified in § 63.122(b), to include the information specified in § 63.120(d)(2)(i) and in either § 63.120(d)(2)(ii) or (d)(2)(iii) for each storage vessel controlled with a closed-vent system using a control device other than a flare.(6) For each affected source as described in § 63.480, beginning no later than the compliance dates specified in § 63.481(n), that last sentence of paragraph (e)(4)(ii)(F)(1) of this section no longer applies.
-
(a) For any flare that is used to reduce organic HAP emissions from an EPPU, the owner or operator may elect to comply with the requirements in this section in lieu of the requirements of § 63.11(b) and the requirements referenced therein. The owner or operator may also elect to comply with the requirements in this section pursuant to the overlap provisions provided in § 63.481(k)(2). However, beginning no later than the compliance dates specified in § 63.481(n), the provisions specified in paragraphs (a)(1) through (32) of this section no longer apply. Instead, if an owner or operator reduces organic HAP emissions from an EPPU by venting emissions through a closed-vent system to a steam-assisted, air-assisted, or non-assisted flare, then the owner or operator must meet the applicable requirements for flares as specified in §§ 63.670 and 63.671, including the provisions in tables 12 and 13 to subpart CC of this part, except as specified in paragraph (b) of this section. This requirement also applies to any flare using fuel gas from a fuel gas system, of which 50 percent or more of the fuel gas is derived from a EPPU, as determined on an annual average basis. For purposes of compliance with this paragraph, the following terms are defined in § 63.641 of subpart CC of this part: Assist air, assist steam, center steam, combustion zone, combustion zone gas, flare, flare purge gas, flare supplemental gas, flare sweep gas, flare vent gas, lower steam, net heating value, perimeter assist air, pilot gas, premix assist air, total steam, and upper steam.(1) §§ 63.487(a)(1)(i) and (b)(1)(i);(2) § 63.489(b)(2);(3) § 63.490(a)(1);(5) § 63.494(d);(6) § 63.496(b)(7)(i)(A);(7) § 63.497(a)(2);(9) § 63.502(k)(1);(11) § 63.107(h)(9)(i) related to criteria in § 63.11(b);(12) § 63.113(a)(1);(13) § 63.114(a)(2);(16) § 63.118(f)(5);(17) The last sentence in § 63.119(e)(1);(19) §§ 63.122(c)(2) and (g)(3);(20) § 63.126(b)(2)(i);(21) § 63.127(a)(2);(24) §§ 63.130(a)(2)(i), (c), and (d)(5);(25) §§ 63.139(c)(3) and (d)(3);(28) § 63.147(d)(1);(29) §§ 63.172(d);(31) § 63.181(g)(1)(iii); and(32) The phrase “including periods when a flare pilot light system does not have a flame” in § 63.181(g)(2)(i).
Citations to §63.481(n)(1)
-
(n) All affected sources that commenced construction or reconstruction on or before April 25, 2023, must be in compliance with the requirements listed in paragraphs (n)(1) through (9) of this section upon initial startup or on July 15, 2027, whichever is later. All affected sources that commenced construction or reconstruction after April 25, 2023, must be in compliance with the requirements listed in paragraphs (n)(1) through (9) of this section upon initial startup, or on July 15, 2024, whichever is later.(1) The general requirements specified in § 63.483(e), § 63.504(a), § 63.504(a)(1)(iii), and § 63.506(e)(6)(iii)(C).(2) For flares, the requirements specified in § 63.508.(3) For storage vessels, the requirements specified in § 63.484(t) and § 63.506(e)(4)(ii)(F)(6).(4) For continuous front-end process vents, the requirements specified in §§ 63.485(l)(6), (o)(6), (p)(5), (q)(1)(vii), (x), § 63.503(g)(2)(iii)(B)(4), and § 63.506(e)(4)(ii)(F)(6).(5) For batch front-end process vents, the requirements specified in §§ 63.487(a)(3), (b)(3), and (e)(1)(iv) and (i), §§ 63.488(d)(2), (e)(4), (f)(2), and (g)(3), §§ 63.489(b)(10) and (d)(3), §§ 63.491(d)(1)(iii), (e)(6), and (h), § 63.492(g), and Table 6 to this subpart, item 3 in column 3 for diversion to the atmosphere and monthly inspections of sealed valves for all control devices.(6) For back-end processes, the requirements specified in §§ 63.497(a)(8) and (d)(3), and § 63.498(d)(5)(v).(8) For equipment leaks, the requirements specified in §§ 63.502(a)(2) and (k)(2).(9) For heat exchange systems, the requirements specified in §§ 63.502(n)(7) and (n)(8).
