§63.423. Standards: Storage vessels. — Inbound Citations
40 C.F.R. § 63.423
Statutory Authority
Cited by 15 regulations in release Current.
Citations to 40 U.S.C. § 63.423 as a whole
-
(1) A bulk gasoline terminal that is not subject to the control requirements of 40 CFR part 63, subpart R (§§ 63.422, 63.423, and 63.424) or 40 CFR part 63, subpart CC (§§ 63.646, 63.648, 63.649, and 63.650).
-
(d) The owner or operator of each gasoline storage vessel subject to the provisions of § 63.423 shall comply with § 60.113b of this chapter and, if applicable, the provisions in paragraph (j) of this section. If a closed vent system and control device are used, as specified in § 60.112b(a)(3) of this chapter, to comply with the requirements in § 63.423, the owner or operator shall also comply with the requirements in paragraph (d)(1) or (2) of this section, as applicable.(1) If the gasoline storage vessel is subject to the provision in § 63.423(a) or the provision in § 63.423(b) and a control device other than a flare is used for the gasoline storage vessel, the owner or operator shall also comply with the requirements in paragraph (b) of this section.(2) If the gasoline storage vessel is subject to the provision in § 63.423(b) and a flare is used as the control device for the gasoline storage vessel, you must comply with the requirements in § 60.502a(c)(3) of this chapter as indicated in paragraphs (d)(2)(i) and (ii) of this section rather than the requirements in § 60.18(e) and (f) of this chapter as specified in § 60.113b(d) of this chapter.(i) At § 60.502a(c)(3)(i) of this chapter, replace “vapors displaced from gasoline cargo tanks during product loading” with “vapors from the gasoline storage vessel.”(ii) Section 60.502a(c)(3)(vi) through (ix) of this chapter does not apply.
-
-
(e) Each owner or operator of gasoline storage vessels subject to the provisions of § 63.423 shall comply with the monitoring requirements in § 60.116b of this chapter, except records shall be kept for at least 5 years. If a closed vent system and control device are used, as specified in § 60.112b(a)(3) of this chapter, to comply with the requirements in § 63.423, the owner or operator shall also comply with the requirements in paragraph (e)(1) or (2) of this section, as applicable.(1) If the gasoline storage vessel is subject to the provision in § 63.423(a) or if the gasoline storage vessel is subject to the provision in § 63.423(b) and a control device other than a flare is used for the gasoline storage vessel, the owner or operator shall also comply with the requirements in paragraph (a) of this section.(2) If the gasoline storage vessel is subject to the provision in § 63.423(b) and a flare is used as the control device for the affected gasoline storage vessel, you must comply with the monitoring requirements in § 60.504a(c) of this chapter.
-
(7) For each gasoline storage vessel subject to requirements in § 63.423, report:(i) The information specified in § 60.115b(a) or (b) of this chapter or deviations in measured parameter values from the plan specified in § 60.115b(c) of this chapter, depending upon the control equipment installed, or, if applicable, the information specified in § 63.1066(b).(ii) If you are complying with § 63.423(b)(2), for each deviation in LEL monitoring, report:(B) Description of the monitoring event, e.g., monitoring conducted concurrent with visual inspection required under § 60.113b(a)(2) of this chapter or § 63.1063(d)(2); monitoring that occurred on a date other than the visual inspection required under § 60.113b(a)(2) or § 63.1063(d)(2); re-monitoring due to high winds; re-monitoring after repair attempt.(E) If the floating roof was repaired or replaced, also report the information in paragraphs (m)(7)(ii)(A) through (D) of this section for each re-monitoring conducted to confirm the repair.
-
(1) Approval of alternatives to the requirements in §§ 63.420, 63.422 through 63.423, and 63.424. Any owner or operator requesting to use an alternative means of emission limitation for storage vessels covered by § 63.423 must follow the procedures in § 63.426.
Citations to §63.423(a)
-
(1) If the gasoline storage vessel is subject to the provision in § 63.423(a) or the provision in § 63.423(b) and a control device other than a flare is used for the gasoline storage vessel, the owner or operator shall also comply with the requirements in paragraph (b) of this section.
-
(1) If the gasoline storage vessel is subject to the provision in § 63.423(a) or if the gasoline storage vessel is subject to the provision in § 63.423(b) and a control device other than a flare is used for the gasoline storage vessel, the owner or operator shall also comply with the requirements in paragraph (a) of this section.
Citations to §63.423(b)
-
(1) If the gasoline storage vessel is subject to the provision in § 63.423(a) or the provision in § 63.423(b) and a control device other than a flare is used for the gasoline storage vessel, the owner or operator shall also comply with the requirements in paragraph (b) of this section.
-
(1) If the gasoline storage vessel is subject to the provision in § 63.423(a) or if the gasoline storage vessel is subject to the provision in § 63.423(b) and a control device other than a flare is used for the gasoline storage vessel, the owner or operator shall also comply with the requirements in paragraph (a) of this section.