Citations to §63.481(n)(2)
-
(n) All affected sources that commenced construction or reconstruction on or before April 25, 2023, must be in compliance with the requirements listed in paragraphs (n)(1) through (9) of this section upon initial startup or on July 15, 2027, whichever is later. All affected sources that commenced construction or reconstruction after April 25, 2023, must be in compliance with the requirements listed in paragraphs (n)(1) through (9) of this section upon initial startup, or on July 15, 2024, whichever is later.(1) The general requirements specified in § 63.483(e), § 63.504(a), § 63.504(a)(1)(iii), and § 63.506(e)(6)(iii)(C).(2) For flares, the requirements specified in § 63.508.(3) For storage vessels, the requirements specified in § 63.484(t) and § 63.506(e)(4)(ii)(F)(6).(4) For continuous front-end process vents, the requirements specified in §§ 63.485(l)(6), (o)(6), (p)(5), (q)(1)(vii), (x), § 63.503(g)(2)(iii)(B)(4), and § 63.506(e)(4)(ii)(F)(6).(5) For batch front-end process vents, the requirements specified in §§ 63.487(a)(3), (b)(3), and (e)(1)(iv) and (i), §§ 63.488(d)(2), (e)(4), (f)(2), and (g)(3), §§ 63.489(b)(10) and (d)(3), §§ 63.491(d)(1)(iii), (e)(6), and (h), § 63.492(g), and Table 6 to this subpart, item 3 in column 3 for diversion to the atmosphere and monthly inspections of sealed valves for all control devices.(6) For back-end processes, the requirements specified in §§ 63.497(a)(8) and (d)(3), and § 63.498(d)(5)(v).(8) For equipment leaks, the requirements specified in §§ 63.502(a)(2) and (k)(2).(9) For heat exchange systems, the requirements specified in §§ 63.502(n)(7) and (n)(8).
Citations to §63.481(n)(3)
-
(n) All affected sources that commenced construction or reconstruction on or before April 25, 2023, must be in compliance with the requirements listed in paragraphs (n)(1) through (9) of this section upon initial startup or on July 15, 2027, whichever is later. All affected sources that commenced construction or reconstruction after April 25, 2023, must be in compliance with the requirements listed in paragraphs (n)(1) through (9) of this section upon initial startup, or on July 15, 2024, whichever is later.(1) The general requirements specified in § 63.483(e), § 63.504(a), § 63.504(a)(1)(iii), and § 63.506(e)(6)(iii)(C).(2) For flares, the requirements specified in § 63.508.(3) For storage vessels, the requirements specified in § 63.484(t) and § 63.506(e)(4)(ii)(F)(6).(4) For continuous front-end process vents, the requirements specified in §§ 63.485(l)(6), (o)(6), (p)(5), (q)(1)(vii), (x), § 63.503(g)(2)(iii)(B)(4), and § 63.506(e)(4)(ii)(F)(6).(5) For batch front-end process vents, the requirements specified in §§ 63.487(a)(3), (b)(3), and (e)(1)(iv) and (i), §§ 63.488(d)(2), (e)(4), (f)(2), and (g)(3), §§ 63.489(b)(10) and (d)(3), §§ 63.491(d)(1)(iii), (e)(6), and (h), § 63.492(g), and Table 6 to this subpart, item 3 in column 3 for diversion to the atmosphere and monthly inspections of sealed valves for all control devices.(6) For back-end processes, the requirements specified in §§ 63.497(a)(8) and (d)(3), and § 63.498(d)(5)(v).(8) For equipment leaks, the requirements specified in §§ 63.502(a)(2) and (k)(2).(9) For heat exchange systems, the requirements specified in §§ 63.502(n)(7) and (n)(8).