Citations to §63.423(b)(2)
-
(j) Compliance with the vapor concentration below the LEL level for internal floating roof storage vessels at § 63.423(b)(2) shall be determined based on the procedures specified in paragraphs (j)(1) through (5) of this section. If tubing is necessary to obtain the measurements, the tubing must be non-crimping and made of Teflon or other inert material.(1) LEL monitoring must be conducted at least once every 12 months and at other times upon request by the Administrator. If the measurement cannot be performed due to wind speeds exceeding those specified in paragraph (j)(3)(iii) of this section, the measurement must be performed within 30 days of the previous attempt.(2) The calibration of the LEL meter must be checked per manufacturer specifications immediately before and after the measurements as specified in paragraphs (j)(2)(i) and (ii) of this section. If tubing will be used for the measurements, the tubing must be attached during calibration so that the calibration gas travels through the entire measurement system.(i) The calibration gas must contain a single hydrocarbon at a concentration corresponding to 50 percent of the LEL (e.g., 2.50 percent by volume when using methane as the calibration gas). The vendor must provide a Certificate of Analysis for the gas, and the certified concentration must be within ±2 percent (e.g., 2.45 percent—2.55 percent by volume when using methane as the calibration gas). The LEL span response must be between 49 percent and 51 percent. If the span check prior to the measurements does not meet this requirement, the LEL meter must be recalibrated or replaced. If the span check after the measurements does not meet this requirement, the LEL meter must be recalibrated or replaced, and the measurements must be repeated.(ii) Check the instrumental offset response using a certified compressed gas cylinder of zero air or an ambient environment that is free of organic compounds. The pre-measurement instrumental offset response must be 0 percent LEL. If the LEL meter does not meet this requirement, the LEL meter must be recalibrated or replaced.(i) Measurements of the vapors within the internal floating roof storage vessel must be collected no more than 3 feet above the internal floating roof.(ii) Measurements shall be taken for a minimum of 20 minutes, logging the measurements at least once every 15 seconds, or until one 5-minute average as determined according to paragraph (j)(5)(ii) of this section exceeds the level specified in § 63.423(b)(2).(iii) Measurements shall be taken when the wind speed at the top of the tank is 5 mph or less to the extent practicable, but in no case shall measurements be taken when the sustained wind speed at top of tank is greater than the annual average wind speed at the site or 15 mph, whichever is less.(iv) Measurements should be conducted when the internal floating roof is floating with limited product movement (limited filling or emptying of the tank).(4) To determine the actual vapor concentration within the storage vessel, the percent of the LEL “as the calibration gas” must be corrected according to one of the following procedures. Alternatively, if the LEL meter used has correction factors that can be selected from the meter's program, you may enable this feature to automatically apply one of the correction factors specified in paragraphs (j)(4)(i) and (ii) of this section.(i) Multiply the measurement by the published gasoline vapor correction factor for the specific LEL meter and calibration gas used.(ii) If there is no published correction factor for gasoline vapors for the specific LEL meter used, multiply the measurement by the published correction factor for butane as a surrogate for determining the LEL of gasoline vapors. The correction factor must correspond to the calibration gas used.(5) Use the calculation procedures in paragraphs (j)(5)(i) through (iii) of this section to determine compliance with the LEL level.(i) For each minute while measurements are being taken, determine the one-minute average reading as the arithmetic average of the corrected individual measurements (taken at least once every 15 seconds) during the minute.(ii) Starting with the end of the fifth minute of data, calculate a five-minute rolling average as the arithmetic average of the previous five one-minute readings determined under paragraph (j)(5)(i) of this section. Determine a new five-minute average reading for every subsequent one-minute reading.(iii) Each five-minute rolling average must meet the LEL level specified in § 63.423(b)(2).
-
(e) Each owner or operator of storage vessels subject to the provisions of this subpart shall keep records as specified in § 60.115b of this chapter, except records shall be kept for at least 5 years. Additionally, for each storage vessel complying with the provisions in § 63.423(b)(2), keep records of each LEL monitoring event as specified in paragraphs (e)(1) through (9) of this section.(2) A description of the monitoring event (e.g., monitoring conducted concurrent with visual inspection required under § 60.113b(a)(2) of this chapter or § 63.1063(d)(2); monitoring that occurred on a date other than the visual inspection required under § 60.113b(a)(2) or § 63.1063(d)(2); re-monitoring due to high winds; re-monitoring after repair attempt).(4) The LEL meter manufacturer and model number used, as well as an indication of whether tubing was used during the LEL monitoring, and if so, the type and length of tubing used.(5) Calibration checks conducted before and after making the measurements, including both the span check and instrumental offset. This includes the hydrocarbon used as the calibration gas, the Certificate of Analysis for the calibration gas(es), the results of the calibration check, and any corrective action for calibration checks that do not meet the required response.(7) The records should indicate whether the recorded values were automatically corrected using the meter's programming. If the values were not automatically corrected, record both the raw (as the calibration gas) and corrected measurements, as well as the correction factor used.(9) If the vapor concentration of the storage vessel was above 25 percent of the LEL on a 5-minue rolling average basis, a description of whether the floating roof was repaired, replaced, or taken out of gasoline service.
Citations to §63.423(c)(1)
-
(c) Each gasoline storage vessel at bulk gasoline terminals and pipeline breakout stations shall be in compliance with the requirements of this section as expeditiously as practicable, but no later than the dates provided in paragraphs (c)(1) through (3) of this section.(1) For facilities that commenced construction on or before February 8, 1994, each gasoline storage vessel shall meet the requirements in paragraph (a) of this section no later than December 15, 1997. Beginning no later than May 8, 2027, paragraph (a) of this section no longer applies and each gasoline storage vessel shall meet the requirements in paragraphs (b)(1) and (2) of this section no later than May 8, 2027. If applicable, the fitting controls required in paragraph (b)(3) of this section must be installed the next time the storage vessel is completely emptied and degassed, or by May 8, 2034, whichever occurs first.(2) For facilities that commenced construction after February 8, 1994, and on or before June 10, 2022, each gasoline storage vessel shall meet the requirements in paragraph (a) of this section upon startup. Beginning no later than May 8, 2027, paragraph (a) of this section no longer applies and each gasoline storage vessel shall meet the requirements in paragraphs (b)(1) and (2) of this section no later than May 8, 2027. If applicable, the fitting controls required in paragraph (b)(3) of this section must be installed the next time the storage vessel is completely emptied and degassed, or by May 8, 2034, whichever occurs first.(3) For facilities that commenced construction after June 10, 2022, each owner or operator shall meet the requirements in paragraph (b) of this section upon startup or July 8, 2024, whichever is later.
Citations to §63.423(c)(2)
-
(c) Each gasoline storage vessel at bulk gasoline terminals and pipeline breakout stations shall be in compliance with the requirements of this section as expeditiously as practicable, but no later than the dates provided in paragraphs (c)(1) through (3) of this section.(1) For facilities that commenced construction on or before February 8, 1994, each gasoline storage vessel shall meet the requirements in paragraph (a) of this section no later than December 15, 1997. Beginning no later than May 8, 2027, paragraph (a) of this section no longer applies and each gasoline storage vessel shall meet the requirements in paragraphs (b)(1) and (2) of this section no later than May 8, 2027. If applicable, the fitting controls required in paragraph (b)(3) of this section must be installed the next time the storage vessel is completely emptied and degassed, or by May 8, 2034, whichever occurs first.(2) For facilities that commenced construction after February 8, 1994, and on or before June 10, 2022, each gasoline storage vessel shall meet the requirements in paragraph (a) of this section upon startup. Beginning no later than May 8, 2027, paragraph (a) of this section no longer applies and each gasoline storage vessel shall meet the requirements in paragraphs (b)(1) and (2) of this section no later than May 8, 2027. If applicable, the fitting controls required in paragraph (b)(3) of this section must be installed the next time the storage vessel is completely emptied and degassed, or by May 8, 2034, whichever occurs first.(3) For facilities that commenced construction after June 10, 2022, each owner or operator shall meet the requirements in paragraph (b) of this section upon startup or July 8, 2024, whichever is later.
Citations to §63.423(c)(3)
-
(c) Each gasoline storage vessel at bulk gasoline terminals and pipeline breakout stations shall be in compliance with the requirements of this section as expeditiously as practicable, but no later than the dates provided in paragraphs (c)(1) through (3) of this section.(1) For facilities that commenced construction on or before February 8, 1994, each gasoline storage vessel shall meet the requirements in paragraph (a) of this section no later than December 15, 1997. Beginning no later than May 8, 2027, paragraph (a) of this section no longer applies and each gasoline storage vessel shall meet the requirements in paragraphs (b)(1) and (2) of this section no later than May 8, 2027. If applicable, the fitting controls required in paragraph (b)(3) of this section must be installed the next time the storage vessel is completely emptied and degassed, or by May 8, 2034, whichever occurs first.(2) For facilities that commenced construction after February 8, 1994, and on or before June 10, 2022, each gasoline storage vessel shall meet the requirements in paragraph (a) of this section upon startup. Beginning no later than May 8, 2027, paragraph (a) of this section no longer applies and each gasoline storage vessel shall meet the requirements in paragraphs (b)(1) and (2) of this section no later than May 8, 2027. If applicable, the fitting controls required in paragraph (b)(3) of this section must be installed the next time the storage vessel is completely emptied and degassed, or by May 8, 2034, whichever occurs first.(3) For facilities that commenced construction after June 10, 2022, each owner or operator shall meet the requirements in paragraph (b) of this section upon startup or July 8, 2024, whichever is later.