Citations to §63.481(n)(4)
-
(n) All affected sources that commenced construction or reconstruction on or before April 25, 2023, must be in compliance with the requirements listed in paragraphs (n)(1) through (9) of this section upon initial startup or on July 15, 2027, whichever is later. All affected sources that commenced construction or reconstruction after April 25, 2023, must be in compliance with the requirements listed in paragraphs (n)(1) through (9) of this section upon initial startup, or on July 15, 2024, whichever is later.(1) The general requirements specified in § 63.483(e), § 63.504(a), § 63.504(a)(1)(iii), and § 63.506(e)(6)(iii)(C).(2) For flares, the requirements specified in § 63.508.(3) For storage vessels, the requirements specified in § 63.484(t) and § 63.506(e)(4)(ii)(F)(6).(4) For continuous front-end process vents, the requirements specified in §§ 63.485(l)(6), (o)(6), (p)(5), (q)(1)(vii), (x), § 63.503(g)(2)(iii)(B)(4), and § 63.506(e)(4)(ii)(F)(6).(5) For batch front-end process vents, the requirements specified in §§ 63.487(a)(3), (b)(3), and (e)(1)(iv) and (i), §§ 63.488(d)(2), (e)(4), (f)(2), and (g)(3), §§ 63.489(b)(10) and (d)(3), §§ 63.491(d)(1)(iii), (e)(6), and (h), § 63.492(g), and Table 6 to this subpart, item 3 in column 3 for diversion to the atmosphere and monthly inspections of sealed valves for all control devices.(6) For back-end processes, the requirements specified in §§ 63.497(a)(8) and (d)(3), and § 63.498(d)(5)(v).(8) For equipment leaks, the requirements specified in §§ 63.502(a)(2) and (k)(2).(9) For heat exchange systems, the requirements specified in §§ 63.502(n)(7) and (n)(8).
Citations to §63.481(n)(5)
-
(n) All affected sources that commenced construction or reconstruction on or before April 25, 2023, must be in compliance with the requirements listed in paragraphs (n)(1) through (9) of this section upon initial startup or on July 15, 2027, whichever is later. All affected sources that commenced construction or reconstruction after April 25, 2023, must be in compliance with the requirements listed in paragraphs (n)(1) through (9) of this section upon initial startup, or on July 15, 2024, whichever is later.(1) The general requirements specified in § 63.483(e), § 63.504(a), § 63.504(a)(1)(iii), and § 63.506(e)(6)(iii)(C).(2) For flares, the requirements specified in § 63.508.(3) For storage vessels, the requirements specified in § 63.484(t) and § 63.506(e)(4)(ii)(F)(6).(4) For continuous front-end process vents, the requirements specified in §§ 63.485(l)(6), (o)(6), (p)(5), (q)(1)(vii), (x), § 63.503(g)(2)(iii)(B)(4), and § 63.506(e)(4)(ii)(F)(6).(5) For batch front-end process vents, the requirements specified in §§ 63.487(a)(3), (b)(3), and (e)(1)(iv) and (i), §§ 63.488(d)(2), (e)(4), (f)(2), and (g)(3), §§ 63.489(b)(10) and (d)(3), §§ 63.491(d)(1)(iii), (e)(6), and (h), § 63.492(g), and Table 6 to this subpart, item 3 in column 3 for diversion to the atmosphere and monthly inspections of sealed valves for all control devices.(6) For back-end processes, the requirements specified in §§ 63.497(a)(8) and (d)(3), and § 63.498(d)(5)(v).(8) For equipment leaks, the requirements specified in §§ 63.502(a)(2) and (k)(2).(9) For heat exchange systems, the requirements specified in §§ 63.502(n)(7) and (n)(8).
Citations to §63.481(n)(6)
-
(n) All affected sources that commenced construction or reconstruction on or before April 25, 2023, must be in compliance with the requirements listed in paragraphs (n)(1) through (9) of this section upon initial startup or on July 15, 2027, whichever is later. All affected sources that commenced construction or reconstruction after April 25, 2023, must be in compliance with the requirements listed in paragraphs (n)(1) through (9) of this section upon initial startup, or on July 15, 2024, whichever is later.(1) The general requirements specified in § 63.483(e), § 63.504(a), § 63.504(a)(1)(iii), and § 63.506(e)(6)(iii)(C).(2) For flares, the requirements specified in § 63.508.(3) For storage vessels, the requirements specified in § 63.484(t) and § 63.506(e)(4)(ii)(F)(6).(4) For continuous front-end process vents, the requirements specified in §§ 63.485(l)(6), (o)(6), (p)(5), (q)(1)(vii), (x), § 63.503(g)(2)(iii)(B)(4), and § 63.506(e)(4)(ii)(F)(6).(5) For batch front-end process vents, the requirements specified in §§ 63.487(a)(3), (b)(3), and (e)(1)(iv) and (i), §§ 63.488(d)(2), (e)(4), (f)(2), and (g)(3), §§ 63.489(b)(10) and (d)(3), §§ 63.491(d)(1)(iii), (e)(6), and (h), § 63.492(g), and Table 6 to this subpart, item 3 in column 3 for diversion to the atmosphere and monthly inspections of sealed valves for all control devices.(6) For back-end processes, the requirements specified in §§ 63.497(a)(8) and (d)(3), and § 63.498(d)(5)(v).(8) For equipment leaks, the requirements specified in §§ 63.502(a)(2) and (k)(2).(9) For heat exchange systems, the requirements specified in §§ 63.502(n)(7) and (n)(8).
Citations to §63.481(n)(7)
-
(n) All affected sources that commenced construction or reconstruction on or before April 25, 2023, must be in compliance with the requirements listed in paragraphs (n)(1) through (9) of this section upon initial startup or on July 15, 2027, whichever is later. All affected sources that commenced construction or reconstruction after April 25, 2023, must be in compliance with the requirements listed in paragraphs (n)(1) through (9) of this section upon initial startup, or on July 15, 2024, whichever is later.(1) The general requirements specified in § 63.483(e), § 63.504(a), § 63.504(a)(1)(iii), and § 63.506(e)(6)(iii)(C).(2) For flares, the requirements specified in § 63.508.(3) For storage vessels, the requirements specified in § 63.484(t) and § 63.506(e)(4)(ii)(F)(6).(4) For continuous front-end process vents, the requirements specified in §§ 63.485(l)(6), (o)(6), (p)(5), (q)(1)(vii), (x), § 63.503(g)(2)(iii)(B)(4), and § 63.506(e)(4)(ii)(F)(6).(5) For batch front-end process vents, the requirements specified in §§ 63.487(a)(3), (b)(3), and (e)(1)(iv) and (i), §§ 63.488(d)(2), (e)(4), (f)(2), and (g)(3), §§ 63.489(b)(10) and (d)(3), §§ 63.491(d)(1)(iii), (e)(6), and (h), § 63.492(g), and Table 6 to this subpart, item 3 in column 3 for diversion to the atmosphere and monthly inspections of sealed valves for all control devices.(6) For back-end processes, the requirements specified in §§ 63.497(a)(8) and (d)(3), and § 63.498(d)(5)(v).(8) For equipment leaks, the requirements specified in §§ 63.502(a)(2) and (k)(2).(9) For heat exchange systems, the requirements specified in §§ 63.502(n)(7) and (n)(8).
Citations to §63.481(n)(8)
-
(n) All affected sources that commenced construction or reconstruction on or before April 25, 2023, must be in compliance with the requirements listed in paragraphs (n)(1) through (9) of this section upon initial startup or on July 15, 2027, whichever is later. All affected sources that commenced construction or reconstruction after April 25, 2023, must be in compliance with the requirements listed in paragraphs (n)(1) through (9) of this section upon initial startup, or on July 15, 2024, whichever is later.(1) The general requirements specified in § 63.483(e), § 63.504(a), § 63.504(a)(1)(iii), and § 63.506(e)(6)(iii)(C).(2) For flares, the requirements specified in § 63.508.(3) For storage vessels, the requirements specified in § 63.484(t) and § 63.506(e)(4)(ii)(F)(6).(4) For continuous front-end process vents, the requirements specified in §§ 63.485(l)(6), (o)(6), (p)(5), (q)(1)(vii), (x), § 63.503(g)(2)(iii)(B)(4), and § 63.506(e)(4)(ii)(F)(6).(5) For batch front-end process vents, the requirements specified in §§ 63.487(a)(3), (b)(3), and (e)(1)(iv) and (i), §§ 63.488(d)(2), (e)(4), (f)(2), and (g)(3), §§ 63.489(b)(10) and (d)(3), §§ 63.491(d)(1)(iii), (e)(6), and (h), § 63.492(g), and Table 6 to this subpart, item 3 in column 3 for diversion to the atmosphere and monthly inspections of sealed valves for all control devices.(6) For back-end processes, the requirements specified in §§ 63.497(a)(8) and (d)(3), and § 63.498(d)(5)(v).(8) For equipment leaks, the requirements specified in §§ 63.502(a)(2) and (k)(2).(9) For heat exchange systems, the requirements specified in §§ 63.502(n)(7) and (n)(8).
Citations to §63.481(n)(9)
-
(n) All affected sources that commenced construction or reconstruction on or before April 25, 2023, must be in compliance with the requirements listed in paragraphs (n)(1) through (9) of this section upon initial startup or on July 15, 2027, whichever is later. All affected sources that commenced construction or reconstruction after April 25, 2023, must be in compliance with the requirements listed in paragraphs (n)(1) through (9) of this section upon initial startup, or on July 15, 2024, whichever is later.(1) The general requirements specified in § 63.483(e), § 63.504(a), § 63.504(a)(1)(iii), and § 63.506(e)(6)(iii)(C).(2) For flares, the requirements specified in § 63.508.(3) For storage vessels, the requirements specified in § 63.484(t) and § 63.506(e)(4)(ii)(F)(6).(4) For continuous front-end process vents, the requirements specified in §§ 63.485(l)(6), (o)(6), (p)(5), (q)(1)(vii), (x), § 63.503(g)(2)(iii)(B)(4), and § 63.506(e)(4)(ii)(F)(6).(5) For batch front-end process vents, the requirements specified in §§ 63.487(a)(3), (b)(3), and (e)(1)(iv) and (i), §§ 63.488(d)(2), (e)(4), (f)(2), and (g)(3), §§ 63.489(b)(10) and (d)(3), §§ 63.491(d)(1)(iii), (e)(6), and (h), § 63.492(g), and Table 6 to this subpart, item 3 in column 3 for diversion to the atmosphere and monthly inspections of sealed valves for all control devices.(6) For back-end processes, the requirements specified in §§ 63.497(a)(8) and (d)(3), and § 63.498(d)(5)(v).(8) For equipment leaks, the requirements specified in §§ 63.502(a)(2) and (k)(2).(9) For heat exchange systems, the requirements specified in §§ 63.502(n)(7) and (n)(8).
Citations to §63.481(o)
-
(u) For each affected source as described in § 63.480, beginning no later than the compliance dates specified in § 63.481(o), if the storage vessel (of any capacity and vapor pressure) stores liquid containing chloroprene such that the storage vessel is considered to be in chloroprene service, as defined in § 63.482, then the owner or operator must comply with the requirements of paragraphs (u)(1) through (3) of this section in addition to all other applicable requirements specified in § 63.483 and elsewhere in this section.(1) Reduce emissions of chloroprene by venting emissions through a closed vent system to a non-flare control device that reduces chloroprene by greater than or equal to 98 percent by weight, or to a concentration less than 1 ppmv for each storage vessel vent. If a combustion device is used, the chloroprene concentration of 1 ppmv must be corrected to 3 percent oxygen.(2) To demonstrate compliance with the emission limits specified in paragraph (u)(1) of this section for storage vessels in chloroprene service, owners and operators must meet the requirements specified in § 63.510.(3) Owners and operators must keep the records specified in paragraphs (u)(3)(i) and (u)(3)(ii) of this section in addition to those records specified elsewhere in this section.(i) For storage vessels in chloroprene service, records of the concentration of chloroprene of the fluid stored in each storage vessel.(ii) The owner or operator must keep records of all periods during which operating values are outside of the applicable operating limits specified in § 63.510(b)(4) through (6) when regulated material is being routed to the non-flare control device. The record must specify the operating parameter, the applicable limit, and the highest (for maximum operating limits) or lowest (for minimum operating limits) value recorded during the period.
-
(y) For each affected source as described in § 63.480, beginning no later than the compliance dates specified in § 63.481(o), if the Group 1 or Group 2 continuous front-end process vent contains chloroprene such that it is considered to be in chloroprene service, as defined in § 63.482, then the owner or operator must comply with the requirements of paragraphs (y)(1) through (4) of this section in addition to all other applicable requirements specified in § 63.483 and elsewhere in this section.(1) Reduce emissions of chloroprene by venting emissions through a closed vent system to a non-flare control device that reduces chloroprene by greater than or equal to 98 percent by weight, or to a concentration less than 1 ppmv for each process vent or to less than 5 pounds per year for all combined process vents within the process. If a combustion device is used, the chloroprene concentration of 1 ppmv must be corrected to 3 percent oxygen.(2) To demonstrate compliance with the emission limits specified in paragraph (y)(1) of this section for continuous front-end process vents in chloroprene service, owners and operators must meet the requirements specified in § 63.510.(3) Owners and operators must keep the records specified in paragraphs (y)(3)(i) and (y)(3)(ii) of this section in addition to those records specified elsewhere in this section.(i) For process vents, include all uncontrolled, undiluted chloroprene concentration measurements, and the calculations used to determine the total uncontrolled chloroprene mass emission rate for the sum of all vent gas streams.(ii) The owner or operator must keep records of all periods during which operating values are outside of the applicable operating limits specified in § 63.510(b)(4) through (6) when regulated material is being routed to the non-flare control device. The record must specify the operating parameter, the applicable limit, and the highest (for maximum operating limits) or lowest (for minimum operating limits) value recorded during the period.(4) The Periodic Report must include the records for the periods specified in paragraph (y)(3)(ii) of this section. Indicate the start date, start time and duration in hours for each period.
-
(j) For each affected source as described in § 63.480, beginning no later than the compliance dates specified in § 63.481(o), if the Group 1 or Group 2 batch front-end process vent contains chloroprene such that it is considered to be in chloroprene service, as defined in § 63.482, then the owner or operator must comply with the requirements of paragraphs (j)(1) through (j)(4) of this section in addition to all other applicable requirements specified in § 63.483 and elsewhere in this section.(1) Reduce emissions of chloroprene by venting emissions through a closed vent system to a non-flare control device that reduces chloroprene by greater than or equal to 98 percent by weight, or to a concentration less than 1 ppmv for each process vent or to less than 5 pounds per year for all combined process vents within the process. If a combustion device is used, the chloroprene concentration of 1 ppmv must be corrected to 3 percent oxygen.(2) To demonstrate compliance with the emission limits specified in paragraph (j)(1) of this section for batch front-end process vents in chloroprene service, owners and operators must meet the requirements specified in § 63.510.(3) Owners and operators must keep the records specified in paragraphs (j)(3)(i) and (j)(3)(ii) of this section in addition to those records specified elsewhere in this section.(i) For process vents, include all uncontrolled, undiluted chloroprene concentration measurements, and the calculations used to determine the total uncontrolled chloroprene mass emission rate for the sum of all vent gas streams.(ii) The owner or operator must keep records of all periods during which operating values are outside of the applicable operating limits specified in § 63.510(b)(4) through (6) when regulated material is being routed to the non-flare control device. The record must specify the operating parameter, the applicable limit, and the highest (for maximum operating limits) or lowest (for minimum operating limits) value recorded during the period.(4) The Periodic Report must include the records of periods specified in paragraph (j)(3)(ii) of this section. Indicate the start date, start time and duration in hours for each period.
-
(7) For each affected source as described in § 63.480, beginning no later than the compliance dates specified in § 63.481(o), if the back-end process vent contains chloroprene such that it is considered to be in chloroprene service, as defined in § 63.482, then the owner or operator must comply with the requirements of paragraphs (a)(7)(i) through (iii) of this section in addition to all other applicable requirements specified in § 63.483 and elsewhere in this section.(i) Reduce emissions of chloroprene by venting emissions through a closed vent system to a non-flare control device that reduces chloroprene by greater than or equal to 98 percent by weight, or to a concentration less than 1 ppmv for each process vent or to less than 5 pounds per year for all combined process vents within the process. If a combustion device is used, the chloroprene concentration of 1 ppmv must be corrected to 3 percent oxygen.(ii) To demonstrate compliance with the emission limits specified in paragraph (a)(7)(i) of this section for back-end process vents in chloroprene service, owners and operators must meet the requirements specified in § 63.510.(iii) An owner or operator may designate a back-end process vent in chloroprene service as a maintenance vent if the vent is only used as a result of startup, shutdown, maintenance, or inspection of equipment where equipment is emptied, depressurized, degassed, or placed into service; however, owners and operators may not release more than 1.0 tons of chloroprene from all maintenance vents combined (i.e., including maintenance vents subject to this paragraph (a)(7)(iii), § 63.485(z), or § 63.487(i)(4)) per any consecutive 12-month period. The owner or operator must keep monthly records of the quantity in tons of chloroprene released from each maintenance vent and include a description of the method used to estimate this quantity.
-
(iv) For each affected source as described in § 63.480, beginning no later than the compliance dates specified in § 63.481(o), the provisions specified in § 63.132(c)(1)(iii) do not apply. Instead, if the wastewater stream contains chloroprene such that it is considered to be in chloroprene service, as defined in § 63.482, then the wastewater stream is a Group 1 wastewater stream. For wastewater streams in chloroprene service, owners and operators must also meet the requirements specified in § 63.510.
-
(3) Substitute “For each affected source as described in § 63.480, beginning no later than the compliance dates specified in § 63.481(o),” for each occurrence of “For each source as defined in § 63.101, and for each source as defined in § 63.191, beginning no later than the compliance dates specified in § 63.100(k)(11),”.
-
This section applies beginning no later than the compliance dates specified in § 63.481(o). To determine if process vents, storage vessels, or wastewater in a process at affected sources producing neoprene are in chloroprene service, as defined in § 63.482, owners and operators must comply with the requirements in paragraphs (a) through (c) of this section, as applicable.
-
This section applies beginning no later than the compliance dates specified in § 63.481(o). In order to demonstrate compliance with the emission limits and work practice standards specified in § 63.485(y) (for continuous front-end process vents in chloroprene service), § 63.487(j) (for batch front-end process vents in chloroprene service), § 63.494(a)(7) (for back-end process vents in chloroprene service), § 63.484(u) (for storage vessels in chloroprene service), and § 63.501(a)(10)(iv) (for wastewater in chloroprene service), owners and operators must meet the requirements specified in paragraphs (a) and (b) of this section.
Citations to §63.481(p)
-
(4) Substitute “For each affected source as described in § 63.480, beginning no later than the compliance dates specified in § 63.481(p),” for each occurrence of “For each source as defined in § 63.101, and for each source as defined in § 63.191, beginning no later than the compliance dates specified in § 63.100(k)(12),”.